Loading...
HomeMy WebLinkAbout20091030Staff 22-47 to FLS.pdfKRISTINE A. SASSER DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0357 BARNO. 6618 Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5983 Attorneys for the Commission Staff c""civ:-:r",R ì- i.. ..~..¡¡ " eo"...L¥ in09 OCT 30 PM 2: 26 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF FALLS WATER COMPANY FOR AUTHORITY TO INCREASE ITS RATES AND CHARGES. ) ) CASE NO. FLS-W-09-1 ) ) SECOND PRODUCTION ) REQUEST OF THE ) COMMISSION STAFF ) TO FALLS WATER COMPANY ) The Staff of the Idaho Public Utilties Commission, by and through its attorney of record, Kristine A. Sasser, Deputy Attorney General, requests that Falls Water Company (Company; Falls Water) provide the following documents and information on or before FRIDAY, NOVEMBER 13, 2009. This production request is to be considered as continuing, and Falls Water is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that wil augment the documents produced. Please provide answers to each question and any supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules of Procedure must include the name and phone number of the person preparing the document, and the name, location and phone number of the record SECOND PRODUCTION REQUEST TO FALLS WATER COMPANY 1 OCTOBER 30, 2009 holder and if different the witness who can sponsor the answer at hearng if need be. Reference IDAPA 31.01.01.228. In addition to the written copies provided as response to the questions, please provide all Excel and electronic fies on CD with formulas activated. REQUEST NO. 22. In the Company's last general rate case (FLS-W-07-01), Commission Order No. 30484 issued on January 11, 2008 specifically directed the Company to address the following issues in its rate design when the Company fied its next general rate case: a) the 12,000 gallon minimum monthly charge; b) the implementation of seasonal differentials in the allowance; and c) whether the minimum charge should be different based upon meter size. The Company did not address these issues in its current Application. Please address these issues as directed by the Commission. REQUEST NO. 23. The Company proposes to maintain the single block commodity rate design for all metered customers for both residential and commercial classes, and maintain the first 12,000 gallons as the basis for the fixed customer charge. To the extent this is not addressed in response to Request No. 22 above, please explain the rationale behind this approach in the proposed rate schedules. REQUEST NO. 24. The Company claims that it is experiencing revenue a shortfall of approximately $9,000 per month. Please provide a summary of monthly revenue collections and expenditures in 2008 and 2007. In addition, please provide a 2007 "Profit & Loss Detail" in Excel format (like what was provided to the audit Staff during the onsite audit). In addition, please provide the 2008 "Profit and Loss Detail" previously provided on paper in Excel format. REQUEST NO. 25. One customer of Falls Water wrote to the Commission asking why construction companies building houses or developing subdivisions take water from the Company hydrants without paying for it. Please provide explanation of what the Company is doing or what it plans to do to protect its asset from abuse and minimize this occurrence. The Company may note that in Teton Springs Water (Case No. TTS-W-08-01) the Commission SECOND PRODUCTION REQUEST TO FALLS WATER COMPANY 2 OCTOBER 30, 2009 allowed Teton Springs Water to include a non-recurring charge for bulk water service for contractors (Order No. 30718). REQUEST NO. 26. Please provide justification for the construction of Well NO.9. REQUEST NO. 27. Please submit the total cost of developing Well No.9 (excluding water rights-related costs), broken down into the following categories: a) land purchase (identify the seller); b) well driling/development; c) pump and motor; d) electrical controls; e) variable frequency drive; f) appurenances; g) pump facility building; h) back-up generator; i) mainline tie-in; and j) engineering costs. Please provide copies of invoices and other documents supporting these costs. REQUEST NO. 28. In Order No. 30484, Case No. FLS-W-07-01, the Commission noted the likelihood that the property for Well No.9 was purchased from an affiliate of Falls Water. For affliate expense to be justified, the utilty needs to provide compellng evidence of ar's length bargaining when incurring costs between the utilty and the affiiate. In addition, it appeared that the water rights were acquired from a company affiliated with Falls Water's vice president. In this case, the Company is asking to include Well NO.9 and its associated water rights in rate base. Please provide the necessary information to demonstrate the reasonableness of the costs for the purchase of the lot and water rights for Well No.9, including evidence of arm's length bargaining. REQUEST NO. 29. Please provide a copy of the well completion report, driling permit, and water rights associated with Well NO.9. Please include the well driler's log, specifying the depth and diameter of the well, and pump test results. REQUEST NO. 30. Please provide the design capacity (gpm) of the pump and size of motor (hp) in Well NO.9. REQUEST NO. 31. Please provide the