Loading...
HomeMy WebLinkAbout20130906INTG to Staff 1-5.pdfEXECUTIVE OFFiCES INTERMOUNTAIN GAS COMPANY prn 555 SOUTH COLE ROAD •P.O.BOX 7608 •BOISE,IDAHO 83707 •(208)377-6000 •FAX:377-6097 SFF—5 PM :3 September 6 2013 1,)f:rL-, ——,,--•r’’ Jean Jewel! Idaho Public Utilities Commission 472 West Washington St. P.0.Box 83720 Boise,ID 83720-0074 RE:first Production Request of the Commission Staff to Intermountain Gas Company Case No.INT-G-13-05 Dear Jean: Enclosed for filing with this Commission are an original and seven (7)copies of Intermountain Gas Company’s responses to the First Production Request of the Commission Staff,in the above referenced Case. If you have any questions or require additional information regarding the attached,please contact me at 377-6168. Sincerely, Michael P.McGrath Director -Regulatory Affairs Intermountain Gas Company Enclosure cc Scott Madison Morgan W.Richards REQUEST NO.1: Question -Please describe in detail hrnt’the Company determines f existing customers are on the correct rate.Please explain how billing audits are conthtcted and how frequently those audits are peiforined. Answer —Intermountain Gas Co’s CIS system (Customer Watch)will not allow an account to bill if the premise category and the rate class do not match.ie;commercial premise on a residential rate.If a miss- match is found between the premise and rate category,the account appears on the daily report called “Billing Exceptions by Status”(C16380).This report identifies all active meters within a given cycle that did not charge because of the disctepancy.Billing Audit personnel then work the report and make the necessary corrections to ensure correct billing which in turn allows the system to generate the correct charges and statement/bill.In addition,Report Cl7580 “Audit Account Package and Premise”generates every Monday and reveals any discrepancies between premise category and the assigned rate class that were changed the week prior.This report is “worked”and corrections are made. On a daily basis,there are regular reports that might reveal a discrepancy in the customers’rate class based on current usage.The two reports that would reveal this are the Fail/Low Meter reads compared to last year’s report and the Zero Usage Atidit (C1697OA).Both reports are worked daily and used to determine why usage declined.e.g.:usage in the summer declined substantially or usage goes to zero.In addition to checking the functionality of the meter,the work order also requests an inventory check.If the customer rate is RS2,and the usage declines substantially from the previotis summer month,it is possible the customer has converted natural gas water heat to another source of energy.Verification of this would initiate a change in rate from RS2 to RS I. In addition to these audits,whenever the Billing Audit group initiates an order for a service trip,a request is made for an inventory check while the technician is at the premise.If access is unavailable,a door tag is left requesting the customer call in to the CSC.A note is made on the accotmt so the CSR can make the inquiry if the customer does call in.A customer’s rate is never changed from RS2-RSI without field verification or verbal verification from the customer that the equipment has been changed out,thus meriting the change in rate class. In addition to the above audits,the customer and/or plumbing contractor should notify IGC regarding the addition of any natural gas water heating appliance. Person Preparing Answer:Cheryl A.Imlach,Manager Revenue Accounting,Ph 377-6179 Record Holder:Michael P.McGrath,Director —Regulatory Affairs,Ph 377-6168 REQUEST NO.2: Question -for CY2012,please provide the number of customers imioved to a different rate schedule. listing both the previous and new rate schedule assigned. Answer -During CY2012,736 customer accounts were moved to a different rate schedule.To illustrate the effectiveness of the audit tools mentioned in Request No.1,22$or 31%of those were changed to the current rate within I day of starting service. GS1O 2 T4 GS1I GS11 26 GSIO 3 RSI 13 RS2 8 14 2 GS2O 3 GSI1 3 ISR 1 RS2 I RS1 245 GSII 16 ISR RS2 228 RS2 456 GSII 16 ISR 3 RSI 437 T4 3 GSIO I GS1I GS2O I Person Preparing Answer:Cheryl A.Imlach,Manager Revenue Accounting,Ph 377-6179 Record Holder:Michael P.McGrath,Director —Regulatory Affairs,Ph 377-6168 REQUEST NO.3: Question -Please describe in detail the process used to determine whether a new customer who places a connect order should be assigned the rate schedule assigned to the previous customer.If there are scripts followed by call center customer service representatives,please provide a copy ofthose scripts. Answer —Please reference the Answer to Request No.4. Person Preparing Answer:Michael P.McGrath,Director —Regulatory Affairs,Ph 377-6168 Record Holder:Michael P.McGrath,Director —Regulatory Affairs,Ph 377-6168 REQUEST NO.4: Question -Please describe in detail the procedures in place to ensure that a customer reqitesting service at a previously unserved location,e.g.,new construction,is assigned to the correct rate schedule. Answer -Consumer Sales Representatives work with home owners,local HVAC companies,architects and engineers to determine the required load,appliances to be used and determine the appropriate rate on new residential and small commercial sales,single and multiple meter manifolds.This information is entered onto the Service Line Agreement,Form 512,and the data is entered into our Customer Information System. Single meter or multiple meter manifold sales from new construction may be handled by our GIS Field Technicians or an Operation Aide as a part of the Joint Trench Service program.In this case,the rate selected has been based on historical uses by the builder on new homes with a minimum of gas being tised for space and water heating needs.Contact with the builder is made and we ask that they sign a Service Installation Agreement,form 5 19,to speed up the processing of new starts.At this time we ask which appliances they intend to add on all of his homes.The load and appliances on these homes may be estimated on initial paperwork to be verified later by the Consumer Sales Representative,GIS Field Technician,Operations Aide or Customer Service Representative,CSR,when the meter set is requested. When the customer calls our Customer Service Center to initiate and/or start service on newly constructed homes they are asked several questions to determine what appliances are in the home.The CSR is looking for the combination of space and water heat which qualifies the customer for the RS-2 rate.When another customer establishes service at the same location IGC assumes the appliances from the original request for service hasn’t changed which could affect the rate class (furnace &water heater)and they are then billed under the established rate class. For customers setting up a commercial account at a residential premise,a CSR may ask if the customer is also living there.If the customer indicates they are living there,the customer would still be billed as residential. If a current customer with an established RS-1 rate indicates they have installed a water heater and want the better rate we take their word for it.The billing department monitors two reports which could indicate the customer may need their rate adjusted.The Meter Read Compared to Last Year and the Zero Usage Audit will catch any discrepancies in usage on RS-2 accounts that have zero consumption during the summer months. When these reports show a potential error a phone call is made to the ctistomer and/or a service order is created for a service technician to check the meter and verify appliances in the home.If the technician speaks with the ctistomer and they indicate they have removed their water heater,the technician completes his order and directs it to the billing department to make the rate adjustment.IGC will not adjust the rate without speaking with the customer or verifying the equipment first. Person Preparing Answer:Randy Morgan,District Manager,Ph 377-6829 Record Holder:Michael P.McGrath,Director —Regulatory Affairs,Ph 377-6162 REQUEST NO.5: Question -Please provide copies of or links to information made available to customers to enable them to choose the most appropriate rate schethilefor their customer class and type of use. Answer — •RSI and RS2 rate explanations are part of the “Rates and Tariffs”page on the website. http://www.intgas.com/rates-services/rates This page includes a statement advising the customer to contact us if they feel they are on the incorrect rate.It also has bulleted items explaining each rate and a link to the tariff: “If you think you should be in a different category,please call our Customer Service Center at •The FAQ page of the website also has a question of “What rate do I pay?”In the FAQ explanation it indicates the rate is based on the type of service used and links to the “Rates and Tariffs”page referenced above. •The back of the billing statement includes a breakdown of each type of rate.This information is also available online for those that receive their bills electronically. http://www.intas.com/customer-service/biIlunderstanding Person Preparing Answer:Mike Kingery,Manager of Programs and Support Services,Ph 898- 7169 Record Holder:Michael P.McGrath,Director —Regulatory Affairs,Ph 377-6168 Original:Gas Measurement Ist Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Intermountain Gas Company DIVISION GAS LOSS REPORT Town Division Ot htt Date 12 tL/L,.Report No.