Loading...
HomeMy WebLinkAbout20220907Gem State to Staff 1-18 DR 8 Attachment 1.pdfDEQ Public Drinking Water System Monitoring Schedule Report Print Date: August 24, 2022 ID1280096 - TROY HOFFMAN WATER CORP Community water system serving 367 people and 147 connections. Regulated by: COEUR D ALENE REGIONAL OFFICE The following schedules include monitoring periods between 1-1-2022 and 12-31-2030 Schedules for Distribution System(s) Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly ASBT IOC - ASBESTOS 1 per 3Y due between 1/1/2020 and 12/31/2022 n/a n/a NO Schedules for Distribution Systems(s) Lead and Copper Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit: http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications Schedules for tag#: E0005232 Please Label Sampling Point/Location as: "WELL 1" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE "*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin date will not satisfy the requirement for the monitoring period. "*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken and the schedule has been satisfied. IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring requirements. Contact your public water system regulating agency if you have any questions. When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted. Date Printed:Wednesday, August 24, 2022 Page 1 of 1 DEQ Public Drinking Water System Monitoring Schedule Report Print Date: August 24, 2022 ID1280176 - GEM STATE - SPIRIT LAKE EAST Community water system serving 825 people and 330 connections. Regulated by: COEUR D ALENE REGIONAL OFFICE The following schedules include monitoring periods between 1-1-2022 and 12-31-2030 Schedules for Distribution System(s) Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly 2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2022 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 NO 2950 TTHM 1 per YR collected in 2022 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 NO 2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2023 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 *FUTURE 2950 TTHM 1 per YR collected in 2023 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 *FUTURE 2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2024 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 *FUTURE 2950 TTHM 1 per YR collected in 2024 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 *FUTURE 2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2025 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 *FUTURE 2950 TTHM 1 per YR collected in 2025 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 *FUTURE 2456 TOTAL HALOACETIC ACID (HAA5)1 per YR collected in 2026 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 *FUTURE 2950 TTHM 1 per YR collected in 2026 taken 7/1 through 9/30 163 EAGLE DR (DBP2A) 7/1 9/30 *FUTURE Schedules for Distribution Systems(s) Lead and Copper Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied PBCU LCR - LEAD COPPER 10 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO PBCU LCR - LEAD COPPER 10 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit: http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications Date Printed:Wednesday, August 24, 2022 Page 1 of 2 Schedules for tag#: E0005365 Please Label Sampling Point/Location as: "WELL 1" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE ZNO2 NITRITE 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a YES ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO URAN RADS - URANIUM 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO R226 RADS - RADIUM 226 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO R228 RADS - RADIUM 228 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE "*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin date will not satisfy the requirement for the monitoring period. "*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken and the schedule has been satisfied. IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring requirements. Contact your public water system regulating agency if you have any questions. When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted. Date Printed:Wednesday, August 24, 2022 Page 2 of 2 DEQ Public Drinking Water System Monitoring Schedule Report Print Date: August 24, 2022 ID1280259 - GEM STATE - LYNNWOOD ESTATES Community water system serving 43 people and 21 connections. Regulated by: HEALTH DISTRICT 1 The following schedules include monitoring periods between 1-1-2022 and 12-31-2030 Schedules for Distribution System(s) Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly Schedules for Distribution Systems(s) Lead and Copper Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied PBCU LCR - LEAD COPPER 5 per 3Y collected in 2024 taken 6/1 through 9/30 6/1 9/30 *FUTURE Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit: http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications Schedules for tag#: E0005366 Please Label Sampling Point/Location as: "WELL #2" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE R226 RADS - RADIUM 226 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO R228 RADS - RADIUM 228 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE "*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin date will not satisfy the requirement for the monitoring period. "*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken and the schedule has been satisfied. IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring requirements. Contact your public water system regulating agency if you have any