Loading...
HomeMy WebLinkAbout20090713EAG to Staff 1, 21.pdfMolly O'Leary (lSB # 4996) RICHARDSON & O'LEARY, PLLC P.O. Box 7218 Boise, ID 83707 Tel: 208-938-7900 Fax: 208-938-7904 Molly(ß richardsonandoleary.com Attorneys for Eagle Water Company, Inc. RECEIVED l009JUl I 0 PM~:5i. IDAHO PUBLIC UTILITIES COMMiSSION BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF EAGLE WATER ) COMPANY'S APPLICATION FOR AUTHORITY ) TO IMPLEMENT A CUSTOMER SURCHARGE. ) ) ) ) ) CASE NO. EAG-W-09-1 EAGLE WATER COMPANY, INC'S SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF COMES NOW, Eagle Water Company, Inc. and in response to the First Production Request of the Commission to Eagle Water Company dated March 24, 2009, herewith submits the following supplemental information: REQUEST NO.1: Please submit a cost breakdown for the development of Well No. 7 into the following categories: a) land purchase (and identify the seller)¡ b) well driling / development¡ c) pump and motor¡ d) electrical controls¡ c) (sic) variable frequency drive¡ t) mainline tie-in¡ and j) (sic) engineering costs. Please provide the invoices and other documents supporting these costs. Supplemental. Response for Request NO.1: Please see document marked IISupplemental Response No. I" attached hereto. Response prepared by Robert V. DeShazo, Jr., President, Eagle Water Company, Inc., (208) 939-0242. Records are at 172-D W. State, Eagle, Idaho. EWCO SUPPLEMENTAL RESPONSE TO COMMISSION STAFF'S FIRST PRODUCTION REQUEST- 1 REQUEST NO. 21: Please submit invoices supporting the payments made for various items related to the rehabiltation of the booster pump for Well No.2 including the 100-hp pump and recorder ($94,000), generator set ($75,000) and engineering ($5,700). Supplemental Response to Request No. 21: Per Eagle Water Company's prior response (filed May 7, 2009), the Well #2 booster pump was not rehabiltated. It appears that the Commission Staff may have confused the proposed Well #2 booster pump rehabiltation project with the IIMain Booster Station" costs identified on page 4 of the current Temporary Surcharge Application. With that clarification, the actual cost for installation of a flow recorder, including equipment, labor and materials, is $8,000.00. Response prepared by Robert V. DeShazo, Jr., President, Eagle Water Company, Inc., (208) 939-0242. Records are at 172-D W. State, Eagle, Idaho. DATED this 10th day of July, 2009. EWCO SUPPLEMENTAL RESPONSE TO COMMISSION STAFF'S FIRST PRODUCTION REQUEST- 2 SUPPLEMENTAL RESPONSE TO REQUEST NO.1 EWCO SUPPLEMENTAL RESPONSE TO COMMISSION STAFF'S FIRST PRODUCTION REQUEST - 3 COM PAN Y,INC. (208) 939..242 FAX (208) 939-261 P.O.80X455 EAGlE, IDAHO 83616 July 8,2009 Well No.7.. Totl Cost Lot cot $40,000.00 (Eagle Graveline.) At 7% interetlear As of 6-09 Well Drilling and Develpment Pump and Motor Eleccal Controls and Idaho Power Une Variable Frequency Drive Appurtnances - Piping Pump Faclity Buildíng (see Note 1) Back Up Generator and Building Main line Tte-ln Engineering Cost $48,782.50 $115,624.00 $34,659.00 $27,958.96 $13,230.00 $25,030.00 $89,894.24 $89,914.60 $114,023.97 $17,535.54 NOTE 1: This item contains an site work, compact imported fiU, excavatìoni foundation, frame, roofing, dryall, extrior and interior finish, pipe and control installation, welding, exteror and interior painting, discharge Hne to pond. alllabor costs, all equipment cot~ overhead and profit. GO Robert DeShazo, Jr. President