HomeMy WebLinkAbout20070312_1861.pdfDECISION MEMORANDUM
TO:CO MMISSI 0 NER KJELLAND ER
COMMISSIONER SMITH
COMMISSIONER REDFORD
COMMISSION SECRETARY
COMMISSION STAFF
LEGAL
FROM:CECELIA GASSNER
DATE:MARCH 9, 2007
SUBJECT:IDAHO POWER COMPANY'S 2006 INTEGRATED RESOURCE PLAN,
CASE NO. IPC-06-
On September 24, 2006, Idaho Power Company ("Idaho Power" or "Company ) filed
its 2006 Integrated Resource Plan (IRP). On October 18, 2006 , the Company filed a revised plan
that corrected certain typographic errors and revised certain exhibits. The Company s filing is
pursuant to a biennial requirement established in Commission Order No. 22299, Case No. U-
1500-165. The IRP describes the Company s growing customer base, load growth, supply-side
resources, demand-side management and risk analyses. Additionally, the 160-page IRP
document and related appendices contain information regarding available resource options
planning period forecasts, potential resource portfolios, a ten-year resource plan, and a near-term
action plan.
On November 21 , 2006, the Commission issued a Notice of Application and
Modified Procedure and solicited comments on the IRP. Order No. 30185. The Staff, along
with 20 members of the public and several interested groups, timely filed comments. The
Company filed reply comments on February 9, 2007.
THE INTEGRATED RESOURCE PLAN
According to the Plan Summary, the Company anticipates that its customer base will
increase from approximately 455 000 to over 680 000 by the end of the planning period of2025
an increase of 11 000 to 12 000 new customers each year. The Company states that it used a
conservative resource plan based upon a worse-than-median level of water. It uses 70th
percentile water conditions and 70th percentile average load for energy planning. In addition, for
DECISION MEMORANDUM
peak-hour capability planning, it uses 90th percentile water conditions and 95th percentile peak-
hour load.
The IRP states that it includes 1 300 MW (nameplate) of supply-side resource
additions and demand side management (DSM) programs designed to reduce peak load by 187
MW and average load by 88aMW. The Company s average load is expected to increase by 40
aMW, and summertime peak-hour loads are expected to increase by 80 MW per year through
2025.
The IRP was created with the input of the Integrated Resource Plan Advisory
Council (IRP AC), a group comprised of stakeholders including environmental groups, major
industrial customers, major irrigation customers, state legislators, public utility commission
representatives, and the Governor s office, among others. Although the IRPAC members' input
was considered, Idaho Power made the final decision on content of the IRP.
COMMENTS
Comments were filed by 20 individuals, Citizens Protecting Resources, Industrial
Customers of Idaho Power, Idaho Irrigation Pumpers Association, Exergy Development Group
of Idaho LLC, NW Energy Coalition, and Staff. Idaho Power filed reply comments.
Public Comments
Twenty individuals submitted their comments.majority of the comments
submitted by members of the public concerned the sources of Idaho Power s supply. Ten
commenters stated that they are against the inclusion of nuclear power and coal plants in the
Company s IRP, and most added their desire that the Company focus on alternative sources such
as wind, solar, biomass and geothermal energy sources. One specifically voiced encouragement
to the Company to more strongly consider wind-generated energy. Four additional commenters
also voiced an opposition to Idaho Power s proposed use of nuclear power and concern for the
risks involved with nuclear power plants to human and environmental health, and noted that the
undetermined nature of the funding for the !NL nuclear plant made it imprudent to include in the
IRP. One other commenter expressed his support of Idaho Power s inclusion of nuclear power in
the IRP.
Two commenters suggested more public participation in different parts of the
process. One of these commenters stated that more demand-side conservation is necessary and
asked the Commission to not accept the IRP and make the Company revisit the IRP to include
DECISION MEMORANDUM
increased conservation and efficiency efforts. The other commenter suggested that the
Commission conduct a survey of statistically significant sample of Idaho residents regarding
their opinions on a preferred mix of energy supply, along with education by these residents of the
costs of such sources.
