Loading...
HomeMy WebLinkAbout20050628_1239.pdfDECISION MEMORANDUM TO:COMMISSIONER KJELLANDER COMMISSIONER SMITH CO MMISSI 0 NER HANSEN COMMISSION SECRETARY LEGAL WORKING FILE FROM:HARRY V. HALL DATE:JUNE 24, 2005 SUBJECT:TERRA GRANDE WATER TARIFF ADVICE NEW SERVICE CONNECTIONS, SCHEDULE NO. On May 24 2005 Terra Grande Water (TGW) requested approval of new a Tariff Schedule No.2. Tariff Schedule 2 (attached) for new service connections is being handled as a Tariff Advice. The current Terra Grande Water Tariff No. 1 , page 3, section 3 provides for collection of new service connection costs, however, a tariff is not defined. This new tariff will allow TGW to recover those costs. In this Tariff Advice, TGW has proposed that the cost of a new service connection be a pass through, of the actual costs for completing a new connection for water service. TGW is a small water system supplying 11 7 residential customers. The TGW service territory consists of a several block area located south ofW. Overland Rd., north ofW. Targee St., east of S. Milwaukee St. and west of S. Ash Park Lane in Boise. In accordance with Commission Order No. 29716, TGW customers are served with water purchased from United Water. Commission Staff believes it is reasonable and prudent to allow TGW to recover these actual costs and to provide TGW with exclusive control over those new connections as requested in the Tariff Advice. REQUEST In accordance with IDAPA 31.01.01.134, Terra Grande Water requests that new tariff Schedule 2 become effective upon Commission approval. DECISION MEMORANDUM JUNE 24, 2005 STAFF RECOMMENDATION Since the request proposes to only bill customers for actual costs incurred, staff recommends that TGW's request for new tariff Schedule 2 be approved as requested. COMMISSION DECISION Does the Commission approve Terra Grande Water s request for the new tariff Schedule No. /j/ -UI udmemos/TGW tariff advice dec memo DECISION MEMORANDUM JUNE 24, 2005 Tariff No. C. No. Schedule No 2 Name of Utility TERRA GRANDE WATER New Service Connections Cost for New Customer Service Connections: Terra Grande is responsible for the completion of new service connections within its certificated area. No such connections shall occur other than by the direction and authorization of Terra Grande Water. Upon a request from a customer or owner renting property for residential use ("customer ), for a new service connection to Terra Grande s water system said new customer is responsible for paying Terra Grande Water for the actual cost of completing a connection for water service to Terra Grande s Water system. These connection costs include but are not limited to all costs for engineering, installation and materials, which include but are not limited to piping for a new connection between the water main and the residence, a meter set (does not include a meter), a vault and a stop valve. The Company shall follow the "Rules and Regulations of the Idaho Public Utilities Commission Governing Customer Relations of Natural Gas, Electric, and Water Public Utilities Under the Jurisdiction of the Commission Issued:May 20, 2005 June 28, 2005Effective Issued By Title DECISION MEMORANDUM JUNE 24, 2005