HomeMy WebLinkAbout20210714FLS to Staff 22.pdf Rates & Regulatory Affairs FLS-W-21-01 Falls Water Company Application for Approval of Three Capital Projects Data Request Response Request No.: FLS-W-21-01 IPUC DR 22 REQUEST NO. 22: Please provide the Company's planned schedule for completing the remaining drinking water improvements shown in Table 7 – Projects Addressing Existing Deficiencies of the 2019 Falls Water Company Drinking Water Capital Facilities Plan. Response: The planned schedule to complete the projects shown in Table 7 – Projects Addressing Existing Deficiencies of the 2019 Capital Facilities Plan is shown in the table below: Project ID Project Description Scheduled Planned/Completed A-1 Ryan Anderson Development Well (Well 11) 2021 In Progress A-2 Cowley Road from 1st Street to John Adams Pkwy 2020 Completed A-3 Lincoln Road from 4743 E Lincoln to Wood River Road 2021 Completed A-4 Replace 6” Pipe in Fall River Road with 8” Pipe 2021 Planned A-5 Replace 6” Pipe in Edwards Drive with 8” Pipe 2022 Planned A-6 Harding Lane from Kit Lane to 1st Street 2024 Planned A-7 25th East and Iona Road Waterline Extensions 2020 Completed A-8 Ammon Road from Pearce Drive to Greenwillow Dr Complete A-9 Ammon Road from Greenwillow Drive to O’Bryant Street 2024 Planned A-10 Replace 6” Pipe in Dixie Street with 10” Pipe 2022 Planned A-11 Replace 8” Pipe East of Well 2 with 12” Pipe 2023 Planned A-12 First Street from Robison Drive to Wheatfield Lane 2024 Planned A-13 First Street from Ammon Road to Nassau Drive 2022 Planned A-14 Replace Fallsbrook asbestos cement pipe – Lakewood St to Upland St 2026 Planned FLS-W-21-01 IPUC DR 22 NWN Response Page 2 of 2 Project ID Project Description Scheduled Planned/Completed A-15 Replace Fallsbrook asbestos cement pipe – Jensen Drive 2026 Planned A-16 Replace Fallsbrook asbestos cement pipe – Contor Avenue 2025 Planned A-17 Replace Fallsbrook asbestos cement pipe – Crawford Street 2025 Planned A-18 Replace Fallsbrook asbestos cement pipe – North Adams Drive 2024 Planned A-19 Replace Fallsbrook asbestos cement pipe – Mobile Drive 2024 Planned A-20 Increase the volumetric water right capacity by at least 535 acre-feet and the diversion rate by 3,170 gpm Obtain water right as available Purchased 208 AF of water in 2021. A-21 Reconfigure the SCADA system control of pump start and stop triggers 2021 In Progress