____________ Project No._________________Service No.O1D35I7 Pipe Size “4 Leak Order No. Gas Pressure at Time of Break:Normal PuN Down Time of Break I 0:‘j Outage:Yes No U How Long No.of Customers Time Under Control 1 LIb Location 52O &1’t 0&l 4 VP L I dtkf1 I Total Time of Blow i-irs tc d b (tL -- 1Ahhu’14k Y”&itL REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE I MJRGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 56 A Percent Open A Gauge Pressure B CD.2 (IN 2)O.1%5 B Rated Capacity B ID.2 C Time of Blow (ht)/A.’)C Time of Blow C Pipe Length (in 1,000 ft.)0 Avg.BTU (TH/MCF)D Constant D Constant .004041 E Total Therms I * Total Therms Total Therms 0 Per Therm (),‘4 I 7— Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $7.q feet or more. Regulator Station No. Customer Name - Is customer billed for lost volume? Yes j No *AxBxCxD=Therms Ax B x C x D Therms (A +B)x C x Dx E =Therms If more than 500 therms send to Engineering Remarks: t/e/k-ok C2O 4pfl-’-Z1 10’ Pi ‘-‘-i g -/t Submitted By: DivisIon Operations Manager Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Report No.77 Leak Order No.7)5’77 Time of Break_____________ Time Under Control_______________ Total Time of Blow i Hrs REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B 1.0.2 (IN 2)B Rated Capacity B l.D.2 C Time of Blow (hr),C Time of Blow C PIpe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)/7)’.L2 D Constant D Constant .004041 E Total Therms * Total Therms Total Therms 0 Pet Therm . Report blowing relief 2”and larger only Report 4’pipe &larger for 2,000 linear Total Cost $ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD....Therms AxBxCxD=Therms (A+B)xCxDxETherms lfmorethan 500thermssendtoEngineering Remarks:/4i %1/tl///.Z 47i?%?’%i(‘291?(}4’/A7/2 I 7i4i Original:Gas Measurement 1st Copy DMsion Numerical File 2nd Copy:Attach to corresponding documents in division Town ((LIflO E;Je<)Division Date Project No._______________Service No9941/74//Pipe Size Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No LI How Long ____________ No.of Customers Locafion /3V AJ 46Y g / Submitted By: Division Operations Manager Form No.IGC 308 (1/06) Town RD-1M £- Project No.57i -ô57 Gas Pressure at Time of Break: Outage:Yes []No ] Location jE(.41r <74 Intermountain Gas Company DIVISION GAS LOSS REPORT __________ Date I —13—13 Service No. ____________ Pipe Size____________________ Normal 3 ‘/)Pull Down __________________ How Long _______________ No.of Customers s2 3J ck’ Report No.(‘jI’J /443 Leak Order No.7)/(d’/ Time of Break (,;3t Time Under Control Total Time of Blow /Hrs / RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure .3 S)A Percent Open A Gauge Pressure B l.D.2 2)•B Rated Capacity B I.D.2 C Time of Blow (hr)/j t’9 c Time of Blow C Pipe Length fIn 1,000 ft.)D Avg.BTU (TH/MCF))f),D Constant D Constant .004041 E Total Therms q 2..7 * Total Therms Total Therms 0 Per Therm •..14 I ‘d(i;_. Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $3 7 ‘5 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesONoD *AxBxCxD=Therms Ax B x Cx D =Therms (A ÷ B)x Cx Dx E =Therms If more than 500 therms send to Engineering Remarks:R4 5fIik)4i)4 +i41 74l4(/ t4%ct y 1\rf i .1 I Original:Gas Measurement let Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By:411 LJL7 Division Operations Manager ---,/ Form No.ICC 308 f1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town (fte,dAJ’Division [,J.Qt2 j-.tcy Date /(/1 3 Report No.(t50 -/7c? Project No.__________________Service No.(i 3 Pipe Size 3iS,‘S Leak Order No. _________________ Gas Pressure at lime of Break:Normal 5’Pull Down ______________________ Time of Break 9,cp c1., Outage:Yes Q No How Long 7 No.of Customers lime Under Control ij:j— Location I LD -/YY\.D.LA-A.tLt.C4.A-l Total lime of Blow o?.L/I Hrs REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure_______________________Avg.Atmospheric Pressure A Guage Pressure 35 A Percent Open A Gauge Pressure B I.D.2 (IN 2)0 .(p B Rated Capacity B l.D.2 C Time of Blow (hr)2 . 3h c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)1 Q.73 D Constant D Constant .004041 E Total Therms (* Total Therms Total Therms 0 Per Therm &.q i 3 Ii Report blowing relief 2 and larger only Report 4”pipe &larger for 2,000 linear Total Cost $ci(,%z H. feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNo *AxBxCxD=Therms AxBxCxD=Therms (A÷B)xCxDxE=Therms lfmorethan500thermssendtoEngineehng Remarks:(1’O L)s (LL +0 5 -c [r h.cL.6 - r2 Original:Gas Measurement Submitted By:7 1st Copy:Division Numerical File 2nd Copy Attach to corresponding documents in division Division Operations Manager_______________________ Form No.ICC 308 (1/06) ntermountain Gas Company DIVISION GAS LOSS REPORT Town /3 0 I DMsion __________ Date /-/6 -/3 Project No._______________Service No./!/95 /2 Pipe Size Vi “ Gas Pressure at Time of Break:Normal Pull Down Outage:Yes E No How Long 3 )tc 7 ‘1l.No.of Customers ______________ Location &X’IJF,d Ip h /9’. Report No.t/.i ‘737 Leak Order No. __________________ Time of Break //5t ,ri Time Under Control 3 Total Time of Blow 3./2 Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B 1.0.2 fIN 2)6 7 ‘1 Rated Capacity B 1.0.2 C Time of Blow (hr)3 “c lime of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU fTH/MCF)10.73 D Constant D Constant .004041 E Total Therms 1 (,pL.* Total Therms Total Therms Per Therm i//f / Report blowing relief 2”and larger only Report 4 pipe &larger for 2,000 linear Total Cost $L_4 ).f 0 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesDNoU *AXBXCXD=ThermS Ax B x C x D =Therms (A +B)x C x D x E Therms If more than 500 therms send to Engineering Remarks:“i/o k C-13%,4DTE-s2,339 ht/t é’tv- —r/7 Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By:j’%l ‘1? Division Operations Manager \ Form No.ICC 308 (1/06) Intermountan Gas Company DIVISION GAS LOSS REPORT ReportNo.L/50_,i7qo Leak Order No. __________________ Time of Break £4 O Time Under Control L’.3 j.m. Total Time of Blow I.7Z H REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B I.D.2 (IN 2)‘s”B Rated Capacity B l.D.2 C Time of Blow (hr)I’‘7 c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)1O 3 D Constant D Constant .004041 E Total Therms 1.(j * Total Therms Total Therms 0 Per Therm ‘I “/L— Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $\j 7 t feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNofl *AxBxCxD=Therms AxBxCxD=Therms (A+B)xCxDxE=Therms If more than 500thermssendto Engineering Remarks:/-1 11 ü I C ,C L.f/f 9 Original:Gas Measurement 1st Copy:DMslon Numerical File 2nd Copy:Attach to corresponding documents in division DMsion Town 0 t S Division ___________ Date - Project No!/25 ?T5 Service No. ___________ Pipe Size “xi /Y Gas Pressure at Time of Break:Normal Pull Down Outage:Yes EEl No How Long I Ht.‘I3 i t)9.No.of Customers Location L/fI Whi snrujirjd teJtttf , Submitted By: Form No.IGC 308 (1/06) lntermountan Gas Company DIVISION GAS LOSS REPORT Report NoL4d /Y7 Leak Order No.— Time of Break 6,i9 /,ifl_? Time Under Control 7,’2 A’/t. Total Time of Blow uk. Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By:- DMsion Operations Manager Town B/’ib’ó’tvision J4///,Q Date Project No.__________________Service No.