With regards to carbon dioxide sequestration efforts, one commenter opposed them
while another was in favor of requiring sequestration to offset any coal-fired generation added to
the Company s resource plan.
Citizens Protecting Resources
Citizens Protecting Resources (CPR), a group organized in response to the proposed
siting of a large merchant coal-fired power plant near Jerome in 2006, expressed its opinion that
the IRP did not include a strong DSM plan. It urged the Commission "to mandate, or at least
strongly encourage, efficiency and DSM." CPR also noted its opinion that the IRP contained a
low emphasis on non-hydro renewable energy source. It supported the purchase by the
Company of green tags and believes that such costs should be recoverable.
Lastly, CPR expressed its disappointment that the Company chose Portfolio F2 rather
than Fl. It believes that an IRP that relies on more DSM and non-hydro renewable resources
rather than thermal resources is a superior one than the filed IRP.
Staff Comments
The Staff noted that the 2006 IRP is a continuing improvement over prior IRPs. It
believes that the Company s conservative approach to water, load and peak capacity planning is
reasonable. It noted that some risk remains for strong reliance on regional markets to meet
summer peaking needs, but that the risk is mitigated by the conservative planning criteria. Staff
Comments at 3.
Staff also supported the Company s extension of its planning horizon from 10 to 20
years. This approach allows the Company to incorporate more capital intensive resources that
require a long lead time and facilitates the analysis of transmission planning, among other
pertinent activities. Id.
1. Load Growth Forecasts. Staff commented that Idaho Power continues to plan for
a high level of growth in load over the planning horizon. The expected growth rate of 1.9% is
lower than the 2002 and 2004 IRPs, but still signifies a robust upward trend. Of the four main
customer classes, the residential sector appears to be the catalyst for growing load. The growth
DECISION MEMORANDUM
rate for residential customers is predicted to be about 2% annually, resulting in a net increase of
nearly 190 000 customers by 2025 for that class. This contributes to both energy and capacity
needs, with emphasis on the latter due to the growing penetration of air conditioning within the
service territory. Summer peak load growth is projected at 80 MW a year over the planning
horizon, with residential and irrigation accounting for approximately 60% of summer peak
demand. Id. at 4.
2. Fuel Price Forecasts. Staff commented that perhaps the most important
assumption and input in the modeling run is the natural gas price forecast. In the last five years
Staff noted many electric utilities have relied on gas-fired combustion turbines, with an
increased total gas consumption for electric generation of 45% over the past decade. Id. at 4-
At the same time, the nation has experienced substantial volatility in gas prices.Staff
commented that the IRP appears to present and utilize an annual average gas price. Staff
believes that because the majority of gas is purchased to fire turbines in the summer peaking
months, it would seem more appropriate to use a summer pricing schedule that reflects the
timing of the Company s fuel purchases. To the extent the summer gas prices for use in summer
peak facilities are lower than annual average prices (that include the higher winter prices), then
the risk of an artificially low annual average forecast is somewhat mitigated. Staff commented
that to the extent the Company used weighted summer prices in its IRP, it should describe the
methodology used in the calculation. Id. at 5.
Likewise, Staff noted that the Company s forecast of coal prices continues to exhibit
the same upward trend in forecasts from the previous IRPs. IRP, Technical App. D at 50. Coal
prices, including transportation costs, become a major factor in assessing potential portfolios, as
the Company appears committed to adding coal-fired resources to the mix. Id. at 6.
Idaho Power Replv Comments The Company noted that the Aurora model utilized
in the analysis of each portfolio does include seasonalization factors, which may not be apparent
from reading the figures and data. Idaho Power Reply Comments at 5.
3. Transmission.Staff noted that at the behest of the Commission, Idaho Power
included transmission alternatives in its resource planning. Staff Comments at 6. It stated that it
believes that given the Company s needs, availability of economic resources and the maturity of
the Pacific Northwest markets, the Company s emphasis on transmission upgrade is properly
focused. Staff commented that the selections presented regarding transmission appear to be
DECISION MEMORANDUM
reasonable, including 285 MW of transmission upgrades that provide access to the Mid-C market
in the Pacific Northwest. Id. Sites for transmission east of Boise have not been specifically
identified, but the Company included generic transmission upgrade costs. The Staff considered
this to be reasonable as a proxy, noting that the Company would likely provide more specific
cost estimates when a more fully developed plan to acquire resources east of Boise is presented.
