HomeMy WebLinkAbout20220907Gem State to Staff 1-18 DR 8 Attachment 1.pdfDEQ Public Drinking Water System
Monitoring Schedule Report
Print Date: August 24, 2022
ID1280096 - TROY HOFFMAN WATER CORP
Community water system serving 367 people and 147 connections.
Regulated by: COEUR D ALENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2022 and 12-31-2030
Schedules for Distribution System(s)
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly
ASBT IOC - ASBESTOS 1 per 3Y due between 1/1/2020 and 12/31/2022 n/a n/a NO
Schedules for Distribution Systems(s) Lead and Copper
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE
Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit:
http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications
Schedules for tag#: E0005232
Please Label Sampling Point/Location as: "WELL 1"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE
R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO
R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE
ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
"*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
"*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be
changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements. Contact your public water system regulating agency if you have any questions.
When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted.
Date Printed:Wednesday, August 24, 2022 Page 1 of 1
DEQ Public Drinking Water System
Monitoring Schedule Report
Print Date: August 24, 2022
ID1280176 - GEM STATE - SPIRIT LAKE EAST
Community water system serving 825 people and 330 connections.
Regulated by: COEUR D ALENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2022 and 12-31-2030
Schedules for Distribution System(s)
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly
2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2022 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 NO
2950 TTHM 1 per YR collected in 2022 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 NO
2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2023 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 *FUTURE
2950 TTHM 1 per YR collected in 2023 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 *FUTURE
2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2024 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 *FUTURE
2950 TTHM 1 per YR collected in 2024 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 *FUTURE
2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2025 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 *FUTURE
2950 TTHM 1 per YR collected in 2025 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 *FUTURE
2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2026 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 *FUTURE
2950 TTHM 1 per YR collected in 2026 taken 7/1 through 9/30
163 EAGLE DR (DBP2A)
7/1 9/30 *FUTURE
Schedules for Distribution Systems(s) Lead and Copper
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
PBCU LCR - LEAD COPPER 10 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO
PBCU LCR - LEAD COPPER 10 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE
Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit:
http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications
Date Printed:Wednesday, August 24, 2022 Page 1 of 2
Schedules for tag#: E0005365
Please Label Sampling Point/Location as: "WELL 1"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE
ZNO2 NITRITE 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a YES
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
URAN RADS - URANIUM 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
R226 RADS - RADIUM 226 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
R228 RADS - RADIUM 228 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE
ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE
"*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
"*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be
changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements. Contact your public water system regulating agency if you have any questions.
When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted.
Date Printed:Wednesday, August 24, 2022 Page 2 of 2
DEQ Public Drinking Water System
Monitoring Schedule Report
Print Date: August 24, 2022
ID1280259 - GEM STATE - LYNNWOOD ESTATES
Community water system serving 43 people and 21 connections.
Regulated by: HEALTH DISTRICT 1
The following schedules include monitoring periods between 1-1-2022 and 12-31-2030
Schedules for Distribution System(s)
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly
Schedules for Distribution Systems(s) Lead and Copper
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2024 taken 6/1 through 9/30 6/1 9/30 *FUTURE
Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit:
http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications
Schedules for tag#: E0005366
Please Label Sampling Point/Location as: "WELL #2"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE
R226 RADS - RADIUM 226 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
R228 RADS - RADIUM 228 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE
ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
"*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
"*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be
changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements. Contact your public water system regulating agency if you have any questions.
When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted.
Date Printed:Wednesday, August 24, 2022 Page 1 of 1
DEQ Public Drinking Water System
Monitoring Schedule Report
Print Date: August 24, 2022
ID1280220 - GEM STATE - HAPPY VALLEY WATER SYSTEM
Community water system serving 60 people and 25 connections.
