Loading...
HomeMy WebLinkAbout20221222Staff 63 to Gem State.pdfRILEY NEWTON DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-007 4 (208) 334-0318 IDAHO BAR NO. TI2O2 iikil[lvED tr:? fiIr 2? PH 2: Otr '' : ,.i ,-1.-l8LlC; ,: j r'.. ;*(-,1,,i\IISSION Street Address for Express Mail: 1133I W CHINDEN BLVD, BLDG 8, SUITE 2OI-A BOISE, ID 83714 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF GEM STATE WATER COMPANY LLC'S APPLICATION FOR AN ORDER AUTHORIZING AN INCREASE IN ITS RATES AND CHARGES FOR WATER SERVICE IN THE STATE OF IDAHO CASE NO. GSW-W-22-01 SIXTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO GEM STATE WATER COMPANY Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Riley Newton, Deputy Attorney General, requests that Gem State Water ("Company") provide the following documents and information as soon as possible, but no later than THURSDAY, DECEMBER 29, 2022.1 This Production Request is to be considered as continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it, or any person acting on its behalf, may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, identification of the original water system, I Stuff i. requesting an expedited response. If responding by this date will be problematic, please call Staff s attorney at (208) 334-0318. SIXTH PRODUCTION REQUEST TO GEM STATE WATER ) ) ) ) ) ) ) ) ) 1 DECEMBER2Z,2022 allowing the data to be sorted accordingly. Include the name, job title, and telephone number of the person preparing the documents. Please also identiff the name, job title, location, and telephone number of the record holder. In addition to the written copies provided as response to the requests, please provide all Excel spreadsheets and electronic files on CD with formulas intact and enabled. REQUEST NO. 63: Please describe the typical work that would be required to install a new water service connection in the Company's service area. For example, would a new connection require a hot tap, service piping, curb stop, pit seffer and meter? If any of the Company's water systems have some of the service infrastructure already installed, such as a tap, service piping, and curb stop, please provide a list summarinngthe infrastructure status for each system. DATED at Boise,Idaho, this H /-/ day of December 2022. tu-.Riley N Deputy Attorney General i:umisc:prodreq/gsww22. I mms prod req 6 SIXTH PRODUCTION REQUEST TO GEM STATE WATER 2 DECEMBERZZ,2022 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 22ND DAY OF DECEMBER 2022, SERVED THE FOREGOING SIXTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO GEM STATE WATER COMPANY, IN CASE NO. GSW-W-22.01, BY E-MAILING A COPY THEREOF TO THE FOLLOWING: LESLIE ABRAMS-RAYNER GENERAL MANAGER GEM STATE WATER CO PO BOX 3388 COEUR D'ALENE ID 83816 E-MAIL: leslie(Esemstate-water.com ERIC WNELSEN ADAM RUE NWNATURAL 250 SW TAYLOR ST PORTLAND OR 97204 E-MAIL: eric.nelsen@nwnatural.com SECRETARY CERTIFICATE OF SERVICE