Id. at 7.
4. Supply Side Resource Options Staff noted that the selected portfolio is a
modified version of the preferred portfolio from the 2004 IRP. Id. According to Staff, the three
most significant changes are the timing of the additional coal based resources, the inclusion of
transmission upgrades, and the modification of geothermal resources. Id. Also, the inclusion of
250 MW of nuclear power in 2023 is worth noting. The selected portfolio consists of the
following:
250 MW Wind
150 MW Geothermal
150 MW Combined Heat & Power (CHP)
250 MW Coal
250 MW IGCC Coal
285 MW Transmission
250 MW Nuclear
187 MW DSM (Peak reduction)
Staff noted that Idaho Power has committed to adding more wind generation to its portfolio.
major factor toward the reduction in new wind acquisitions is the amount of PURP A wind
projects the Company has added since the preparation of the 2004 IRP, when it had only 2.
MW of wind-related contracts. Excluding any unforeseen additional PURP A contracts, the
amount of wind energy in its resource mix will move to 450 MW within six years. Id. Staff also
noted that the 2006 preferred portfolio increases the amount of geothermal-powered generation
by 50 MW over the 2004 plan to a total of 150 MW. Id.
In addition, Staff noted that the single 500 MW coal-fired generation resource from
the 2004 preferred portfolio has been altered in the 2006 IRP to two 250 MW acquisitions
dispersed over the planning horizon. Id. at 8. Staff commented that A vista and Idaho Power are
jointly assessing the current state of coal-based generation technologies. Id. Preliminary results
indicate that integrated gasification combined cycle (IGCC) technology may be viable, but the
high initial capital expenditures and unproven technology involved may be barriers. Id.
DECISION MEMORANDUM
Staff added that the other 250 MW of coal-fired generation is anticipated to be online
in 2013. The Company has provided a number of potential scenarios for adding regional
pulverized coal to its resource portfolio with the expectation that any generating unit will be
located outside of the State. By breaking up its acquisition of coal based resources into smaller
units than that proposed in the 2004 IRP, the Company notes that this reduces its exposure to risk
of equipment failure and coincides better with expected load growth. IRP at 97. Staff observed
that this reduces the immediate rate impact on the Company s customers as well. Id.
Lastly, Staff noted that the remaining supply-side resources in Idaho Power
preferred portfolio include 150 MW of Combined Heat and Power (CHP) and a 250 MW power
purchase agreement (PP A) with INL for nuclear power. Id. The inclusion of the nuclear PP A is
speculative at this time, but is not considered in the plan to be enacted until 2023 , and it is
assumed that this will be addressed in future IRPs. Id. at 9.
5. DSM Measures. Staff commented that the 2006 IRP sets more aggressive targets
for DSM savings for the planning period than did the 2004 IRP. Staff supports prudently
managed, cost-effective DSM programs and hopes that the Company can reach at least the
targets set out in the IRP. Id.
Staff noted that the 2006 IRP proposes two new DSM programs and refinement and
expansion of an existing program that will potentially result in a nearly 88 aMW savings and a
reduction in peak load of 187 MW in 2025 , both in addition to its existing programs. Id. Most
of the existing programs are projected to expand for at least the first few years of the planning
period, according to the 2004 IRP. !d.
The Commission approved modifications to the Irrigation Peak Rewards Program
that are intended to expand the program beyond the level of the 2006 program. See Order No.
30194. Staff noted, however, that there is no acknowledgement of the program or assumptions
of continued associated savings and reductions to be found in the 2006 IRP. If included, Staff
believes the Company needs to be more explicit in how it is factored into the analysis; if not
included, the Company should explain why. Id. at 9-10.