&t4 pipe Size — Gas Pressure at Time of Break:Normal Pull Down Outage:Yes JJ No How Long ______________ No.of Customers Location 6’9/N 5e%//,,7- j REUEF BLOW GAS LOSS LINE PACK UNE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure L2L5 A Percent Open A Gauge Pressure B 1.0.2 (IN 2)‘é2.5 B Rated CapacIty B 1.0.2 C Time of Blow (hr)/‘9 c Time of Blow C Pipe Length (in 1000 ft.)D Avg.BTU (TH/MCF)/61 .5 D Constant D Constant .004041 E Total Therms 51’’9,C2LfJ * Total Therms Total Therms Per Therm “‘/i i ‘2. Report blowing relief 2”and larger only Report 4”pipe &larger for 2000 linear Total Cost $/f,7,29 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD=Therms AxBxCxDTherms (A÷ B)xCxDxETherms Ifmorethan500thermssendtoEnglneering Remarks: Form No.IGC 308 (1/06) •Town _______________ Project No.__________________ Gas Pressure at Time of Break: Outage:Yes []No Location Intermountain Gas Company DIVISION GAS LOSS REPORT Division O1ZL /_Date :;?t:•2oi Service No. ___________ Pipe Size 4 lt Normal _____________ Pull Down _____________________ How Long ______________ No.of Customers ôg -.M.%- Report No.6O45i Leak Order No. _________________ Time of Break 1 (f W7 Time Under Control f Total Time of Blow Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure %55 A Percent Open A Gauge Pressure B l.D.2 (IN 2)é’7c f B Rated Capacity B l.D.2 C Time of Blow (hr)/7L c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)iô 13 D Constant D Constant .004041 E Total Therms 2-* Total Therms Total Therms Pet Therm 7 L/f I Z Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $7 7 4 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD.Therms Ax B x Cx D =Therms (A +B)x C x Dx E =Therms If mote than 500 therms send to Engineering Remarks: %ppj C’-732- ,L -t’ Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By: ________________________________ Division Operations Manager (12_ Form No.ICC 308 (1106) Intermountain Gas Company DIVISION GAS LOSS REPORT Original:Gas Measurement let Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By: Division Operations Manaó?7’— Town (4U441ICk Division Date c”7”/3 Report No.5(9”1/77 Project No.________________Service No.%%t29 Pipe Size Leak Order No.?€7•s5Y?/ Gas Pressure at Time of Break:Normal .%:3-Pull Down lime of Break Outage:Yes 121 No How Long No.of Customers Time Under Control t2.f..3 /2i_2 Location j4’7gIJ Total Time of Blow______________ (4’9/2ileü ?kQy7 REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Bulid Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2(IN 2)//9J B Rated Capacity B LD.2 C Time of Blow fhr)2/7 c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)/‘c5 D Constant D Constant .004041 E Total Therms c2 Total Therms Total Therms 0 Per Them,Vt ‘/_..., Report blowing relief 2 and larger oniy Report 4”pipe &larger for 2,000 linear Total Cost $4 ‘g feet or mote. Regulator Station No. Customer Name Is customer billed for lost volume? YesUNoU *AxBxCxD.Them,s Ax B x C x D =Therms (A +B)x Cx D x E =Therms If more than 500 therms send to Engineering Remarks: Form No.IGC 308 (1/06) Town QWS DMsIon _______ Project No7L//i1)t,L6 ____________ Gas Pressure at lime of Break: Outage:Yes No [] ____________ Location e Vi t/ Date I /i Report No/Y)Jt 3 _________________ Leak Order NoE72 ________________ Tame of Break %‘/5 /V2-7. _____________ Time Under Confrol p Total lime of Blow ,Hrs Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division ntermountain Gas Company DIVISION GAS LOSS REPORT Service No. ______________ Pipe Size c:::’c Normal _Y)Pull Down ___________________ How Long h t.i No.of Customers / hr Ji/ti (I REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B I.D.2 (IN 2)4/B f-’C7%Rated Capacity B l.D.2 C lime of Blow fhr)cJ C Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU fTH/MCF)/9..6 D Constant D Constant .004041 E Total Therms 5 .i..7 * Total Therms Total Therms Per Therm t74”g/z Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $2—’—f 3.9 L4 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes No *AxBxCxD =Therms Ax B x C x D Therms (A +B)XC X D x E =Therms If more than 500 therms send to Engineering Remarks:G /L t I 51 rIo 1) Submifted By: Division Operations Manager_______________________________ Form No.IGC 308 (1/06) Town Project No.________________ Gas Pressure at Time of Break: Outage:Yes No fl Location JC2 ‘, Intermountain Gas Company DIVISION GAS LOSS REPORT Leak Order No.- Time of Break Time Under Control- Total Time of Blow Original:Gas Measurement let Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Division ______________ Date______________________ Service No.31 £7 1’Lf 5 Pipe Size 3/’q “A Normal ___________ Pull Down__________________ HowLong aHr5.II t’Plifl.No.ofCustomers ___________ Report No.q:)•2 L -céL() 7:op, 2.1?Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B 1.0.2 (IN 2).‘7 5 B Rated Capacity B ID.2 C Time of Blow (hr)2 1 c Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)/O 73 D Constant 0 Constant .004041 E Total Therrns j3O.3 * Total Therms Total Therms 0 Per Therm /“ Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $9 9 9 Z_ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesONo *AxBxCxD.Therms AxBxCxD=Therms (A+B)xCxDxE=Therms lfmorethan500thermssendtoEngineering 3/,,IRemarks:f’-/‘1-10 1f’ 1+DO Z 17t7 Submitted By:__1vli ‘—Lt_4/A,-L.) Division Operations Manager Form No.ICC 308 (1106) Town e4/,bLILI4DIVSlOfl J1/I, Project No.6 %5”—&/c7 Service No. ____________ Gas Pressure at Time of Break:Normal ....7 ? Outage:Yes No Q How Long ______________ Location fle,rna’4<,o /h// Report No.é5o2 1/7F1 Leak Order No.69e2 597 Time of Break /6 ‘J /9 4 Time Under Control //i57),% Total Time of Blow Hrs Intermountain Gas Company DIVISION GAS LOSS REPORT Date ________________________ Pipe Size ‘:;:2”,4 Pull Down _____________________ No.of Customers fr4 RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure______________________Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 2)/f &t’t 0 B Rated Capacity B I.D.2 C Time of Blow fhr)8 c Time of Blow C Pipe Length fIn 1,000 ft.)D Avg.BTU (TH/MCF)/6’..5 Constant D Constant .004041 E Total Therrns Total Therms Total Therms Per Therm ‘Ii ‘/ Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $I (0. feet or mote. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD=Therms AxBxCxD=Therms fAi-B)xCxDxE=Therms Ifmorethan500thermssendtoEngineering Remarks:,j I’/?6k (-i?Hnp-’--j2i f(L.{:C&r Original:Gas Measurement 1st Copy:DMsion Numerical Ale 2nd Copy:Attach to corresponding documents In dIvision SubmItted By: Division Operations / Form No.IGC 308 f1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town C dt I Division ______ Date Zo 2013 3/7 A/?) Project No._________________Service No.-“1 v63 Pipe Size _____________________ Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No How Long ______________ No.of Customers ______________ iS0 AUI &4T)k)4 2AJ diIJe/J 0 Report No.________ Leak Order No. _______________ Time of Break (0 5 Time Under Control J I ‘.I EE Total]imeofBlofl’lLfl irs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B ID.2 (IN 2)6,B Rated Capacity B I.D.2 C Time of Blow (hr)1.3 33 .C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU fTH/MCF)D Constant D Constant .004041 E Total Therms /L//.qq * Total Therms Total Therms Per Therm O.%/‘ Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $,.c.37 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesQNo *AxBxCxD...Therms Ax B x C x D =Therms (A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks: Original:Gas Measurement 1 st Copy:DMslon Numerical File 2nd Copy:Attach to corresponding documents In dMslon Submitted By: DMslon Operations Manager_____________________________________ Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Division Sfr/iii Date 2?c%/3 Report No%f&’//7 Project No.________________Service No.%%.f’6/Pipe Size .44/,V Leak Order No.‘e?7 Gas Pressure at Time of Break:Normal Pull Down Time of Break /1 r$9 , Outage:Yes []No [=1 How Long No.of Customers Time Under Control Location V7 Q 5’//72t2 P,1 .-%Total Time of Blow ]%&Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure .5.5 A Percent Open A Gauge Pressure B I.D.2 (IN 2)B Rated Capacity B l.D.2 C Time of Blow (hr)I’)&€)c Time of Blow C Pipe Length (In 1.000 ft.)D Avg.BTU (TH/MCF),‘c2 i,5 D Constant D Constant .004041 E Total Therms 7’2 a31It * Total Therms Total Therms 0 Per Therm ‘/6’! Report blowing relief 2 and larger only Report 4”pipe &larger for 2,000 linear Total Cost $/%2’,4’ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes El No El *A x B x C x D =Therms Ax B x Cx D =Therms (A +B)x Cx Dx E =Therms If more than 500 therms send to Engineering Remarks: Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By: Division Operations Manage% e%dJ 42a L2Ih/ Form No.ICC 308 (1/06) ntermountain Gas Company DIVISION GAS LOSS REPORT Town _____________ DMsion fr7Q Date QI 5 Report No.