Loading...
HomeMy WebLinkAbout20220907Gem State to Staff 19.pdfRates & Regulatory Affairs GSW-W-22-01 Gem State Water Company, LLC Application for an Order Authorizing an Increase in its Rates and Charges for Water Service Data Request Response Request No.: GSW-W-22-01 IPUC DR 19 19: Please provide an allocation schedule that shows how overheads such as vehicles, executive personnel, materials and supplies, are allocated among the different water systems, plant, and expense accounts. Response: Please see GSW-W-22-01 IPUC DR 19 Attachment 1, which shows a split of Operating Costs by system. The allocation was derived by directly charging costs to the specific system where possible. A majority of the costs were not designated to a specific system and therefore had to be allocated instead of directly assigned. These costs were then charged out based on connection count. Column D shows the total amount included within Gem State Water post allocation of costs out to Pelican Point and Gem State Infrastructure (GSI). In total Gem State Water incurred $715,514 of operating costs; of that amount, $110,064 was charged out to the other two entities. GSW-W-22-01 IPUC DR 19 Attachment 1 is very detailed with many tabs. The Company believes that it may be helpful to schedule a workshop with Staff to review the attachment and respond to any questions. RECEIVED 2022 SEP -7 PM 5:08 IDAHO PUBLIC UTILITIES COMMISSION