size of back-up generator (kW) for Well NO.9. SECOND PRODUCTION REQUEST TO FALLS WATER COMPANY 3 OCTOBER 30, 2009 REQUEST NO. 32. Please provide the as-built plans for the completed Well NO.9 (well, pumping plant, back-up generator, mainline-tie-in, etc.). REQUEST NO. 33. Staff notes that Well NO.9 was placed into service in May 2009. Please provide copies of documentation indicating that the Idaho Deparment of Environmental Quality has given approval of the as-built plans for Well NO.9 to operate it as par of the Falls Water system. REQUEST NO. 34. Please provide an explanation and documentation (competitive bid documents, selection process, work contracts, etc.) showing cost control efforts have been applied in paying for any of the work elements for Well NO.9 (i.e., well development, installation of pumps and motors, back-up generators, etc.) to be sure that the project was built as economically as possible. REQUEST NO. 35. Please provide a list of all Company water rights that are licensed, under permits, under protests, specifying the License No. or Permit No., priority date, authorized diversion rate (cfs) and authorized anual volume (acre-feet), if applicable, issued by the Idaho Deparment of Water Resources. REQUEST NO. 36. Please provide a list of all water rights purchases made through private transactions specifying the date of purchase, seller, flow rate and/or volume of water purchased, and total cost of acquisition for each transaction. Please provide a copy of the sales agreement for each transaction. REQUEST NO. 37. Please provide the curent peak flow requirements (PHD-peak hour demand) of the Falls Water system (i.e., cfs, gpm, gpd). REQUEST NO. 38. Please provide a list of all well source pumps and their corresponding design capacity (gpm). SECOND PRODUCTION REQUEST TO FALLS WATER COMPANY 4 OCTOBER 30, 2009 REQUEST NO. 39. Please provide monthly water production data and appropriate yearly total for calendar years 2006, 2007 and 2008. REQUEST NO. 40. Please provide monthly water consumption data for each class of customers served (commercial, residential and multi-family residential) and the appropriate total for calendar years 2006,2007 and 2008. For unmetered customers during any period, make an appropriate estimate. REQUEST NO. 41. Please provide the year-end number of customers for each customer class for calendar years 2006, 2007 and 2008. REQUEST NO. 42. Please provide an estimate of total unaccounted water losses due to leaks, wasted water, etc., by month for calendar years 2006, 2007 and 2008. Please explain how these losses are calculated. REQUEST NO. 43. The Company plans to install 300 new meters and 300 MXU transmitters with a total cost of $85,536 in 2009. Application at 2. Please provide a construction bid, detailed cost estimate(s) or actual invoice(s) if project is already completed. Please indicate what size(s) of service meters are being replaced. If the project is not complete, please provide the estimated completion date. REQUEST NO. 44. After completing the project described in Request No. 42, Staff assumes that the Company's meter replacement program is complete; that means all customers wil be metered. Please provide the total breakdown of meters installed by size for each customer class. Please provide also the breakdown of the meters installed by type, such as: a) touch read meters; and b) manual read meters. SECOND PRODUCTION REQUEST TO FALLS WATER COMPANY 5 OCTOBER 30, 2009 REQUEST NO. 45. Please provide a detailed estimate or copy of actual invoice(s) of a fire hydrant replacement shown in Exhibit 1, colum E, line 9. Please explain if this fire hydrant is going to be reimbursed by the City of Ammon or the local fire district. If not, why not. REQUEST NO. 46. The Company states that at the beginning of the summer irrigation period, many customers question their usage being biled. The Company indicates that it has conducted tests for the accuracy of the service meters. Please provide the total number of meter accuracy tests performed by the Company in 2007 and 2008. Please indicate how many of the total meters tested did not meet the manufactuer's accuracy specification of plus/minus 1.5%. REQUEST NO. 47. In Commission Order No. 30027, the Commission ordered the Company to "enhance its SCADA software capabilties, to identify and better control its water loss and to improve its delivery effciency." Please explain the status of the Company's SCADA system and address the efforts instituted by the Company to control water losses and improve its delivery system. '2I\TlIDated at Boise, Idaho, this -..day of October 2009. ~O;a.~A,istine A. Sasser Deputy Attorney General Technical Staff: Gerry Galinato/22-47 i:umisc:prodreq/fsw09.1 ksgg prod req 2.doc SECOND PRODUCTION REQUEST TO FALLS WATER COMPANY 6 OCTOBER 30, 2009 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 30TH DAY OF OCTOBER 2009, SERVED THE FOREGOING SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO FALLS WATER COMPANY, IN CASE NO. FLS-W-09-01, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: K. SCOTT BRUCE FALLS WATER COMPANY, INC. 2180N. DEBORAH DR. IDAHO FALLS, ID 83401 E-MAIL: scott1Ø)fallswater.com ROBERT E SMITH 2209 N BRYSON RD BOISE ID 83713 E-MAIL: utilitygroupØ)yahoo.com ~Jc)~ SECRETA CERTIFICATE OF SERVICE