HomeMy WebLinkAbout20070326_1870.pdfDECISION MEMORANDUM
TO:CO MMISSI 0 NER KJELLAND ER
CO MMISSI 0 NER SMITH
COMMISSIONER REDFORD
COMMISSION SECRETARY
COMMISSION STAFF
LEGAL
FROM:CECELIA A. GASSNER
DATE:MARCH 23, 2007
SUBJECT:IN THE MATTER OF EDGE WIRELESS, LLC'S APPLICATION FOR
DESIGNATION AS AN ELIGIBLE TELECOMMUNICATIONS
CARRIER, CASE NO. EDG-07-
On January 22 , 2007, Edge Wireless LLC ("Edge" or "Company ) filed an
Application for designation as an eligible telecommunications carrier (ETC) for service areas in
Idaho that are currently serviced by other carriers. See Idaho Code ~ 61-610A and Order No.
29841. Also see 47 U.C. ~ 214(e)(2). The Application requests that it be designated as eligible
to receive all available support from the federal Universal Service Fund ("USF") and that it be
approved to participate in the Lifeline program.
On February 6, 2007, WWC Holding, Inc. dba Allte1 filed a Petition to Intervene
which was granted on March 7, 2007. Order No. 30265. On February 16, 2007, the Idaho
Telephone Association (IT A) filed a Petition to Intervene, which was also granted on March 7
2007. Order No. 30264. On February 12 2007, the Commission issued a Notice of Application
and Modified Procedure and solicited comments from interested parties. Order No. 30240. Staff
timely filed its comments. On March 13 2007, the ITA filed a Protest and Comments.
THE APPLICATION
According to the Application, Edge is a commercial mobile radio service ("CMRS"
carrier providing "mobile service" as defined in 47 US.c. ~ 153(27). Through its cellular
authorizations, it provides service to the following counties in Idaho: Bannock, Bear Lake
Blaine, Bingham, Bonneville, Butte, Camas, Caribou, Cassia, Clark, Custer, Franklin, Fremont
Gooding, Jefferson, Jerome, Lemhi, Lincoln, Madison, Minidoka, Oneida, Power, Teton, and
DECISION MEMORANDUM
Twin Falls. Edge also operates in northern California, southeastern Oregon, and northwestern
Wyoming.
The Application contains certain information related to the Company s local usage
plans, customer service and ability to provide service, particularly in emergencies.The
Company provides several pricing options for its customers, and also intends to invest funds in
upgrading its infrastructure.
THE PROTEST
The IT A asserts that the Application inaccurately states the law. IT A Protest and
Comments at 1-2. It further asserts that nothing in the Application demonstrates that Edge
service will be ubiquitous in the wire centers or that it will not engage in cream skimming of the
incumbent rural telephone companies ' most profitable areas. Id. at 3. Lastly, it argues that,
because Edge filed its two-year plan as a confidential document, the IT A is unable to assess
whether that two-year plan meets the Commission s requirements. Id. at 3-4. The ITA asserted
that Modified Procedure is not appropriate for this matter and requested a hearing. Id. at 4.
In its reply, Edge asserts that the ITA mischaracterized its Application, and that the
IT A ignored Edge s discussion regarding the public interest standard. Edge Reply Comments at
2. Edge also states that the ITA errs in its argument that the Commission must grant Edge ETC
status throughout its entire service area. Id. It also states that, contrary to the IT A's assertion, it
has met the requirement for demonstrating a commitment to provide service to customers in the
relevant rural ILEC study areas. Id. at 3.
Lastly, Edge argues that the Commission should reject the IT A's request for a
hearing. Id. at 4. Edge states that the ITA never requested a copy of any of the confidential
exhibits to the Application or otherwise sought to review the information the IT A alleges it must
see in order to make any conclusion as to whether the Application is complete. Id.
ST AFF COMMENTS
Staff reviewed Edge s Application and conducted an analysis of the Company
fulfillment of the federal Telecommunications Act of 1996 ("the Act") and of Commission Order
No. 29841. In addition, Staff analyzed the merits of awarding ETC designation separately under
the two wire center classifications of non-rural and rural wire center service areas.