__________ 1Or\Lø)2 27IProjectNo.__________________Service No.tS öL-’’Q’D f/Pipe Size .Leak Order No. _________________ Gas Pressure at Time of Break:Normal Pull Down Time of Break Outage:Yes No How Long _____________ No.of Customers ______________ Time Under Control tO’246’1 Locafion 2 f I I €i(J I fl4 91,‘Yl VQ&.-Total Time of Blow P1iS’)Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure_____________________Avg.Atmospheric Pressure A Guage Pressure ..55 A Percent Open A Gauge Pressure B l.D.2 (IN 2).I q3C B Rated Capacity B l.D.2 C Time of Blow (hr),c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU CH/MCF)Jt 13 D Constant D Constant .004041 E Total Therms 7 O3 * Total Therms Total Therms Per Therm 4’/f/cQ Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD=Therms AxBxCxDTherms (A+B)xCxDxETherms lfmorethan 500thermssendtoEngineering Remarks: Odginal:Gas Measurement Submitred By: ____________________________________ 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in dMslon Division Operations Manager________________________________________ Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Thuideait Project No.__________________ Gas Ptessure at Time of Break: Outage:Yes [El No Location JQ/’j ?3 IL/lu) Division ______________ Date Service No.2o 4 9 I Pipe Size Normal 15 Pull Down How Long c IY i,r7 No.of Customers [c/-f. RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)—B Rated Capacity B I.D.2 C Time of Blow (hr)r 3 &c Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)/0 7 3 D Constant D Constant .004041 E Total Therms /63 6 O * Total Therms Total Therms 0 Per Therm —Y // Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $(/// feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD.Therms Ax B x C x D =Therms (A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks:)4i:,l ‘ Original:Gas Measurement let Ccpy Division Numerical Ale 2nd Copy Attach to corresponding documents in division Submitted By:-4’y]‘-/j Division Operations Manager ReportNo.UI5D I775 Leak Order No. __________________ Time oIBreak aprri. Time Under Control /95 pin Total Time of Blow 3 t’Hrs Form No.IGC 308 (1/06) Town h1j Project No.__________________ Gas Pressure at lime of Break; Outage:Yes []No Location c?A! Intermountain Gas Company DIVISION GAS LOSS REPORT Division /f347)y7 Date______ Service Pipe Size_______ Normal ____________ Pull Down _______ How Long ______________ No.of Customers Report NQ)/ Leak Order No4’)-” Time of Break_____________ lime Under Control______________ Total lime of Blow ,Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)/4’B Rated Capacity B f.D.2 C Time of Blow fhr),l.33 c Time of Blow C Pipe Length (in 1000 ft.)D Avg.BTU (TH/MCF)//2.D D Constant D Constant .004041 E Total Therms /4t gi:93 * Total Therms Total Therms 0 Per Therm , Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNo *AxBxCxD.merms Ax B x Cx D =Therms (A +B)XC X D x E =Therms If more than 500 therms send to Engineering Remarks:/214 a%a’/‘zz%%‘ L1LtJ%r 2,% Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By:/iL4 ,21,1Léd’ Division Operations Manager Form No.IGC 308 (1)06) Intermountain Gas Company DMSION GAS LOSS REPORT Town Uij)1c2V i (.1 e) Project No.7/3 —i2:? Gas Pressure at Time of Break: Outage:Yes [2]No [2] Location Division _________ Date ?/i 2-I t2’ Service No. _____________ Pipe Size _____________________ Normal ____________ Pull Down___________________ How Long _____________ No.of CustomersJeYg2,,( Report No.7)(9- Leak Order No.7Z —2? Time of Break 42 ,41t1’. Time Under Control /%V3 A/1’ Total Time of Blow Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B LD.2 (IN 2) —B Rated Capacity B l.D.2 C Time of Blow (hr)2,9 C Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTh (TH/MCF)—D Constant D Constant .004041 E Total Therms Cf.1 4.* Total Themis Total Therms 0 Per Therm ()44 I a Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $L 7,3 i_I feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesONoU *AxBxCxD=Therms Ax B x C x D =Therms (A +B)xC x D x E =Therms If more than 500 therms send to Engineering Remarks:‘-‘‘‘i” F/D&€2 13 i&r Submitted By: Division Operations Manager________________________ Form No.IGC 308 f1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town k’H tLCk61 Project No.__________________ Gas Pressure at Time of Break: Outage:Yes [J No [] Location Iñ2 1). Division t.fj k-..Q Date 3 ]3 /3 Service No.‘1 ,7 Pipe Size 3/g’i Normal Pull Down ___________________ How Long a 2.z1 rIi No.of Customers flL4&’i2A Report No./SDcI 7? Leak Order No. __________________ 1]meofBreak 22,.55 flTh Ti me Under Control 3 .2,iOpiti Total Time of Blow Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2).7 2 5 B Rated Capacity B I.D.2 C Time of Blow fhr).(/5 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)tV’73 D Constant D Constant .004041 E Total Therms I j/.* Total Therms Total Therms Per Therm 0 c/i I Report blowing relief 2 and larger only Report 4”pipe &larger for 2,000 linear Total Cost $O..‘3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesONoD *AxBxCxDTherms AxBxCxD=Therms fA+B)xCxDxE=Therms Ifmorethan500thermssendto Engineering Remarks:(1 ..I O.Ss 4-0 5/ti”(A.i hui k.._tj. Original:Gas Measurement 1st Copy Division Numerical File 2nd Copy Attach to corresponding documents in division Submitted By:(“J.A41 (.ALLS14 J5.,u—t_. Division Operations Manager______________________ Form No.IGC 308 (1/06) Town Project No.—-1 61 Gas Pressure at lime of Break: Outage:Yes EJ No 121 Locaon Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Division Service No. Normal How Long I Intermountain Gas Company DIVISION GAS LOSS REPORT Date_____ ______________ Pipe Size________ _____________ Pull Down _______ No.of Customers Sce..I LL\mv. Report No.D-a17-9 Leak Order No. _________________ lime of Break I limeUnderControl 3C ivi Total lime of Blow 7 3 ttrs REUEF BLOW GAS LOSS LINE PACK UNE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 56 A Percent Open A Gauge Pressure B l.D.2 fIN 2)q.B Rated Capacity B l.D.2 C lime of Blow (hr)7 3 C lime of Blow C Pipe Length (In 1000 ft.)D Avg.BTU (TH/MCF)10.7 D Constant 0 Constant .004041 E Total Therms 2.>q.* Total Therms Total Therms Per Therm Ly />/ Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $//.3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNo *AxBxCxD...Therms Ax B x C x D =Therms (A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks:-p’o QQe.. /pfr/g J,2CL Zc k// --1-- Submitted By:—1Yi ‘1A ‘ DMsIon Operations Manager____________________ Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Division Project No.tfi3 1 1 3 3 Service No. Gas Pressure at Time of Break:Normal Outage:Yes LI No How Long LocaUon 133 & -tk -/.3Date I I I ______________ Pipe Size 7 6 Pull Down______ a [irs IE)PThfl.No.ofCustomers ReportNo.qQ I75 Leak Order No. __________________ Time of Break tt in Time Under Control ///5 .vti Total Time of Blow 9.5 Hrs Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 5 ‘A Percent Open A Gauge Pressure B l.D.2 fIN 2)/•q B Rated Capacity B I.D.2 C Time of Blow (hr)2.C Time of Blow C Pipe Length (In 1,000 ft.)0 Avg.BTU (TH/MCF)/0 7 3 D Constant D Constant .004041 E Total Therms Z 7 (,* Total Therms Total Therms 0 Per Therm q /‘/ Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $9 5 (i’.L.j ‘ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesENoO *AxBxCxD...Therms Ax B x C x D =Therms (A ÷ B)x Cx D x E =Therms If more than 500 therms send to Engineering Remarks:2 “I .3”i-/a I -m fp o F ,p-L.gq 9.,g5p /Q/7 —Ti1-7fr Submitted By:‘42’7 fQu—c--t_’ Division Operations Manager_____________________ Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town _______________________ Division ______________ Date 3 ‘/ Project No.______________Service No.3 tc9i25 Pipe Size 3/LI’ Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No How Long 31 rum.No.of Customers Location /tnt#i rL I-i /Dr Report No.c/SO /7 Leak Order No. __________________ TimeofBreak ‘F!/Pr19 Time Under Control f 9 O P 1? Total Time of Blow &C Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B ID.2 (IN )7 6 B Rated Capacity B I.D.2 C Time of Blow (hr)It C C Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)/0.7 3 D Constant D Constant .004041 E Total Therms 5 . )3 * Total Therms Total Therms 0 Per Therm ‘1 //Z Report blowing relief 2 and larger only Report 4”pipe &larger for 2,000 linear Total Cost $I &‘.c 7 feet or mote. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD...Therms Ax B xC x D =Therms (A +B)XC X Dx E =Therms It more than 500 therms send to Engineering Remarks:/t “?“H I C. Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding’ documents in division Submifted By: _______________________ Division Operations Mana__?ç) Form No.IGC 308 f1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town J (1(1 tIc)/1/S Division _________ Date -Report No.-/ Project No. ________________ Service No. ____________ Pipe Size_____________________Leak Order No.’7i — Gas Pressure at Time of Break:Normal ______________ Pull Down _______________________ Time of Break /L7 Of2’) /;3i Outage:Yes No How Long No.of Customers Time Under Control 3 9 tjr’7’f Location J 1//A /(%m%1 ?1.Total Time of Blow____________ RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2(IN 2)B Rated Capacity B 1.0.2 C Time of BIow(hr)),c Time of Blow C Pipe Length fin 1000 ft.)D Avg.BTU (TH/MCF)—0 Constant 0 Constant E Total Therrns 9 j 3,f Total Therms Total Therms *Per Therm E4 Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $‘“feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesONoD *AXBXCXD.Therms A x B x C x 0 =Therms *(A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks:M iO/Z1 Z %‘14 cQ’1/XtL&-AD%/?frJ./y // 11,‘1U?%1C-1 I-9 31 _)rykA —‘o’5Yb 37fi-I51 Original:Gas Measurement Submitted By: 1st Copy:Division Numerical File / 2nd Copy:Attach to corresponding documents In division DMsion Operations Manager______________________________________________ Form No.IGC 308 f1)06) Intermountain Gas Company DIVISION GAS LOSS REPORT Date 3O-/3 Service No. ____________ Pipe Size St d Normal 55 Pull Down ___________________ How Long ii ‘4 91,9.No.of Customers _______________ 1 2kti--‘%7u)7J RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure_____________________Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 fIN 2)1/.3 ‘B Rated Capacity B 1.0.2 C Time of Blow (hr)/?6’C lime of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)/0.‘73 D Constant D Constant .004041 E Total Therms It,!z /3 * Total Therms Total Therms 0 Per Therm 1//>/ Report blowing relief 2 and larger only Report 4”pipe &larger for 2,000 linear Total Cost $44 2 3.1 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesLNoU *AxBxCxD.Therms AxBxCxD=Therms (A+B)xCxDxETherms lfmorethan500thermssendtoEngineehng Remarks: fi0D-ILL?—S,ao2 f7o e rv,a = c_t-7sL Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy Attach to corresponding documents In division DivisionTown Project No.Ii Ii 3 Gas Pressure at lime of Break: Outage:Yes [J No Li Location AJ R1 Report No.V6o—217 / Leak Order No. _________________ TimeofBreak__________ Time Under Control M. Total lime of Blow I 0 Hrs Submitted By:—171.c_f4 j-Pj-j Division Operations Manager Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT DMsion (2.p4)k..QTownL(1’UA,.4.cAA)iZL ___________ Date 3 h Ii ‘ Project No.__________________Service No. ______________ Pipe Size 5JL Gas Pressure at Time of Break:Normal 5S Pull Down Outage:Yes No fl How Long L.tfr’-i No.of Customers Location Y—oa-fiA Report No.C15V tlc?1 Leak Order No. __________________ T,meofBreak ):L?IIp)%...l Time Under Control Z-/ TotalTimeofBlow Irs RELIEF BLOW GAS LOSS LINE PACIC LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B 1.0.2(IN 2)0.2-s B Rated Capacity B 1.0.2 C Time of Blow (hr)0 .3 (o 7 c Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)I 0 73 D Constant D Constant .004041 E Total Therms ).c../(* Total Therms Total Therms Per Therm g t I Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $4 3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesflNofl *AxBxCxD=Therms Ax B XC X 0 =Therms (A +B)x Cx Dx E Therms If more than 500 therms send to Engineering Remarks:Q ,c t D.S.dLJV iJq “,il-..5d-L)lCJ CJ i Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By:fj1L kJ4 Division Operations Manager__________________________________ Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT —Division i1lU Date_______________ 9’nt 1/ Service No.L,ODIU Pipe Size__________________ ______________ Pull Down __________________________________________________________ Leak Order No. ______________________________________________ Time of Break 9 SO Pwi ______________ No.of Customers _______________ Time Under Control 3 7O Li (t%F]C2L l)v ,&t2Iotal lime of Blow t’H RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure ,_55 A Percent Open A Gauge Pressure B LD.2 (IN 2)O.t3I?B Rated Capacity B I.D.2 C Time of Blow (hr)ô 6 C lime of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)13 D Constant D Constant .004041 E Total Therms .5_f /5 * Total Therms Total Therms 0 Per Therm ( Report blowing relief 2’and larger only Report 4”pipe &larger for 2000 linear Total Cost $?3. feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNoO *AxBxCxD=Therms Ax B x C x D =Therms (A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks: Original:Gas Measurement 1st Cop Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By: Division Operations Manager Town Yi t Project No.__________________ Gas Pressure at Time of Break: Outage:Yes []No Location Normal How Long Report No.6o-g7 Form No.IGC 308 f1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town atdn ety Project No.__________________ Gas Pressure at Time of Break: Outage:Yes No [] Location r DMsion __________ Date ,3 mR 5—13 Serce No.—‘1c?1 Pipe Size “A Normal 5 Pull Down___________________ How Long 2 t).3 No.of Customers I 3t,th t Report No.L/. Leak Order No. _________________ Timeof Break l1 pjnt TimeUnderControl 3’&5 p.m. TotalTimeofBlow Hrs REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2(IN 2)B Rated Capacity B ID.2 C Time of Blow (hr)•0 c lime of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU CTH/MCF)/D.7 D Constant D Constant .004041 E Total Therms If 7 .3 * Total Therms Total Therms 0 Per Therm 17 /f I Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $4 ¶1 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNoü *AxBxCxD_Therms AxBxCxDmerms (Al-B)xCxDxETherms lfmorethan500thermssendtoEnglneering /1 Ii ii Remarks:/.71 ttük /-ipf2--zz.C--.’t =-ç7 /j _9I 7a’— Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By:—fyj ‘%iJ7q...c1 Division Operations Manager___________________________ Form No.IGC 308 (1/06) Town ______________________ Project No.__________________ ______________ Gas Pressure at Time of Break:Normal Outage:Yes No How Long _____________ Location ..3’Z -ia1%I%i (rI’F.. RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure ,A Percent Open A Gauge Pressure B l.D.(IN 2)•B Rated Capacity B 1.0.2 C Time of Blow (ht)4 5 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)/t1,73 D Constant D Constant .004041 E Total Therms ‘I g * Total Therms Total Therms Per Therm J,/f /2 Report blowing relief 2’and larger only Report 4”pipe &larger for 2,000 linear Total Cost $3 •D 7 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes D N0E *AxBxCxD=Therms AxBxCxD=Therms (A÷B)xCxDxETherms If morethan 500 therms sendto Engineering Remarks:L1T 4P1..F MLL4ET Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in dMsion Intermountain 6as Company DIVISION GAS LOSS REPORT —Division ________ Date 3-%1 3 Ser4ce No.3 R2572 Pipe Size ‘-&‘ ‘ ______________ Pull Down ______________________ No.of Customers ?O M Report No.—J 7 Leak Order No.7g74 lime of Break 2 LI ‘7 Pf’-1 Time Under Control 3 Total lime of Blow , Submitted By:[J LU1 V VV Division Operations Manager________________I Form No.IGC 308 (1/08) Intermountain Gas Company DIVISION GAS LOSS REPORT Town __________________ Division ___________ Date 19 —13 Project No._______________Service No.LI 3 LI 25 Pipe Size 3/4 “A Gas Pressure at Time of Break:Normal Pull Down Outage:Yes JJ No fj How Long ‘/7 mii .No.of Customers Location 5JS tfJAtJo ///I//J}&.’i Report No.t/5_Z.I iT OO Leak Order No. __________________ TimeofBreak J7 TimeUnderControl /L1 p.,, Total Time of Blow .7 j Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B l.D.2 fIN 2)7 2 B Rated Capacity B I.D.2 C Time of Blow (hr)7 ‘c Time of Blow C Pipe Length fin 1,000 ft.)D Avg.BTU (TH/MCF)/0.7 D Constant D Constant .004041 E Total Therms 33 * Total Therms Total Therms 0 Per Therm 9 /8 /Z Report blowing relief 2’and larger only Report 4”pipe &larger for 2,000 linear Total Cost $/3 ‘.OC.. feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesUNoO *AxBxCxD...Therms Ax B x C x D =Therms (A +B)xC x Dx E =Therms If more than 500 therms send to Engineering Remarks:4 S//iti /Qf/1j Original:Gas Measurement 1st Copy Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By:-17’7 ‘1,Q.t,tt7Y Division Operations Manager Form No.ICC 308 (1/06) Town ltttnPa Project No.