Loading...
HomeMy WebLinkAbout20090716EAG to Staff 30.pdfMolly. O'Leary (ISB # 4996) RICHARDSON & O'LEARY, PLLC P.O. Box 7218 Boise, ID 83707 Tel: 208-938-7900 Fax: 208-938-7904 Molly~ richardsonandoleary.com Attorneys for Eagle Water Company, Inc. RECE D 2009 JUl l 6 PH 3: 41 IDAHO PUßLli,(" UTILITIES COMMISSIOr'l BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF EAGLE WATER ) COMPANY'S APPLICATION FOR AUTHORITY ) TO IMPLEMENT A CUSTOMER SURCHARGE. ) ) ) ) ) CASE NO. EAG-W-09-t EAGLE WATER COMPANY, INC'S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF COMES NOW, Eagle Water Company, Inc. and in response to the First Production Request of the Commission to Eagle Water Company dated March 24, 2009, herewith submits the following supplemental information: REQUEST NO. 30: Please submit a cost breakdown for the development of Well NO.7 into the following categories: a) land purchase (and identify the seller); b) well driling / development; c) pump and motor; d) electrical controls; c) (sic) variable frequency drive; f) mainline tie-in; and j) (sic) engineering costs. Please provide the invoices and other documents supporting these costs. .3 Ò Supplemental Response for Request No.A: Please see document marked "Supplemental. Response No. 30" attached hereto. Response prepared by Robert V. DeShazo, Jr., President, Eagle Water Company, Inc., (208) 939-0242. Records are at 172-D W. State, Eagle, Idaho. EWCO SUPPLEMENTAL RESPONSE TO COMMISSION STAFF'S FIRST PRODUCTION REQUEST-l DATED this 16th day of July, 2009. EWCO SUPPLEMENTAL RESPONSE TO COMMISSION STAFF'S FIRST PRODUCTION REQUEST- 2 SUPPLEMENTAL RESPONSE TO REQUEST NO. 30 EWCO SUPPLEMENTAL RESPONSE TO COMMISSION STAFF'S FIRST PRODUCTION REQUEST- 3 .. _..__ø.~Ø__h_ -.. ... COM PAN Y,INC. (208) 939-0242 FAX (208) 939-261 P.O.8OX4SS EAGLE, lÐAHOa3616 July 8,2009 Well No~ 8 .. Total Cost Lot cost $60,000.00 (Eagle Gravel Inc.) At 7%, interest/year As of 7-09 ALL ITEMS BELOW ARE A COST ESTIMATE ONLY Well Drilling and Devekipment Pump and Motor Eleccal Controls and Idaho Power Une Variable Frequency Drive Appurtenances - Piping Pump Facilty Building (see Note 1) Back Up Generator and Building Main tine Tie-In Engineering Cost $63,150.00 $148,350.00 $63,100.00 $48,800.00 $56,000.00 $27,000.00 $68,300.00 $85,000.00 $47,000.00 $30,835.00 NOTE 1: This item contains aU site work, compacted imported fill, excavation, foundation, frame, insulation, roofing, dryall, exterior/ interior finish, pipe/control installation, welding, painting, A.C. for building, d.ischarge line, landscping, all labor cost, all equipment cost, architectural fee, overhead and profi. ~~~5L~ 'fr "RubeM- ~~'v-W ~ \ . Robert DeShazo, Jr. PreSident