DECISION MEMORANDUM
Non-rural Wire Centers
Staff noted that Edge identifies the non-rural wire centers in the Qwest Corporation
service areas of central Idaho to the Montana and Wyoming borders as identified in Exhibit C to
the Application. The Act treats rural and non-rural service areas differently for the purposes of
ETC designation. When a carrier meets the service requirements set forth in 47 US.C. ~
214( e)( 1) and requests designation in a non-rural area served by an ILEC , the statute provides
that the Commission shall designate more than one common carrier as an ETC. 47 U.C. ~
214(e)(2). Staff Comments at
Staff also noted that designating more than one ETC in a non-rural area is consistent
with past Commission decisions. See Order Nos. 29261 , 29791 , 29686 and 30212. Id. at 2-
Staff believes Edge meets all the statutory ETC requirements of Commission Order No. 29841 as
it relates to non-rural wire centers. Designating Edge as an ETC in the non-rural service areas is
consistent with the "public interest, convenience, and necessity" pursuant to 47 US.C. ~
214(e)(2). Staff also believes granting ETC designation to the non-rural areas is in the public
interest and will benefit the recipients of the Idaho Telecommunications Service Assistance
Support (ITSAP). This designation would also serve the public interest of the consumers who
live in the Fort Hall Reservation and are thus eligible for ITSAP support as well as the federal
Lifeline and Linkup support. Id. at 3.
Based upon past Commission decisions, and consistent with the requirements
Section 214 of the Act, Staff recommended approval of Edge s request for ETC designation in
the non-rural wire centers set forth in Exhibit C of the Application. Id.
Rural Wire Centers
Staff commented that the Application also includes the rural wire centers within the
service areas of Albion Telephone Company, CenturyTel ofIdaho, Inc., Custer Communications
Direct Communications, Filer Mutual, Fremont Telecom Company, Mud Lake, Project Mutual
Silver Star-Teton Telephone, and Silver Star Communications. Id.
Staff noted that when a carrier meets the statutory ETC requirements and requests
designation in a rural area serviced by an ILEC, the Act provides the State Commission with
more discretion, stating that the State Commission may grant ETC designation to the additional
carrier provided that ETC designation for the additional carrier is in the public interest. 47
c. ~ 214(e)(2). Id.
DECISION MEMORANDUM
Under the Act and Order No. 29841 , greater emphasis is placed on scrutinizing ETC
applications in rural service areas. Rural wire centers often have widely disparate population
densities, and therefore, highly disparate cost characteristics. In the Matter of the Federal-State
Joint Board on Universal Service CC Docket No. 96-45 (reI. March 17 2005) 2005 WL 646635
at 21-22 (the "FCC Order ). As such, Staff believes the public interest analysis plays a more
important role when reviewing ETC designation in rural service areas. Id.
Public Interest Analysis
Under Section 214 of the Act, the State Commission must determine that an ETC
designation is consistent with the public interest, convenience and necessity. 47 U.C. ~
214( e )(2).In accordance with the Act, and the ETC requirements of the FCC rules, the
Commission has stated:
(i)n adopting the FCC's proposed public interest analysis, this Commission
adopts an analytical framework for making a public interest determination.
This framework necessarily involves the consideration of certain enumerated
factors, such as the benefits to consumer choice, the unique advantages and
disadvantages of the applicant's service offering, and , where applicable
consideration of creamskimming. However, the Commission may consider
other relevant public interest determinations in its public interest
determination. Order No. 29841 at 15-16.
Staff noted that prior applications were denied by the Commission by placing too much
emphasis on competition and relying on approved state and federal applications in very different
service areas rather than explaining how the relevant applicant's ETC designation would benefit
all the customers in a service area. Staff Comments at 4.
Staff stated that applicants have the burden of proof to demonstrate that the public
interest is served by designating them as an ETC in these rural areas. Order No. 29541 at 6
(citing Virginia Cellular, LLC Petition for Designation as an ETC 19 F.R. 1563 (2004)).
