HomeMy WebLinkAbout20131217Staff 20-27 to AWW.pdfNEIL PRICE
DEPUTY ATTORNEY GENERAL
IDAHO PUBLIC UTILITIES COMMISSION
PO BOX 83720
BOISE, IDAHO 83720-0074
(208) 334-0314
ISB NO. 6864
Street Address for Express Mail:
472 W , WASHINGTON
BOISE, IDAHO 83702.5918
Attorney for the Commission Staff
IN THE MATTER OF THE APPLICATION OF
ACME WATER WORKS INC FOR A
CERTIFICATE OF PUBLIC CONVENIENCE
AND NECESSITY.
,l:-"
illl l-rir r -:r: I .,' :. i iH
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
cAsE NO. AWW-W-13-01
SECOND PRODUCTION
REQUEST OF THE
COMMISSION STAFF TO
ACME WATER WORKS,INC.
The Staff of the Idaho Public Utilities Commission, by and through its attorney of record,
Neil Price, Deputy Attorney General, requests that Acme Water Works, Inc. (Company, Acme
Water) provide the following documents and information as soon as possible, but no later than
TUESDAY, JANUARY 7, 2014.
This Production Request is to be considered as continuing, and the Company is requested
to provide, by way of supplementary responses, additional documents that it or any person acting
on its behalf may later obtain that will augment the documents or information produced.
Please provide answers to each question, supporting workpapers that provide detail or are
the source of information used in calculations, and the name, job title and telephone number of
the person preparing the documents. Please identiff the name, job title, location and telephone
number of the record holder.
SECOND PRODUCTION REQUEST
TO ACME WATER WORKS, INC.DECEMBER 17, 2013
In addition to the written copies provided as response to the requests, please provide all
Excel and electronic files on CD with formulas activated.
REQUEST NO. 20: In reference to the Company's response to Production Request No.
I relating to the components of the water system built to date, please respond to the following:
o Sheet 1.2 (Ownership and Phasing Map, Phase I - Partial as Built Plan), has the
following note for lot numbers 17 - 22:"ADDITIONAL LOTS/ERU'S TO BE
SERVED BY WAHLIN PHASE 1. THESE LOTS/ERU"S ARE SERVED
LTNDER SEPARATE SEWER AGREEMENT." Please provide a copy of the
sewer agreement and a brief explanation for the service arrangements to these six
lots.
REQUEST NO. 2l: In reference to the Company's response to Production Request No.
3.1, please respond to the following:
1) The Company provided a list of customers (active and inactive) as of October 15,
2013. Please indicate where those customers are located (e.g. Block 3, Lot 1,
etc.).
2) For the multi-family or condominium unit customers, please indicate how many
are active customers and how many are inactive customers (those who are not
currently getting water but the company charges monthly standby fees).
3) For all dwellings currently receiving water service or under standby service
(single family, multi-family or condominium buildings), please specify the
diameter size of water service lines supplying these properties. If the water
service lines are different diameter sizes please provide the number of dwellings
and types served by each size.
REQUEST NO. 22: [n reference to the Company's response to Production Request No.
4.1, please respond to the following:
SECOND PRODUCTION REQUEST
TO ACME WATER WORKS, INC.DECEMBER 17, 2013
Please explain or provide a copy of the Company's worksheet showing how the
total ERU's to be served was estimated. Include all formulae or assumptions used
in the calculations.
Please identify all the lots currently served and the remaining lots (i.e., for Phase
1 and Phase 2) that could potentially be served by the present water system (i.e.,
as shown in the Phase 1 - Partial As-Built), the estimated total ERU's for each
lot, current ownership, and lot seller. For example, Block 1, Lot 1 : I ERU,
current owner: Acme Water Works, Inc.; Block 2,Lot2: 16 ERU's
(Condominium), current owner - Acme Water Works, Inc.; etc. Please provide
this information and data in a tabular format.
Please provide a separate list and map that identifies all of the lots previously sold
by Schweitzer Village Subdivision Joel Wahlin (i.e., the developer) that were not
involved in the foreclosure.
Please provide a separate list and map that identifies all of the lots in either Phase
I or Phase 2that have been foreclosed upon.
REQUEST NO. 23: In reference to the Company's response to Request No. 6.8, please
respond to the following:
l) Does the Company plan to install service meters in the future? If the answer is
yes, please indicate what time period.
2) Please provide an estimate of the cost of installing meters for the following: a)
existing customers currently receiving water service, and b) new customers
requesting water service.
3) If the answer is no to Item No. I above, please state the Company's rationale in
proposing a two-block increasing rate design with a minimum charge volume
allowance. This Company's proposed rate design requires metered volume of
water sales.
REQUEST NO. 24: In reference to the Company's response to Request No. 7.1, please
provide an itemized cost of actual hookup expenditures for customers to the Company's existing
SECOND PRODUCTION REQUEST
TO ACME WATER WORKS, INC.
1)
2)
3)
4)
DECEMBER 17 ,2013
service lines (1-inch,11l2-inch and 2-inch) as per service line installation shown in Sheet 2.28
(Phase 1- Partial as Built Plan), disregarding recovery cost of previous and future investments in
the water system. Please provide copies of invoice(s), if available.
REQUEST NO. 25: In reference to the Company's response to Request No. 7.3, please
explain how the Company will meter bulk water sales.
REQUEST NO.26: Staff understands that the water production from Well No. 1 is
metered (Reference Sheet 2.36,Partial as Built Plan). Please provide monthly and annual
production flow data from Well No. I since the Company started providing water service until
November 30,2013.
REQUEST NO. 27: Please provide a complete copy of the Technical, Financial and
Managerial Report (including all Appendices) for the Schweitzer Village Water System (aka
Acme Water Works, Inc.) completed in June 2008.
DATED at Boise, Idaho, ,hir\)k of Decemb er 2073.
Neil Price
Deputy Attomey General
Technical Staff: Gerry Galinato & Johanna Belll20-27
Umisc/prodreq/awwwl3 lnpjbgdg prodreq2
SECOND PRODUCTION REQUEST
TO ACME WATER WORKS, INC.DECEMBER 17,2013
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS I7H DAY OF DECEMBER 2013,
SERVED THE FOREGOING SECOND PRODUCTION REQUEST OF THE
COMMISSION STAFF TO ACME WATER WORKS, INC., IN CASE NO.
AWW.W-I3-01, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE
FOLLOWING:
JOEL WAHLIN
OWNER
ACME WATER WORKS INC
67 WILD HORSE TRAIL
SANDPOINT ID 83864
EMAIL: Jl_Plus5@yahoo.com
BOB HANSEN
ACME WATER WORKS INC
67 WILD HORSE TRAIL
SANDPOINT ID 83864
EMAIL: wsmibob@aol.com
CERTIFICATE OF SERVICE