Staff recognized that there are several factors that may influence the level of DSM
implementation. Id. One particular example, Staff noted, is the implementation of a fixed cost
adjustment mechanism designed to keep the Company financially neutral to deviations in sales
such as lost sales due to DSM efforts. See Case No. IPC-04-15. The goals of the fixed cost
DECISION MEMORANDUM
adjustment are to remove the inherent disincentive to investing in demand-side measures and
facilitate the Company s efforts to expand its DSM offerings. Staff is interested in whether
approval of the fixed cost adjustment mechanism would affect the analysis conducted for the
IRP, and if so, how. !d.
Staff noted that a second example is the status of the Company s advanced meter
reading (AMR) deployment. Id. In Order No. 30102, the Commission granted Idaho Power a
one-year period to investigate the technical issues that plagued the AMR deployment in the
Emmett area. Through meetings with the Staff, the Company has reported that many of the
technical issues have been addressed, though new issues have appeared. Failure to resolve these
issues may have a deleterious effect on demand response programs that utilize AMR technology.
Staff further noted that the Company is scheduled to submit an updated status report by May 1
2007. Id.
Staff commented that DSM programs continue to be among the most cost-effective
resources available to Idaho Power. Id. However, the Company projects its DSM energy
savings for 2007 and 2008 at between 65% and 75% of its proportional share of the Northwest
Power and Conservation Council's (NWPCC) estimate of total conservation potential. Id.
While the 2006 IRP demonstrates a higher commitment to DSM efforts than in the past, Staff
believes that the Company does not yet propose to pursue all cost-effective DSM opportunities
and incorporate associated energy and peak demand savings into its determination of new
supply-side resource needs. Staff conjectured that perhaps the Company s fixed cost adjustment
proposal in Case No. IPC-04-15 and its DSM incentive proposal in Case No. IPC-06-
will mitigate the Company s position that DSM programs will be selected to minimize negative
impact on shareowners. Id. at 11.
Idaho Power Replv Comments Idaho Power noted that the changes to the Irrigation
Peak Rewards Program that were approved by the Commission on November 30, 2006 (Order
No. 30194) will significantly change the estimated savings from the program. Idaho Power
Reply Comments at 5. It does expect an increased savings, by approximately 3.9 MW per day,
in 2007 , but depending on how the peak time is distributed and how the time period is used, the
estimated savings will still be close to 30 MW. Id. at 5-
6. Risk Analysis Staff noted that Idaho Power selected 4 of the 12 potential
portfolios for further risk analysis in determining the preferred portfolio , with risk measures
DECISION MEMORANDUM
falling into either quantitative or qualitative categories. Staff Comments at 11. The quantitative
analysis closely follows that of the 2004 IRP with two exceptions, the exclusion of risk analysis
associated with the expiration of production tax credits for wind and the inclusion of a sensitivity
analysis to variations in the streamflows of the Snake and Columbia River systems.
Advancement in the modeling software facilitated simulating various streamflow sequences for
the hydrologic variability analysis, which each portfolio analyzed under varying assumptions of
load requirements, carbon taxes, etc. The resulting analysis was not used in the final risk
adjustment due to the magnitude of the impact of varying hydrologic conditions. Staff found this
to be reasonable and noted that the difference in variability between the highest and lowest cost
portfolios are relatively small ($404 million versus $434 million, or less than 7% difference in
variability). Id.
Staff noted that the Company expanded its qualitative risk section in the 2006 IRP
and that its methodology resulted in the selection of the preferred portfolio, an extension of the
2004 preferred portfolio that highlights a diverse mix of new resource acquisitions. Staff noted
that the preferred portfolio had the second highest cost of the finalists in terms of average total
cost, yet the lowest in terms of resource cost (capital and operating costs, with market sales and
purchases excluded). The preferred portfolio was the second lowest risk-adjusted total cost
portfolio among finalists due to its relatively higher risk ranking. Id. at 12.
7. Near-term Action Plan. Staff noted that since 2001 Idaho Power has been in a
period of acquiring supply-side resources after nearly two decades of relatively few additions to
its generation resource mix. Id. The 2004 and 2006 IRPs have presented a need to meet future
deficiencies in energy as well as peak loads. Given the long lead-time associated with thermal
baseload generation facilities and the projected persistent deficiencies in energy beginning in
2012 , Staff believes it is imperative that the Company addresses these concerns. Id.