Staff analyzed each of Edge s four primary public interest arguments.
1. Increased Consumer Choice and Service Quality. Staff stated that the Company
makes two main points in support of increased consumer choice and service quality: (a) the
current advantages of wireless versus wire line service in rural areas; and (b) the leveling of the
playing field between wireline and wireless companies for availability of high-cost support. Id.
Staff agreed that, although the modern wireless handset may offer some advantages
over wireline equipment, Staff does not advocate for the use of one technology over another and
DECISION MEMORANDUM
it is not a compelling public interest argument. Id. at 5. With regards to Edge s second
rationale, Staff did not agree with Edge s assertion that wireless service is at a disadvantage to
wireline service that receives high cost USF funding. Id.
Staff acknowledged that the Application provides detailed evidence of how the
Company will use high-cost funds in Idaho. Staff felt it did not have sufficient information to
verify the Company s anecdotal claims that ETC designation increased consumer choice and
service quality in its Oregon service area.In addition, the Application provides no
documentation to support the Company s claim that its network improvement was specifically a
result of ETC designation in Oregon. Id. at 6.
Edge Replv Comments In reply, Edge noted that it is proud of its record for using
USF funds to improve service in Oregon. Edge Reply Comments at 5. It submitted an order of
the Oregon Public Utilities Commission that found that Edge had used its 2005 high cost funds
to further the goals of universal service in Oregon. Id. at Attachment 1. Edge noted that the
Order states:
Edge Wireless had submitted a 5-year plan as part of its application for
designation last year. Edge did a superb job of retaining much of that plan
and carrying through elements of it for implementation in 2006 and 2007, as
their recertification for last year required a plan for only 2005 support
spending. While some projects that were not completed from their 2005 plan
were carried over into their 2006 plans, much of the 2006 and 2007 plans
were new this year.
Id. at 6.
2. Health and Safety Benefits. Staff believes that the Company has demonstrated a
health and safety benefit to the public. It noted that the Company provided illustrative
information regarding the use of its wireless services in emergency situations. Staff Comments
at 6. In addition, Staff stated that the Company demopstrated how reliable wireless phone
service provides a redundant form of communications for ILECs and that during certain
emergency situations, the residents were able to stay connected through the Company s wireless
system. Id.
3. Competitive Response. According to Edge, the resulting network advancement
will boost economic development and encourage the relocation of new businesses that rely on a
high quality advanced telecommunications infrastructure for commercial activities. Id. at 6-
Staff believes that rural wireless carriers are already present and competing with ILECs. It is
DECISION MEMORANDUM
therefore, reasonable to assume that ILECs are already motivated to implement and offer
advanced telecommunications services to retain and attract customers and that ILECs will
continue to do so regardless of whether Edge s ETC Application is approved. Staff does not
believe this a compelling argument to support public interest. Id. at 7.
4. State and Federal Precedent.Staff commented that Edge noted that other State
Commissions have approved other wireless companies' ETC designation applications. Staff
acknowledged that wireless carriers have been approved as ETCs in other states and at the
federal leveL Staff believes this argument has little bearing on whether Edge s Application
meets the public interest analysis in Idaho. Id.
Public Interest Summary
In evaluating the public interest portion of an ETC application, the Commission
weighs whether the potential benefits of ETC designation outweigh the potential harms. One
consideration is whether the applicant is committed to providing universal service throughout the
rural areas or, if not, does the potential for cream skimming exist? Staff believes the Company
avoided the specter of cream skimming as the Application does not include partial wire centers
and addresses all wire centers in a service area. Further, the detailed network plan (Confidential
Exhibit D) and the target network standards (Confidential Exhibit L) demonstrate commitment to
and knowledge of serving rural areas in Idaho. In sum, from the Staffs perspective, the
Application presented three mediocre and one compelling argument in support of the public
interest analysis. However, when combined with the very unlikely possibility of cream
skimming, Staff believes Edge s Application in total presents a reasonable argument to support
the Company s public interest position. Id.