__________________ Gas Pressure at Time of Break: Outage:Yes Q No Q Location 4)Lf IA) Intermountain Gas Company DIVISION GAS LOSS REPORT Division ____________ Date 119LA 2 S Service No.U q t-he Size Y Normal ______________ Pull Down ______________________ How Long ______________ No.of Customers AVL flñn-C U Report No.36O-q575 Leak Order No. _________________ Time of Break jO Time Under Control IO Lt&Ø.tby) Total lime of Blow t2)Hrs ‘WI RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheri Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B ID.2 (IN 2)‘7?c5 B Rated Capacity B I.D.2 C Time of Blow (hr)C Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)/O ‘Z D Constant D Constant .004041 E Total Therms /3.3b * Total Therms Total Therms 0 Per Therm L/f /,7 Report blowing relief 2”and larger only Report 4 pipe &larger for 2,000 linear Total Cost $ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD=Therms AxBxCx DTherms (A+B)xCxDxE=Therms lfmorethan 500thermssendtoEngineering Remarks: Original:Gas Measurement let Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By:f ¶o Division Operations Manager 77._L_i I Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town J’i Division _______ Date____________ Project No._______________Service NoJ 2’9-%4?Pipe Size 3/4/ Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No How Long /ii—1”No.of Customers / Locaon 4Ii Al Report No.’2-/%7 Leak Order No’7- Time of Break /4 ‘4?41(7, Time Under Control //“i1 A,f/. Total lime of Blow ,/7 Hr RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B LD.2(IN 2).7?‘3 B Rated Capacity B ID.2 C Time of Blow (hr)//‘7 C Time of Blow C Pipe Length (in 1.000 ft.)D Avg.BTU (TH/MCF)//2 D Constant D Constant .004041 E Total Therms ,%4 74’7/* Total Therms Total Therms 0 Per Therm Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $/3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesDNoU *AxBxCxD_Therms Ax B x Cx D =Therms (A +B)x Cx D x E =Therms If more than 500 therms send to Engineering Remarks:/d/’-d%,)///?/q//21& I,/ Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to correspondIng documents in division Submitted By:414/ Division Operations Form No.ICC 308 (1/06) Intermountan Gas Company DIVISION GAS LOSS REPORT mwn fl\.LA.CkA-’G4f Division Ljo-€.fv Date ,3 /I I 13 Project No.______________SeMceNo.9 Pipe Size l/z IL y Gas Pressure at Time of Break:Normal 5 5 Pull Down Outage:Yes [El No How Long ,).()No.of Customers _______________ LoQation U j 0-CO-I.0(1 fliL4CXy Report No.g5o —?1?9 Leak Order No. _________________ TimeofBreak__________ Time Under Control 3 00 Total lime of Blow ,DJ’fliHrs RELIEF BLOW GAS LOSS UNE PACK LINE RUPTURE!PURGE Build Up Pressure_______________________Avg.Atmospheric Pressure A Guage Pressure 5 5 A Percent Open A Gauge Pressure B I.D.2 (IN 2)1%3 B Rated Capacity B ID.2 C Time of Blow (hr)fl.33 c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)1 0 75 o Constant 0 Constant .004041 E Total Therms 3 05 * Total Therms Total Therms Per Therm O IL r s”I.. Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoD *AxBxCxD=Therms AxBxCxDTherms (A+B)xCxDxETherms Ifmorethan500thermssendtoEngineedng Remarks:C9(t Jt)Jc dAL 40 /z /Cit I Originat Gas Measurement 1st Copy:Division Numerical File 2nd Copy.Attach to corresponding documents In division Submitted By:- Division Operations Manager Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town /a 7ofDlvision 5M’/i,Date 2 Project No._______________Service No.t5ioi..7’%ipe Size ,_y Gas Pressure at TIme of Break:Normal Pull Down Outage:Yes EJ No How Long ______________ No.of Customers _______________ Location II/N/dk)ct 37 Report NO4”i/8 Leak Order No.;‘&-c-’5’::9 Time of Break 3/3 S7)4n? Time Under Control ‘%‘5Q Total Time of Blow 7Z fl71,11i Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Ja Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 2 ‘2 A Percent Open A Gauge Pressure B l.D.2 2).?c2 ta_c B Rated Capacity B l.D.2 C Time of Blow (lit)/‘‘‘C Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)/D ..D Constant D Constant .004041 E TotalTherms t%-” Total Therms Total Therms Per Therm %c9/cs Report blowing relief 2’and larger only Report 4”pipe &larger for 2,000 lInear Total Cost $O 7 feet or more. Regulator Station No. Customer Name is customer billed for lost volume?- YesNoD *AxBxCxD.Ther Ax B x Cx D =Therms (A +B)x Cx D x E =Therms If more than 500 therms send to Engineering Remarks:O/d5-7 S&’i//C -t. Submitted By:Za47c Division Operations Manag ‘/ 1 Form No.IGC 308 (1/06) Mor-’.-jcy Original:Gas Measurement 1st Copy:DivisIon Numerical Ale 2nd Copy Attach to corresponding documents In division 1’ Intermountain Gas Company DIVISION GAS LOSS REPORT Town Project No.__________________ Gas Pressure at Time of Break: Outage:Yes Li No Location —Division _____________ Date 5 Ic_’1 IL 3 Service No.9 0 ?Pipe Size /q 1% Normal 5.5 Pull Down ____________________ How Long 5 Y’t’J..r,No.of Customers ______________ Report No.-If 03 Leak Order No. __________________ Time of Break / Time Under Control I O.J2-i TotalrimeofBlow .Sbf”-tf)Hrs RELIEF BLOW GAS LOSS UNE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)Q B Rated Capacity B I.D.2 C Time of Blow (hr)0 (3,c Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)p 2 5 D Constant D Constant .004041 E Total Therms 355 ,IS * Total Therms Total Therms Per Therm g Report blowing relief 2’and larger only Report 4”pipe &larger for 2,000 linear Total Cost $1 g,s I feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesDNoO *AxBxCxD...Therms Ax B xC x D =Therms (A +B)x C x D x E =Therms If mote than 500 therms send to Engineering Remarks:3)q”A I Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By: DMslon Operations Manager Form No.IGC 308 (1/06) Intermountain Gas Company DIViSION GAS LOSS REPORT Town 1JaJt?vra Project No.__________________ Gas Pressure at Time of Break: Outage:Yes []No [] Location Ip/ Report No.35O%577 Leak Order No. _________________ Time of Break 442o Time Under Control 5.io Total Time of Blow I Hrs th stcd b/gj /74O4 Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In divIsion Division Ocih.ea Date_______________ Ij1J V Service No.y.7C !9 I Pipe Size U f Normal _____________ Pull Down _____________________ How Long ______________ No.of Customers S.‘twii Snr-i,to RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 65 A Percent Open A Gauge Pressure B I.D.2 (IN 2)t5.I’?3%’B Rated Capacity B l.D.2 C Time of Blow (hr)C Time of Blow C Pipe Length (in 1000 ft.)D Avg.BTU (TH/MCF)/O 13 D Constant D Constant .004041 E Total Therrns /1 * Total Therms Total Therms 0 Per Therm 1./f Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $1*7 77 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes No *AxBxCxD..Therms AxBxCxDTherms (A+B)xCxDxE=Therms Ifmorethan500thermssendtoEngineenng Remarks: Submitted By:fl Division Operations Manager /__1y_( Form No.IGC 308 f1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town __________________ DMsion ___________ Date t ‘ Project No._______________Service No.fj/-_(,/3 Pipe Size___________________ Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No How Long l37i’14’No.of Customers_____________ Locaon Report No.-t 4L’44 Leak Order No.ff 7%‘J Time of Break 1’//-1p Time Under Control Total Time of Blow •._,? ML:k/ ..d RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D,2 (IN 2)B Rated Capacity B I.D.2 C Time of Blow (hr),5’C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU(TH/MCF)](2 7i D Constant D Constant .004041 E Total Therms t * Total Therms Total Therms 0 Per Therm t 41 ‘ Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $, feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNo *AxBxCxD..merms Ax B x Cx D =Therms (A +B)x Cx Dx E =Therms If more than 500 therms send to Engineering Remarks:J 41çAt 1l </O,i#/4 5”*i6 C1/X/ “T’k Original:Gas Measurement let Copy:Division Numerical File 2nd Copy Attach to corresponding documents In division Division Operations Manager Submitted By: 7 Form No.ICC 308 (1/06) Original:Gas Measurement 1st Copy:DMslon Numerical File 2nd Copy:Attach to corresponding documents in division Intermountain Gas Company DIVISION GAS LOSS REPORT Service No. ______________ Pipe Size ______________________ Normal ____________ Pull Down ___________________ How Long j “2-Hts No.of Customers_____________ rsi 5 +‘+S Cv0 S DivisionTown Project No.2 5-3514 Gas Pressure at Time of Break: Outage:Yes Q No fl Location tflCU_N\Un Date U- ReportNo.’t50 I8’I(Q Leak Order No. _________________ Time of Break 0 p IT) Time Under Control 3 Total Time of Blow L 5 0 Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure______________________Avg.Atmospheric Pressure A Guage Pressure ‘5 A Percent Open A Gauge Pressure B l.D.2f1N 2)3,Ii 7 Y 8 B Rated Capacity B 1.0.2 C Time of Blow (lw)I’C Time of Blow C Pipe Length (in 1.000 ft.)D Avg.BTU (TH/MCF)/p.D Constant D Constant .00404 1 E Total Therms 7 ‘7.L..