Staff noted that the Borah-West transmission upgrade is scheduled for completion
prior to the Company s next IRP filing in 2008. By that time it is anticipated that the final
commitments for the McNary-Boise transmission upgrade will have been made. This addition is
expected to be complete around 2012. Besides the Borah-West project, the Company is in the
final stages of the wind RFP for 100 MW scheduled to be online by the end of 2007 , as well as
finalizing the geothermal RFP for 50 MW, scheduled for an online date in 2009. Finally, the
approved 170 MW expansion of the Danskin facility is anticipated to be online in 2008. These
DECISION MEMORANDUM
additions, along with changing conditions faced by Idaho Power regarding loads, fuel prices, and
market conditions will invariably affect the Company s 2008 IRP. Id. at 13.
Staff Recommendation
The Staff recommended that the Commission accept and acknowledge the
Company s 2006 IRP for filing.
Industrial Customers of Idaho Power Comments
The Industrial Customers of Idaho Power (ICIP) expressed concern about the
Company s inclusion of the Evander Andrews natural gas-fired combustion turbine in the IRP.
ICIP Comments at 2. It noted that the Company relied on the 2004 IRP in explaining the need
for the Evander Andrews plant, approval for which it filed close to the same time as the 2006
IRP, but that the 2006 IRP contained "drastically different assumptions regarding, among other
things , natural gas prices and (DSM) program levels.Id. The ICIP voiced a concern that the
2006 IRP only assumed that the Evander Andrews plant would be built without further analysis
as to whether it was still needed. Id. The ICIP urged the Commission "to require the Company,
in future IRPs, to evaluate any resources under consideration in order to determine if they
continue to be preferred options.Id. at 3.
ICIP also stated that the Company had committed, in the application for the Evander
Andrews turbine noted above, to investigate the potential of using emergency backup generators
throughout its service area as a way to meet peak demand and that the Company had not yet done
so. Id. As the Company is currently in the middle of such an investigation and believes it will
have its proposal for the use of such generators by June 1 , 2007, ICIP believes that the
Commission should direct the Company to include its findings in its 2006 IRP. Id.
In addition, ICIP commented that it does not believe the Company used its best load
forecast. Id. at 4. It noted that the IRP states that the Company did not incorporate any specific
assumptions regarding the Conservation Reserve Enhancement Program (CREP), in which
substantial farmland is set aside and the irrigation pumps thereon are turned off. Id. at 4-
ICIP also noted its concern that the IRP focuses on transmission upgrades in the
northwest and does not fully concern possible transmission access to markets east of its service
territory. Id. at 5. It states that environmental concerns in the northwest may constrain
transmission and that it expects that coal resources in the Power River Basin will be a likely low-
cost generation resource for the region. Id. at 6.
DECISION MEMORANDUM
Lastly, ICIP urged the Commission to direct the Company to clarify how it accounts
for rate design tools in forecasting the system load, or to direct it to supplement the 2006 IRP
with the data. Id. at 7. The ICIP urged the Commission to not accept the 2006 IRP for filing and
to direct the Company to reconsider and supplement the IRP in accordance with the ICIP
comments. Id. at 1.
Idaho Power Reply Comments Idaho Power stated in reply that, taking into account
the substantial modeling and analysis that must be done to create an IRP, certain parameters and
assumptions must be locked down at a certain point. Idaho Power Reply Comments at 2.
refuted ICIP's assertion that Idaho Power does not revisit the ongoing prudency of its decisions
and stressed that it is mindful of various factors that affect its system and IRP. Id. It continues
to believe that the Evander Andrews facility was an appropriate choice. Id.