Two-Year Network Improvement Plan
Edge s Application provides detailed information outlining its two-year network
improvement plan. Staff noted that a narrative and two exhibits outline the anticipated
improvements in each wire center with a timetable that begins in the third quarter of 2007 and
continues through the first quarter of 2009. Id. at 8. The submitted plan includes details such as
start date, completion date, the estimated population affected, type of customers, type of
construction and total project cost. Supporting documents include a map of cities with the
current and future wireless coverage clearly delineated (Exhibit D of Application).Staff
DECISION MEMORANDUM
believes that the plan appears to provide improvements throughout the requested wire centers
and shows substantial consideration of each center s needs. Id.
In Staffs opinion, the Company s thoroughness and attention to detail indicates to
Staff that Edge has made an effort to understand the rural wire centers ' deficiencies and has
determined how they plan to improve these wire centers. Id. If granted ETC designation, the
annual submission of the Two-Year Network Improvement Plan and Progress Report will hold
the Company accountable for making a reasonable effort to implement the network improvement
plan. See Appendix Reporting Requirements, Order No. 29841.
Ability to Remain Functional in Emergencies
Staff stated that the Application provides a detailed description of the Company
access to emergency services and ability to remain functional in emergency situations through
the use of back-up support for their Mobile Switching Center and cell sites, a fault tolerant
network, 24X7 Network monitoring and outage resolution procedures, staffing and additional
equipment, cell on wheels (COW), redundant facilities, and a complete inventory and regionally
available spare parts. Id. at 8-9. It noted that the Application also provided detailed descriptions
of the Company s Emergency 911 capabilities that include automatic numbering information
(ANI) and automatic location information (ALI) service. Id. A Technical Operations team of 11
people is located within southeastern Idaho and is equipped with a complete complement of
spares for cell sites, microwave and other equipment and one of the Company s two network
operating centers (NOCs) is located in Pocatello, Idaho. Staff believes the Company meets the
ETC designation standard for Ability to Remain Functional in Emergencies. Id.
High-Cost Funding
Staff noted that it is aware of the high cost funding issues for rural areas. Staff
recognizes and is concerned about the growth of high costs funds, particularly as it relates to
Competitive ETCs (CETC). The escalating high cost fund is an ongoing concern that must be
addressed at the federal leveL In the meantime, Staff does not feel it should deny
recommendation for approval of an ETC application that reasonably meets all of the statutory
requirements for an ETC designation. Staff commented that denial of an ETC application also
denies the rural and tribal consumers the benefit ofITSAP, Lifeline and Linkup support as well
as other potential benefits that may be offered by the CETc. Id. at 9.
DECISION MEMORANDUM
Summary
Of the requirements for ETC designation, it is Staff s opinion that the public interest
analysis, the two-year network improvement plan, and the ability to remain functional in an
emergency are essential to the Idaho consumers in the rural wire centers. Consequently, Staff
judged these categories with a critical analysis to determine if the Applicant has provided
compelling evidence that it meets these requirements. Id.
Based upon the information provided in the Application, Staff saw no indication that
Edge would not provide comparable service to that currently provided by the ILECs. The
thoroughness of the Application and the attention to detail demonstrated in the two-year network
plan indicates a serious commitment to provide reliable, state-of-the-art telecommunications to
the rural wire center consumers. Staff believes the Company demonstrates a commitment to
Idaho as evident by the number of technicians located within the state as well as the NOC
located in Pocatello , Idaho. Edge s Idaho presence exceeds that of some of the ILECs. Id.
Staff believes the Company exhibits an understanding of the federal and state
customer service requirements for ETC designation. Staff further believes Edge meets all federal
and state requirements to be granted ETC designation in both the non-rural and rural wire
centers. Staff recommends that the Commission approve the Application as to the rural and non-
rural wire centers listed in the Application. Id. at 10.
COMMISSION DECISION
Does the Commission continue to find that Modified Procedure is appropriate for this
matter, or does the Commission desire to set a prehearing conference for this matter to establish
a discovery and hearing schedule? Does the Commission desire to do anything else with regards
to this matter?
M:EDG-O7-cg2
DECISION MEMORANDUM