HomeMy WebLinkAboutLarry Fairfax DirectTestimony.pdfFROM
To:
Attention:
PHONE NO. Jun. 18 2002 11: 44~M Pi
June 17, 2002
F ACSlMILE COVER PAGE
(//=
011 /-1 Fax No. ~oa -33 y- 7fo
JEAN :r e wELL
From:
!? ~
E, lNA-rE~ )c,J I Fax No. ~6 &- r1.~3 - :2 7:1...0
Reference:C/i-sE IUD, G/'J -w-oJ-
Documents: -,-cST; m JVj r- LA
~ ~
FA/If! 1= /..J
)(.
Number of pages including Cover page:
Message:
/-f
74,-K. 10 111 c/.jA€ L
;:=
K N d iA.J A- t5c if, T.#-/
~'-
FROM PHONE NO. Jun. 18 2002 11: 44~M P2
~N((-W-Ol-
Ponderosa Water
Repairs 2002
1. Main valve blown in vault.
Ihr find problem
5m locate parts-go purchase parts.
2m take apart pipes-drain H2O out of vault
Shut down tanks drain lines
1.5brs install new parts, valve, check valve
turn H2O back on, pressurize lines
Down one day
2. Main line leak at Wayne Pratt'
Service line broke at valve.
' ,.. ',.. "':" , , , ,, . ,
2brs;caIl for locate, dig ,up ftozen ground, located Jeak. It Was SUn~Y;"it~"paris
" '~~', ': ':: ,:~'. " :, '
until Monday. ,
" "
0,,", "
...,."" ' '"'-"-""""~'~-;
5hrs went for new parts, sand to bed line against heaving and shifting, soil very
moist couldn't get any other soil or rock, to much snow.
Ihr repair line install sand bags and sand, pressure test after turning water back
on.
Ihr cover hole with cat JD 5S0g. To frozen to break up with little excavator then
smooth rd.
3. Install valve Wayne Pratt one in Rd was not located in safe are~ so waited until spring
then installed new valve on prop. In protected area.
2hr dig
5 cover-H2O back on, install valve, stand pipe.
Larry Fairfax 6/3/02
FROM PHONE NO. Jun. 18 2002 11: 45~M P3
Ponderosa Water
Repairs 2001
1. Turn H2O on at main valve on comer, had top screw top back on because plumber
didn't have proper tools to turn H2O. He used socket which took it off just fme but I had
to hold it in place to put back on. Then turn on H2O. Check his work for leaks none
detected.
Ihr
.. -
2. Repair leak in main line to tank
6hrs locate leak, dig up, go for parts, repair. pressure test, cover back up.br after settle down period.
' ' ,,',' ,.. ":~~;':"';'" "
r::~:;k2Lti~j~
3. Valve line leak at Mucully s locate, dig up, parts run, repair, cover, 'test,' ' '
..e,.
. '
4hrs
4. Steve dug well had to inspect disconnected line.
1hr
S. Dig up leak at Russ Blackwells valve failure locate, dig repair, pressure test, cover
6. Dig up three leaks by Plotskis capped off and turned off valves, did not cover
4hrs
1. Dig up main valve, someone buried it, possibly phone co.
2hrs install new riser so wont happen again.
8. Put valve in at Steve Nelson they didn't have one"suspected leak.
3hrs locate, dig,parts run, repair, tes~ cover install valve, stand pipe with cap
9. Install valve, Frost Free on top lot
2hrs customer paid for 2hrs- 4hrs total plus pans
10. Repair frost free valve at Platskis it was leaking
2hrs tear down, parts run, repair.
11. Fix leak a cabins Richard Kristian
2hrs turn off H2O, tear apart, parts run, fix, test.
'. ", .......' "' -" -' ..- :.. .!:.. '.',..,
Larry Fairfax 6/3/02
FROM PHONE NO. Jun. 18 2002 11: 45~M P4
Ponderosa water schedule 20 hr
Daily schedule. on call 24hrs day
10x365
==
3650 1. Chlorine test 1/2hr (at Fairfax residence, Ihr anywhere else)10x365 = 3650 2. Daily reading Va hr (includes check on chlorine level)10x365 - 3650 3. Book work ~ hr
Weekly
lOxS2 = 520 1. Check tanks-~ hr
2Ox52 = 1040 2. Cruise system, 1-2hrs depending on finding something wrong.
"..,..,...," ," '
EvervTwoweekS
.....'":,..:,~;-::,:.;:::;;.~~:~~~~~~:~:~:,
4O.5x12 = 1300 1. Fill chlorine tank 2Y2hrs. includes going to get chlorine, distiHed
H2O.
Monthly
4O.5x12
.,.,
600 I. Due chloroform test 2Yzhrs, includes del. Test, to lab20x12 .. 240 2. Book work send in monthly report to DEQ. Ihr
320x2 = 640
2M .,., 40
2M =
4Ox2 = 80
SemiYearly
1. Clean and check stand pipes 16hrs, includes looking for leaks.
2. Blowout fire plugs Ihr
3. Check lines up to tank lhr
4. Clean around main shut off's 2hrs, look for leaks.
Yearly80xl = 80 1. Approx 25 H2O test for DEG. 4hrs, includes del. To lab.
20Ox 1 = 200 2. Take a class minimum 10hrs, 8hrs class, 2hrs drive time.
$15,730
,. ,.. , , ' ", ";" "
This ,is with,.no repairs or Holiday H2O repairs or weekend repairs, or any"""V';"':;.
",~:"",..'" ," ",
turn on or turn off's, also doesn t include dealing with irate customers being a on site
maintenance man. Also doesn t include dealing with DEQ. Visits, or P.C. visits. or
answering phone calls from customers or realtors or P., or DEQ.
Larry Fairfax 5/31/02