The Company noted that it makes every attempt to have the most current load
forecast possible. Id. at 2-3. The forecast used for this IRP was completed on October 26 2005
and using a later forecast to incorporate the May 2006 Idaho CREP would have meant redoing
months of modeling and analysis. Id. at 3. The Company further stated that it is continuing its
investigation into a "virtual peaking plant" and will have its proposal to the Commission by June
2007. Id.
Idaho Irrigation Pumpers Association Comments
The Idaho Irrigation Pumpers Association (lIP A) commended the Company for
producing a realistic IRP and for its proposing a diverse resource base. lIP A Comments at 1.
lIP A noted its support of the Company s conclusion that it must build load capacity to meet the
state s growth. Id. at 2. It added that although the Company s general load is increasing,
irrigation load is not increasing. Id. It urged the Company to continue its DSM efforts for
irrigators along with other customer classes. Id. Lastly, it voiced its support of the Company
proposal to reduce its reliance on regional market purchases. Id. at 3.
Exergy Development Group Comments
Exergy Development Group of Idaho LLC ("Exergy ) urged the Commission to not
accept the 2006 IRP for filing. Exergy Comments at 1. Exergy believes that the IRP focuses too
strongly on transmission upgrades to the Pacific Northwest, disregarding opportunities that
would benefit the Company and its customers. Id. at 2. It notes that as the Pacific Northwest
relies on hydropower, when the Pacific Northwest generation is abundant, it is also usually
DECISION MEMORANDUM
abundant on Idaho Power s system. Id. It also noted that fish and wildlife protections may
constrain the hydropower-based systems and reducing the Pacific Northwest surplus of energy.
Id. Exergy challenged the IRP's assertion that all off-market purchases will be from the Pacific
Northwest as being too simplistic and ignoring resource development to the east and south. Id.
4. It commented that coal plants from Montana, Wyoming and Utah may be future resources
as well as renewable energy projects in the Company s service territory. Id. at 4.
Idaho Power Reply Comments Idaho Power stated that ICIP's and Exergy
conclusions that it focused on transmission to the Pacific Northwest to the exclusion of the south
and east are incorrect. Id. at 3-4. It noted that the preferred portfolio does include transmission
upgrades to the east, including certain facilities that have been proposed but not finalized. If
these facilities are not developed, the Company stated that it is unlikely it would proceed with
the associated transmission upgrades. Id. at 4.
NW Energy Coalition Comments
The NW Energy Coalition ("Coalition ) lauded the Company s increased DSM
programs. Coalition Comments at 1. It also voiced a concern about the amount of thermal
resources proposed. Id. at 2. It noted that it is not convinced that the proposed additional 500
MW of coal-generated energy is necessary or prudent, especially in light of "the modest amount
of wind acquisition proposed. ...Id. It noted that the Northwest Power and Conservation
Council's Fifth Power Plan projected that the entire region may need only a single coal plant in
the future. Id. With the Oregon Public Utility Commission expressing doubt about the need for
a new plant, and Washington and California passing laws disfavoring coal for renewable
resources, the Coalition believes that the Company s proposed increase in coal-generated energy
is misplaced. Id. at 3.
In addition, the Coalition believes that the anticipated risk with wind variability is
overstated and that a more comprehensive evaluation of wind-generated energy would reduce
this risk. Id. at 4. It further expressed its disappointment in the amount of non-wind renewable
energy sources included in the plan. Id. at 4-5. It believes that this can be improved to create a
more even ratio of non-renewable to renewable resources. Id. at 5.
The Coalition expressed its support of the increase in peak DSM and believes there is
still room for more improvement. Id. at 5-6. It encouraged the Commission to continue to urge
the Company to incorporate the additional DSM programs set forth in the 2006 IRP. Id. at 6. It
DECISION MEMORANDUM
suggested that Company could be directed to reqUIre or incentivize its new customers to
participate in the DSM programs. Id.
The Coalition stated its concern that the IRP does not include improvements to
southern Idaho transmission. Id. It noted that with additional wind energy coming online and
possible plans to expand the Bridger plant may require additional transmission capability (even
when the upgrades to the Borah-West transmission system is taken into account). Id.
disagreed with the Company s assertion that increasing transmission capability in southern Idaho
may place an undue reliance on the Wyoming energy market. Id. at 7.
COMMISSION DECISION
Does the Commission desire to accept and acknowledge the Company s 2006 IRP
for filing?
Cecelia A. G sner
M:IPC-O6-cg2
DECISION MEMORANDUM