Loading...
HomeMy WebLinkAbout20080915DEQ - inspection, meeting.pdfl STATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY RECEIVED 200SEP 15 AM 8= 19 1..\1SIO.kL. "Butch" Oter, Governor. S N Toni Hardesty, Direcor 900 North Skyline Drive, Suite B . Idaho Falls, Idaho 83402 . (208) 528-2650 September 12, 2008 Nolan Gneiting Morning View Water Company P.O. Box 595 Rigby, ID 83442 Certfied Mail: 70051820000467546698 l1NV-W -db-Õl Morning View Water System Inspection and Meeting PWS# 7260063 Dear Mr. Gneiting: This letter is to confirm the discussion between you, Ryan Lofts of Aspen Engineering, and Rochelle Mason and Greg Eager of the Deparent of Environmental Quality (Deparent) at the Morning View Water System on September 9,2008. A site inspection was conducted to evaluate the water system's sanitar survey significant deficiencies with respect to the October 25,2007 Consent Order and Idaho Rules for Public Drnkg Water Systems (IDAPA 58.01.08). Additionally, we discussed the Deparent's September 2,2008 letter regarding the Morning View Water System August 2008 Facility Plan. We provided water pressure data collected by the Deparent confirming recurg pressures below 40 pounds per square inch (psi) and non compliance with IDAPA 58.01.08.552.b.i. As a result Morning View committed to address the removal of individual booster pumps and water pressure demand as recommended in the August 2008 Facility Plan. You confrmed water meters wil also be installed on the larger lots. We suggested you consider installing pressure monitorig stations thoughout the system. . The number of service connection has increased by 35% since 2002; however the backup well cannot provide peak hour demand with the larger well out of service as required by IDAP A 58.01.08.513. The Deparent is aware that Morning View Water Company has applied for but not received additional water rights by the Idaho Deparent of Water Resources. The Water Company expressed the desire to add an additional source upon securing the water right. In accordance with IDAPA 58.01.08.100.06 Monitoring Frequency and Compliance Requirements for Radioactivity in Community Water Systems, Morning View is required to complete quaerly Radium 226 monitorig. You provided the Radium 226 analysis report for a sample collected on Febru 15,2008. Your laboratory confired a Radium 226 sample was collected and submitted on September 4, 2008. Please be aware although laboratories are required to provide analysis report to the Deparent, you need to confirm the Deparent has received a copy. According to our records, the Deparent has not reeived payment for the 2008 anual drnkng water fee. You indicated that was correct and committed to mail a check for fees to the Deparent. As discussed, Morning View committed to develop and implement a cross connection control program as required by IDAPA 58.01.08.552.06. SCANNED SEP 122008 q h 3.) Consent Order Compliance During the inspection, the Deparent confirmed the significant sanitary deficiencies identified in the October 9, 2003 and July 10,2008 sanita surveys have been adequately addressed. Section 9.a ofthe Consent Order has been satisfied. Morning View is currently in compliance with Sections 9.a., 9.d., 9.e., 9.f., and 9.g. of the Consent Order. However, Morning View remains in non-compliance with the following items of the Consent Order: 9.b. A clarfication on the public notice was provided. The purpose of the public notice is to keep your customers informed ofthe Deparment's water system disapproval, the violations in the Notice of Violation, and of the efforts the water system to resolve the violations. Proof of each quarterly notification provided to Morning View's water users is required to be submitted to the Deparment within ten (10) days of completion. Records indicate the last notification submitted to the Department occurred on March 18, 2008. Notification for the 2nd Quarter of 2008 was not submitted to the Department as required. The notification for the 3rd Quarter of 2008 must be submitted no later than September 30, 2008. Pursuant to your request, I enclosed a copy of Morning View's past public notice. 9.c. Morning View was required to submit a written plan no later than Januar 24, 2008 detailing how a minimum pressure of 40 psi wil be maintained throughout the distribution system. This plan was to include the results of a local pressure monitoring study. You indicated the water system wil follow through with the water pressure improvement recommendations ofthe August 2008 Facilty Plan. 9.h. Morning View was required to submit a plan no later than November 24, 2007 that would ensure that all dead end mains within the water system are equipped with a means of flushing and that all such dead ends are properly flushed. Ryan clarified the labeling on the map in Appendix A of the August Facilty Plan. We confirmed there is one existing dead end not equipped with a hydrant. Installation of a flushing valve on the dead end would satisfy Item 9.h. I wil arange a compliance meeting with our stte offce for a discussion on the appropriate path forward and timely resolution of the outstanding items of the Consent Order and noncompliance with the Idaho Rules for Public Drinking Water Systems. We suggest you bring your engineer to the meeting. I wil let you know when a date is determined. ,ginc~réiy,\../ I ¿~ r ional Administrator C: Bar N. Burell, Water Quality Division Administtor Bryan Zibbell, Drnking Watr Progr Enforcement Coordinator Lace Nielsen, Dring Water Progr Manager Ray Keating, Eastern Idaho Health Deparent Naysha Foster, Jefferson County Planning & Zoning Administrator Chris Hecht, Public Utilities Commission Dennis Dunn, Idaho Water Resources Ryan Lofts, Aspen Engineering