* Total Therms Total Therms 0 Per Them,/_/,ft Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $P .)0 ‘ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesONoE *AxBxCxD=Therms AxBxCxDTherms (A+B)xCxDxE=Therms lfmorethan500thermssendtoEngineering Remarks:R tr 7)D 95 Q I]?Z.VL (&/7 -ct<. Q Submled By: _________________________ DMon Operations Manager Form No.IGC 30B (1/06) Town (IL14’j Project No.__________________ Gas Pressure at Time of Break: Outage:Yes E]No t] Location Intermountain Gas Company DIVISION GAS LOSS REPORT Division 9tLJII h.&t?Date_______________ Service No.g4o—’ipe Size Normal _____________ Pull Down _____________________ How Long _____________ No.of Customers (QgI M dvk3tivii. Report No.______________ Leak Order No. __________________ Time of Break IOtrJ ,4y Time Under Control j2’ü hi Total Time of Blow Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)O.T25 B Rated Capacity B l.D.2 C Time of Blow (hr)C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (THIMCF)D Constant 0 Constant .004041 E Total Therms * Total Therms Total Therms 0 Per Therm 0.,)Z_‘ Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $Ii .] feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNo *AxBxCxD..merms Ax B x Cx D =Therms (A +B)x Cx Dx E =Therms If more than 500 therms send to Engineering Remarks: (W-‘C1 ‘O €)=/37.S —r1---7 -7 / Original:Gas Measurement let Copr Division Numerical Ffle 2nd Copy:Attach to corresponding documents In division Submitted By: DIvision Operations Manager Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Project No._______________ Gas Pressure at Time of Break: Outage:Yes No Location i —DMsion 5o.J..4D4o-htt._Date Service No.‘s-525 Pipe Size Normal 55 Pull Down _______ How Long No.of Customers 1_.t’I i ReportNo.tLUOtLN5 LeakOrderNo.LtZ-L-j7 4 Time of Break 3 .OO Q’f” lime Under Control bc ?t.qt Total Time of Blow ]Hrs RELIEF BLOW GAS LOSS UNE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 5 A Percent Open A Gauge Pressure B l.D.Z (IN 2)().7 5 B Rated Capacity B I.D.C Time of Blow (hr)C lime of Blow C Pipe Length (In 1000 ft.)D Avg.BTU (TH/MCF)—D Constant D Constant .004041 E Total Therms 2(..p.j * Total Therms Total Therms Per Therm O.-I I f Z. Report blowing relief 2 and larger only Report 4”pipe &larger for 2000 linear Total Cost $5pLf 2_9 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? Yes jJ No “Ax B x C x D =Therms Ax B x Cx D =Therms (A +B)x C x Dx E =Therms If more than 500 therms send to Engineering Remarks: \JQwLcvta q_/c tpO /rafev) TL-77- Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By: Division Operations Manager Form No.IGC 308 (1/06) Report No._________ Leak Order No. _________________ )0 ?%,4#i IIb1 A1 Total Time of Blow 5 ill (k I-irs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B I.D.2 (IN 2).2 B Rated Capacity B I.D.2 C Time of Blow (hr)t S 3 c Time of Blow C Pipe Length (in 1,000 ft.)0 Avg.BTU (TH/MCF)It’‘ff5 D Constant D Constant .004041 E Total Therms * Total Therms Total Therms 0 Per Therm a t/iI/2 Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $/.g,t feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesJNoU *AxBxCxD.merms Ax B x C x D =Therms (A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks: Original:Gas Measurement let Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By: Division Operations Manager &w_/-jj--- Town t ct-I (4r Project No.________________ Gas Pressure at Time of Break: Outage:Yes []No Location Intermountain Gas Company DIVISION GAS LOSS REPORT Division __________ Date %Lol3 AI”7>,A0?7/ Service No.UI t’IU—Pipe Size •t Normal Pull Down How Long ______________ No.of Customers I22 A)t,o sf -i-r Form No.IGC 308 (7/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town q(4j h g Project No.__________________ Gas Pressure at Time of Break: Outage:Yes No Li Location i..4 1 jij,() Division ___________ Date__________________ Service No.(Pipe Size__________________ Normal ,5’S Pull Down ____________________ How Long 1 No.of Customers I / 11 AfI47 Report No.(/)()i’’/d Leak Order No./J 71/73 Time of Break Time Under Control/i,4tl 1 Total Time of Blow .3,çL Hrs ‘J4A )A lv ‘/ REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure ,,,5 J A Percent Open A Gauge Pressure B I.D.2 (IN 2)B Rated Capacity B l.D.2 C Time of Blow (hr)3 /4 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)/0,1 4 D Constant D Constant .004041 E Total Therms * Total Therms Total Therms 0 Per Therm 4 t.j 2_ Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesLNoU *AxBxCxD.The Ax B x C x D =Therms (A +B)x C x D x E =Thorns If more than 500 therms send to Engineering Remarks:3 £t1,L_c4tf Ii v jk c Ot Onginat:Gas Measurement let Copr Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By: Division Operations Manager Form No.IGC 308 (1/06) Town Jt4Jj,t1f%tL Project No.S3 J.s ‘13 Gas Pressure at Time of Break: Outage:Yes []No [J Location (4-AJ V(AJ Intermountain Gas Company DIVISION GAS LOSS REPORT _______________ Division _________ Date t.3 Report No./O)iVlK ________________ Service No. ____________ Pipe Size Leak Order No.—Z1Z Normal ____________ Pull Down____________________Time of Break “itJ j -*1 How Long ______________ No.of Customers Time Under Control 4 Rt %#Pt1 IL..LiA1A/Total ]]me of Blow -r,jcAtts,ZcI’ REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B LD.2 fIN 2)/B Rated Capacity B CD.2 C Time of Blow (hr)I c Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF))i 7 S D Constant D Constant .004041 E Total Therms I Total Therms Total Therms 0 Per Therm s q ) Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $j’3 3 /I feet or more. Regulator Station No. Customer Name Is customer biiled for lost volume? Yes [J No []*Ax B XC X D =Therms AxBxCxDTherms (A+B)xCxDxETherms lfmorethan500thermssendtoEngineering Remarks;i3d f +Ad%’M%C )L Original:Gas Measurement 1st Copy:DMslon Numerical File 2nd Copy:Attach to corresponding documents in division Submlfted By: ________________________________ Division Operations Manager / Form No.IGC 308 f1/06) Inter-mountain Gas Company DIVISION GAS LOSS REPORT Report No4s5 —//2/ Leak Order No.?&—577/ Time of Break J,5t9f&4’? Time Under Control%5 /54 p177, Total Time of Blow fc1/tL.rs Remarks: A B C D 9l9 B /,v’,. lO.6 D 3’* Original:Gas Measurement fat Copy:Division Numerical File 2nd Copy.Attach to corresponding documents in division Submitted By:ZQd Division Operations Town i%7/&i&!t?/sion c5ifY//Date ______ Project No.________________Service No.J&3 Pipe Size Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No How Long ______________ No.of Customers Location %6o rPJ’%P &/J€a/7 ///,2 4’. RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Percent Open _______________________ Rated Capacity _______________________ TIme of Blow ___________________ Constant Total Therms __________________ Report blowing relief 2 and larger only A B C AGuagePressure l.D.2 (IN 2) Time of Blow (hr) Avg.BTU (TH/MCF) Total Therms 0 PerTherm Total Cost $ Regulator Station No. Customer Name Avg.Atmospheric Pressure Gauge Pressure l.D.2 ______ Pipe Length (in 1,000 ft.)D Constant .004041 E Tçtal Therms ________________________ Report 4”pipe &larger for 2,000 linear feet or more. (A+B)xCxDxE=Therms •4//6/ Ff5,9t Is customer billed for lost volume? Yes No Ax B x C x D =Therms *A x B x C x D =Therms If more than 500 therms send to Engineering Form No.IGC 308 f 1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town /1 t’Division ___________ Date -)—y Project No.________________Service No./c1 7’7 L//Pipe Size ‘i A Gas Pressure at Time of Break:Normal 56 Pull Down Outage:Yes No J How Long /t 0 Th ui,No.of Customers Location C L) Report No.]&D—1 P2 O Leak Order No. __________________ TimeofBreak 7;3,),yi_. lime Under Control /D’5D sQ i Total Time of Blow_______________ Original:Gas Measurement fat Copy:Division Numerical File 2nd Cop Attach to corresponding documents In dMslon RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 6 6 A Percent Open A Gauge Pressure B ID.2 (IN 2)7 B Rated Capacity B LD.2 C lime of Blow fhr)I 3 c Time of Blow C Pipe Length fIn 1,000 ft.)D Avg.BTU (TH1MCF)I O,7 3 D Constant D Constant .004041 E Total Therms 3 U 5•7 * Total Therms Total Therms Per Therm .