Regulated by: COEUR D ALENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2022 and 12-31-2030
Schedules for Distribution System(s)
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly
Schedules for Distribution Systems(s) Lead and Copper
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE
Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit:
http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications
Date Printed:Wednesday, August 24, 2022 Page 1 of 3
Schedules for tag#: E0005370
Please Label Sampling Point/Location as: "WELL 1"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
ZNO3 NITRATE 1 per QT due between 01/01/2022 and 03/31/2022 n/a n/a YES
ZNO3 NITRATE 1 per QT due between 04/01/2022 and 06/30/2022 n/a n/a YES
ZNO3 NITRATE 1 per QT due between 07/01/2022 and 09/30/2022 n/a n/a NO
URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per QT due between 10/01/2022 and 12/31/2022 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 01/01/2023 and 03/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 04/01/2023 and 06/30/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 07/01/2023 and 09/30/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 10/01/2023 and 12/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 01/01/2024 and 03/31/2024 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 04/01/2024 and 06/30/2024 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 07/01/2024 and 09/30/2024 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 10/01/2024 and 12/31/2024 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 01/01/2025 and 03/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 04/01/2025 and 06/30/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 07/01/2025 and 09/30/2025 n/a n/a *FUTURE
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 10/01/2025 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 01/01/2026 and 03/31/2026 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 04/01/2026 and 06/30/2026 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 07/01/2026 and 09/30/2026 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 10/01/2026 and 12/31/2026 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 01/01/2027 and 03/31/2027 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 04/01/2027 and 06/30/2027 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 07/01/2027 and 09/30/2027 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 10/01/2027 and 12/31/2027 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 01/01/2028 and 03/31/2028 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 04/01/2028 and 06/30/2028 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 07/01/2028 and 09/30/2028 n/a n/a *FUTURE
R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 10/01/2028 and 12/31/2028 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 01/01/2029 and 03/31/2029 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 04/01/2029 and 06/30/2029 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 07/01/2029 and 09/30/2029 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 10/01/2029 and 12/31/2029 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 01/01/2030 and 03/31/2030 n/a n/a *FUTURE
ZNO3 NITRATE 1 per QT due between 04/01/2030 and 06/30/2030 n/a n/a *FUTURE
Date Printed:Wednesday, August 24, 2022 Page 2 of 3
"*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
"*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be
changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements. Contact your public water system regulating agency if you have any questions.
When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted.
Date Printed:Wednesday, August 24, 2022 Page 3 of 3
DEQ Public Drinking Water System
Monitoring Schedule Report
Print Date: August 24, 2022
ID1280268 - GEM STATE - DIAMOND BAR ESTATES
Community water system serving 143 people and 57 connections.
Regulated by: COEUR D ALENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2022 and 12-31-2030
Schedules for Distribution System(s)
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly
Schedules for Distribution Systems(s) Lead and Copper
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE
Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit:
http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications
Schedules for tag#: E0009134
Please Label Sampling Point/Location as: "WELL 1"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE
R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO
R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE
ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE
"*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
"*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be
changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements. Contact your public water system regulating agency if you have any questions.
When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted.
Date Printed:Wednesday, August 24, 2022 Page 1 of 1
DEQ Public Drinking Water System
Monitoring Schedule Report
Print Date: August 24, 2022
ID1280260 - GEM STATE - BITTERROOT WATER COMPANY
Community water system serving 398 people and 161 connections.
Regulated by: COEUR D ALENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2022 and 12-31-2030
Schedules for Distribution System(s)
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly
Schedules for Distribution Systems(s) Lead and Copper
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE
Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit:
http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications
Schedules for tag#: ID1280260WF
Please Label Sampling Point/Location as: "WELLS 1&2 WELLFIELD"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2014 and 12/31/2022 n/a n/a NO
R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2014 and 12/31/2022 n/a n/a NO
URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
"*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
"*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be
changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements. Contact your public water system regulating agency if you have any questions.
When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted.
Date Printed:Wednesday, August 24, 2022 Page 1 of 1
DEQ Public Drinking Water System
Monitoring Schedule Report
Print Date: August 24, 2022
ID1280010 - GEM STATE - BAR CIRCLE S RANCH
Community water system serving 633 people and 253 connections.
Regulated by: COEUR D ALENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2022 and 12-31-2030
Schedules for Distribution System(s)
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly
Schedules for Distribution Systems(s) Lead and Copper
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO
PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE
Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit:
http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications
Date Printed:Wednesday, August 24, 2022 Page 1 of 3
Schedules for tag#: E0009245
Please Label Sampling Point/Location as: "WELL 2"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE
R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO
R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE
ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE
Schedules for tag#: ID1280010WF
Please Label Sampling Point/Location as: "WELLS 1&3 WELLFIELD"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO
ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE
ALFA RADS - GROSS ALPHA 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO
URAN RADS - URANIUM 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO
R226 RADS - RADIUM 226 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
R228 RADS - RADIUM 228 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO
SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE
ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE
ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO
VOCS VOCS - GROUP 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE
ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE
Date Printed:Wednesday, August 24, 2022 Page 2 of 3
"*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
"*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be
changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements. Contact your public water system regulating agency if you have any questions.
When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted.
Date Printed:Wednesday, August 24, 2022 Page 3 of 3