questions. When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted. Date Printed:Wednesday, August 24, 2022 Page 1 of 1 DEQ Public Drinking Water System Monitoring Schedule Report Print Date: August 24, 2022 ID1280220 - GEM STATE - HAPPY VALLEY WATER SYSTEM Community water system serving 60 people and 25 connections. Regulated by: COEUR D ALENE REGIONAL OFFICE The following schedules include monitoring periods between 1-1-2022 and 12-31-2030 Schedules for Distribution System(s) Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly Schedules for Distribution Systems(s) Lead and Copper Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit: http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications Date Printed:Wednesday, August 24, 2022 Page 1 of 3 Schedules for tag#: E0005370 Please Label Sampling Point/Location as: "WELL 1" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied ZNO3 NITRATE 1 per QT due between 01/01/2022 and 03/31/2022 n/a n/a YES ZNO3 NITRATE 1 per QT due between 04/01/2022 and 06/30/2022 n/a n/a YES ZNO3 NITRATE 1 per QT due between 07/01/2022 and 09/30/2022 n/a n/a NO URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per QT due between 10/01/2022 and 12/31/2022 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 01/01/2023 and 03/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 04/01/2023 and 06/30/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 07/01/2023 and 09/30/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 10/01/2023 and 12/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 01/01/2024 and 03/31/2024 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 04/01/2024 and 06/30/2024 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 07/01/2024 and 09/30/2024 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 10/01/2024 and 12/31/2024 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 01/01/2025 and 03/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 04/01/2025 and 06/30/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 07/01/2025 and 09/30/2025 n/a n/a *FUTURE VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 10/01/2025 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 01/01/2026 and 03/31/2026 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 04/01/2026 and 06/30/2026 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 07/01/2026 and 09/30/2026 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 10/01/2026 and 12/31/2026 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 01/01/2027 and 03/31/2027 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 04/01/2027 and 06/30/2027 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 07/01/2027 and 09/30/2027 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 10/01/2027 and 12/31/2027 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 01/01/2028 and 03/31/2028 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 04/01/2028 and 06/30/2028 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 07/01/2028 and 09/30/2028 n/a n/a *FUTURE R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 10/01/2028 and 12/31/2028 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 01/01/2029 and 03/31/2029 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 04/01/2029 and 06/30/2029 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 07/01/2029 and 09/30/2029 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 10/01/2029 and 12/31/2029 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 01/01/2030 and 03/31/2030 n/a n/a *FUTURE ZNO3 NITRATE 1 per QT due between 04/01/2030 and 06/30/2030 n/a n/a *FUTURE Date Printed:Wednesday, August 24, 2022 Page 2 of 3 "*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin date will not satisfy the requirement for the monitoring period. "*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken and the schedule has been satisfied. IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring requirements. Contact your public water system regulating agency if you have any questions. When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted. Date Printed:Wednesday, August 24, 2022 Page 3 of 3 DEQ Public Drinking Water System Monitoring Schedule Report Print Date: August 24, 2022 ID1280268 - GEM STATE - DIAMOND BAR ESTATES Community water system serving 143 people and 57 connections. Regulated by: COEUR D ALENE REGIONAL OFFICE The following schedules include monitoring periods between 1-1-2022 and 12-31-2030 Schedules for Distribution System(s) Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly Schedules for Distribution Systems(s) Lead and Copper Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit: http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications Schedules for tag#: E0009134 Please Label Sampling Point/Location as: "WELL 1" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE "*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin date will not satisfy the requirement for the monitoring period. "*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken and the schedule has been satisfied. IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring requirements. Contact your public water system regulating agency if you have any questions. When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted. Date Printed:Wednesday, August 24, 2022 Page 1 of 1 DEQ Public Drinking Water System Monitoring Schedule Report Print Date: August 24, 2022 ID1280260 - GEM STATE - BITTERROOT WATER COMPANY Community water system serving 398 people and 161 connections. Regulated by: COEUR D ALENE REGIONAL OFFICE The following