Loading...
HomeMy WebLinkAbout20210714FLS to Staff 7.pdf Rates & Regulatory Affairs FLS-W-21-01 Falls Water Company Application for Approval of Three Capital Projects Data Request Response Request No.: FLS-W-21-01 IPUC DR 7 REQUEST NO. 7: Please explain how the Company has addressed cross-connection control. Response: The Company does not currently have an active cross-connection control program. The September 2019 Schiess & Associates study recommended that, through survey or field inspection or both, a database be prepared to identify possible cross connection problems, and that armed with such data, the Company would be prepared to design a cross-connection control plan that fits their needs. Falls Water will begin the data collection process to determine the extent to which a cross connection plan can be created.