Loading...
HomeMy WebLinkAbout20140306DEQ Report.pdfSTATE OF IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY r lronwood Parkway, Coeur d'Alene, lD 83814 (2OB) 769-1422 C. L. "Butch" Otter, Governor Toni Hardesty, Director May 24,2010 Mr. Joel Wahlin 22 Crooked Ear Ct Sandpoint, ID 83864 Subject: Partial Record Drawings - Accepted; Project Abandoned - Well #3; Schweitzer Village, Acme Water Works Dear Mr. Wahlin: Record drawings for Phase I of the water system, prepared on February 15,2010 by Eric Eldenburg, P.E. representing Acme Water Works for completion of the Schweitzer Village water system have been reviewed. Schweitzer Village is a new subdivision on Schweitzer Mountain designed for 260 residences on 107 lots serving approximately 650 people. Drinking water is provided by Acme Water Works and sewer services are provided by Mountain Utility Company. Phase I of the project provides service to approximately 40 lots. The record drawings have been compared to the construction plans and specifications as approved by DEQ on July 22,2008 and found to be acceptable. The submiual is hereby accepted by DEQ per Section 39-l l8 (3) of Idaho Code as the record drawings for this project. With the submittal was a note indicating development of Well #3 has been postponed indefinitely. If development of the well is pursued in the future, DEQ must be contacted. Acme Water Works is constructed to serve as a public water system and will need to have a sanitary survey performed in the future. Panhandle Health District will be providing oversight for the system and Acme Water Works should contact their office for further information. Regards,,44 Michael Camin, P.E. Environmental Engineer michael.camin@deq.idaho. sov c: EricEldenburg,P.E.,Sewelleeldenburg@jaser.vell.com Jeff Jensen, P.E., Sewell i.i ensen @j asewel l. com Bob Hansen, WSMI wsmibob(Oaol.com Jamie Barton, PHD jbarton@.phdf .idaho.gov File: Acme Water Works (#1l258jlans in Spec-S-510) 21 10 lronwood Parkway, Coeurd'Alene, lD 83814 (2OB)769-1422