schedules include monitoring periods between 1-1-2022 and 12-31-2030 Schedules for Distribution System(s) Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly Schedules for Distribution Systems(s) Lead and Copper Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit: http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications Schedules for tag#: ID1280260WF Please Label Sampling Point/Location as: "WELLS 1&2 WELLFIELD" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2014 and 12/31/2022 n/a n/a NO R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2014 and 12/31/2022 n/a n/a NO URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE "*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin date will not satisfy the requirement for the monitoring period. "*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken and the schedule has been satisfied. IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring requirements. Contact your public water system regulating agency if you have any questions. When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted. Date Printed:Wednesday, August 24, 2022 Page 1 of 1 DEQ Public Drinking Water System Monitoring Schedule Report Print Date: August 24, 2022 ID1280010 - GEM STATE - BAR CIRCLE S RANCH Community water system serving 633 people and 253 connections. Regulated by: COEUR D ALENE REGIONAL OFFICE The following schedules include monitoring periods between 1-1-2022 and 12-31-2030 Schedules for Distribution System(s) Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied 3100 COLIFORM (TCR) 1 per MN 1/1 12/31 Monthly Schedules for Distribution Systems(s) Lead and Copper Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied PBCU LCR - LEAD COPPER 5 per 3Y collected in 2022 taken 6/1 through 9/30 6/1 9/30 NO PBCU LCR - LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 through 9/30 6/1 9/30 *FUTURE Note: Consumer notice of lead tap results, regardless of lead level, is required within 30 days after receiving results. For templates and more information, please visit: http://www.deq.idaho.gov/water-quality/drinking-water/pws-monitoring-reporting/public-notifications Date Printed:Wednesday, August 24, 2022 Page 1 of 3 Schedules for tag#: E0009245 Please Label Sampling Point/Location as: "WELL 2" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied URAN RADS - URANIUM 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE R226 RADS - RADIUM 226 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO R228 RADS - RADIUM 228 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO VOCS VOCS - GROUP 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO URAN RADS - URANIUM 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE ALFA RADS - GROSS ALPHA 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE Schedules for tag#: ID1280010WF Please Label Sampling Point/Location as: "WELLS 1&3 WELLFIELD" Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied VOCS VOCS - GROUP 1 per 6Y due between 01/01/2017 and 12/31/2022 n/a n/a NO ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2034 GLYPHOSATE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2037 SIMAZINE 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2040 PICLORAM 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO 2105 2,4-D 1 per 3Y due between 01/01/2020 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2022 and 12/31/2022 n/a n/a NO ZNO3 NITRATE 1 per YR due between 01/01/2023 and 12/31/2023 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2024 and 12/31/2024 n/a n/a *FUTURE ALFA RADS - GROSS ALPHA 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO URAN RADS - URANIUM 1 per 9Y due between 01/01/2017 and 12/31/2025 n/a n/a NO R226 RADS - RADIUM 226 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO R228 RADS - RADIUM 228 1 per 6Y due between 01/01/2020 and 12/31/2025 n/a n/a NO SODI IOC - SODIUM 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2025 and 12/31/2025 n/a n/a *FUTURE ZNO3 NITRATE 1 per YR due between 01/01/2026 and 12/31/2026 n/a n/a *FUTURE ZFLU IOC - FLUORIDE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZIOC IOCS - PHASE 2 AND 5 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO ZNO2 NITRITE 1 per 9Y due between 01/01/2020 and 12/31/2028 n/a n/a NO VOCS VOCS - GROUP 1 per 6Y due between 01/01/2023 and 12/31/2028 n/a n/a *FUTURE ZARS ARSENIC (1005) 1 per 3Y due between 01/01/2026 and 12/31/2028 n/a n/a *FUTURE Date Printed:Wednesday, August 24, 2022 Page 2 of 3 "*FUTURE" in the "Satisfied" column indicates the sampling requirement begins sometime in the future. Sampling before the monitoring period begin date will not satisfy the requirement for the monitoring period. "*See CO" in the "Satisfied" column indicates the operator needs to contact his or her compliance officer (CO) to verify that samples have been taken and the schedule has been satisfied. IMPORTANT NOTICE: This monitoring schedule is provided to you as a courtesy and is current as of August 24, 2022 Surface water systems and systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report. This monitoring schedule may be changed or modified as needed. This monitoring schedule does not show past unfulfilled schedules for which violations may exist. Please revisit the monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring requirements. Contact your public water system regulating agency if you have any questions. When more than one year is selected for the search criteria, schedules due in 2022 will be highlighted. Date Printed:Wednesday, August 24, 2022 Page 3 of 3