HomeMy WebLinkAbout20191002Morning View to Staff 5-9.pdfhn,r/ v- r^l- lQ -o I
october L,zoLs RECil IVED
?il19 OCT -2 Al{ 9: kt+
AnSweTsfoTtheSECONDPRODUCTIONREQUESTOFTHECOMMISIONSTAFFTOMORNINGViI[,W,,.;;ri-t,l-ii_:
WATER COMpANy: "'.r , i:r. .. i'i;t'-.ll-i:: trjiij
Pursuant to Commission Rules of Procedure, the person preparing this document is:
David Reading
208-745-OO29
Records Located At:
MORNING VIEW WATER COMPANY
P.O. Box 598
3996 E 200 N
Rigby, lD 83442
208-745-OO29
Reference : I DAPA 3L.0L.OL.228
REQUEST #5:
Per our conversation with Joe Terry on September 23, 2019, usage disparities will discussed during on-
site investigation. The following tables show the usage in gallons of the Morning View Water office, and
the Gneiting residence.
20L6 20L7 2018 20L9
JAN 3,890 4,tLO 40e0
FEB 3,750 3,23O 4,270
MAR 4,09O 4,L@ 4,L60
APR 3,550 46,380 24,760
MAY L87,590 100,100 53,770
JUN 217,380 157,500 L82,5rO
JUL 262,080 242,O00 319,630
AUG 296,530 268,690 2L7,740
SEP 150,580 !45,990
ocr 18,300 4,480
NOV 3,950 4,420
DEC 4,57O 5,37O 4,7OO
2016 20L7 2018 zoLg
JAN 600 1,010 2,900
FEB 450 620 830
MAR 620 22,730 1,800
APR 460 L8,240 2,520
MAY 470 L6,4ffi 8,430
JUN 5,550 L4,7LO 7,380
JUL 720 12,300 6,970
AUG 4ffi L2,47O 5,000
SEP 610 &030
ocT 850 9,080
NOV 4,8L0 7,920
DEC 400 8,880 8,740
GNEITING MVW OFFICE
REQUEST #6:
The monthly electric service billing statements for each system pump from January 2015 through the
most recent billing period are in a separate file being send along with this one. They are approximately
210 pages.
REQUEST #7:
Sales have been to companies and contractors. Work has been done by Landco Building and
Development. Yes, prices could increase if labor and materials increase. The last 4 sales were 51253.75
each for installation.
REQUEST #8:
The cost of a new meter is 5259.13 per H.D Fowler Company.
REQUEST #9:
A backhoe operator is typically hired for 1 to 2 hours, but sometimes it has been as high as 4 or 5 hours
Nolan Gneiting plus another worker do the installation and they work 2 to 3 hours each. However, if
workers have to tap into the main water line, a special piece of equipment has to be rented (1 hour
travel each way), and is needed for 2 or 3 additional hours.