‘7’)‘I c% ji.20 Report blowing relief 2’and larger only Report 4 pipe &larger for 2000 linear Total Cost $1 ‘1 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesONoLl *AxBxCxD=Therms Ax B xC x D =Therms (A +B)x C x D x E =Therms If mote than 500 therms send to Engineering Remarks:s/t Cttt in P )r 19,C $7t1 :t2. (Z../ç 772 -dc 7(t— Submiffed By:p DIvision Operations Manager .\ Form Na.ICC 308 (1/06) Town - Project No.__________________ Gas Pressure at Time of Break: Outage:Yes 121 No 121 Location Intermountain Gas Company DIVISION GAS LOSS REPORT _____ Date________ 9/7 Pipe Size____________________ Pull Down ________________________ No.of Custome _______________ ?&eS?J/D ,c/__ Report No.5-;f%1/‘G2. Leak Order No._c5l%:/ Time of Break c&5 7 /3,97, Time Under Control _________________ Total Time of Blow Hrs Original:Gas Measurement let Copy:Division Numerical File 2nd Copy Attach to corresponding documents In division Submitted By: DMsion Operations ,4f,,i,i/Lvision _______________ Service No. Normal How Long Ii RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B ID.2 (IN 2)•&/5t c76_5 B •Rated Capacity B ID.2 C Time of Blow (hr)7’o?5 c Time of Blow C Pipe Length (in 1000 ft.)D Avg.BTU (TH/MCF)/t2 / Constant D Constant .004041 E Total Therms //,2 Total Therms Total Therms çt Per Therm 477 Report blowing relief 2”and larger only Report 4”pipe &larger for 2000 linear Total Cost $7 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNofl AxBxCxD=Therms AxBxCxDTherms (A÷B)xCxDxETherms lfmorethan500thermssendtoEngineering Remarks: Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT __________ Division OLUhtL Date__________Report No.If5 j _________ Service No. V _______________________________ Pipe Size I Leak Order No. _________________ Normal ____________ Pull Down___________________Time of Break I e21 Psi How Long ______________ No.of Customers _______________ Time Under Control +M I3k I A VQ Total Time of Blow_________ - REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B ID.2 (IN 2)O•/B Rated Capacity B I.D.2 C Time of Blow fhr)Q 7 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)/t 73 D Constant D Constant .004041 E Total Therms ‘‘9.* Total Therms Total Therms 0 Per Therm t5.1’/ Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $‘7/‘2 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNofl *AxBxCxDTherms AxBxCxDTherms (A+B)xCxDxE=Therms lfmorethan500thermssendtoEngineering Remarks: Original:Gas Measurement 1stCopy Division Numerical File 2nd Copy:Attach to corresponding documents in division Town Project No. _________________ Gas Pressure at Time of Break: Outage:Yes No Locatton )2P)Ls iV Submitted By:/‘:;&_L-e__——-— Division OpeUons Manager Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town IA-C) Project No.___________________ Gas Pressure at Time of Break: Outage:Yes No Location 3 flI (P Division _____________ Date 4 I —/.3 ServiceNo. __________ PipeSize 3/ “ Normal ___________ Pull Down __________________ How Long ().No.of Customers 1)liJDnr]lt2 WY] Report No.-Jbt--I ?3 (7 Leak Order No. __________________ Time of Break /“3 Pm lime Under Control ?65 Prr Total Time of Blow /3 HIS Original:Gas Measurement let Copy:DMslon Numerical File 2nd Copy:Attach to cocrespondlng documents in dMsiori Submiffed By: ____________________ RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 6 A Percent Open A Gauge Pressure B ID.2 (IN )B Rated Capacity B l.D.C Time of Blow (hr)1’3 .C Time of Blow C Pipe Length (In 1.000 ft.)D Avg.BTU (TH/MCF)/t2 D Constant D Constant .004041 E Total Therms 3 C I ?* Total Therms Total Therms Per Therm L//J % Report blowing relief 2”and larger only Report 4”pipe &larger for 2,ODO linear Total Cost $I 5.i3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesONoO *AxBxCxD.Therms Ax B XC x D =Therms (A +B)x Cx Dx E =Therms If more than 500 therms send to Engineering j Remarks:7.4//7,)1 DI-i’-i.ceI,Q;Z7.2/Lr ri —) )t /L5 Division OperaHons Manager V.— Form No.ICC 308 (1/06) ntermountain Gas Company DIVISION GAS LOSS REPORT ReportNo.350 ,5c1 Leak Order No. __________________ Time of Break /2 /5 Time Under Control 1 34/p Total Time of Blow . RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)/?3 B Rated Capacity B i.D.2 C:Time of Blow (hr)C Time of Blow C Pipe Length (in 1.000 ft.)D Avg.BTU (TH/MCF)‘3 D Constant D Constant .004041 E Total Therms ?3.4 * Total Therms Total Therms 0 Per Therm /a Report blowing relief 2’and larger only Report 4”pipe &larger for 2,000 linear Total Cost 5 37 ‘/7 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNoLJ *AxBxCxD-Therms AxBxCxD Therms (A+B)xCx DxETherms Ifmorethan 500thermssendto Engineering Remarks:“/c/,a,’itf,-/•//f Original:Gas Measurement 1st Copy:DMsIon Numerical File 2nd Copy Attach to corresponding documents In division Town N/i 2?Dt..)Division OØL1 AQ_-Date 3 -/3 Project No._______________Service No.31./t 7 /37 1 Pipe Size a -V Gas Pressure at Time of Break:Normal Pull Down Outage:Yes LI No LI How Long flVfl.No.of Customers Location I-li /LL11c(. Submitted By: Division Operations Manager Form No.IGC 308 (1/06) %7 //; REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B ID.2(IN 2)-/9c3 B Rated Capacity B I.D.2 C Time of Blow fhr)/%7 C Time of Blow C Pipe Length (in 1.000 ft.)D Avg.BTh fTH/MCF)/1.?‘,5 D Constant D Constant .004041 E Total Therms c3&’/tó * Total Therms Total Therms 0 Per Therm f “(9_I Report blowing relief 2”and larger only Report 4”pipe &larger for 2000 linear Total Cost $024f”6’3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes No El *Ax B xC x D =Therms Ax B x Cx D =Therms (A +B)x Cx Dx E =Therms If more than 500 therms send to Engineering Remarks: Gas Measurement Division Numerical File Attach to rrespondlng documents in dMslon Intermountain Gas Company DIVISION GAS LOSS REPORT Town DivIsion Date________________Report No.d513,,/ Project No._______________Service No./6&’67fpipe Size ,?J/Leak Order No.I42 -5?Y Gas Pressure at Time of Break;Normal Pull Down Time of Break — Outage:Yes No How Long No.of Customers Time Under Control 1 I%I%’/?,ij, Location 2%’1 ..L9%’,7__Total Time of Blow____________ Original: 1st Copy: 2nd Copy: Submitted By: DMslon Operations Manager Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Project No._______________ Gas Pressure at Time of Break: Outage:Yes No U Location Division ____________ Date /5I 3 Service No. ___________ Pipe Size ‘?“Y Normal ____________ Pull Down ___________________ How Long /5 17?in.No.of Customers fl’7(f),ffl77t,7d Report ND.3s-75q Leak Order No. __________________ TimeofBreak /‘65prt Time Under Control /0 p ivt Total Time of Blow 5 HrS RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B l.D.2 fIN 2)/9 3 4r B Rated Capacity B l.D.2 C Time of Blow (hr)2 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTh (TH/MCF)/0.7 3 D Constant 0 Constant .004041 E Total Therms F.6 &* Total Therms Total Therms 0 Per Therm U /?) Report blowing relIef 2°and larger only Report 40 pipe &larger for 2,000 linear Total Cost $1/ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNoU *AxBxCxD...Therms Ax B x Cx D =Therms (A +B)x Cx Dx E =Therms If more than 500 therms send to Engineering Remarks:/L CWi Ii’? Original:Gas Measurement lstCopy Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By:fl’J ‘f&ixi—) Division Operations Manager Form No.ICC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Report No.q30 —2 ygq/ Leak Order No. __________________ lfmeofBreak3o lime Under Control 3 c1O A/i Total Time of Blow p )1A-&-ir RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B .D.2(IN 2) ,B Rated Capacity B I.D.2 C Time of Blow fhr)c lime of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)lO 7,.S D Constant D Constant .004041 E Total Therms 3.5,(cY’* Total Therms Total Therms Per Therm (),C_fftc-i Report blowing relief 2”and larger only Report 4”pipe &larger for 2000 linear Total Cost $/( feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesONoIJ *AxBxCxD_Therms Ax B x C x D =Therms (A ÷ B)x C x D x E =Therms if more than 500 therms send to Engineering Remarks:L2a ipSc 2Lu -t /‘4 t—h Original:Gas Measurement 1st Copy:Division Numerical flle 2nd Copy:Attach to corresponding documents in division Submitted By: Division Operations Manager Town (hA.,L OUV.DMsion ___________ Date Project No.__________________Service No. ______________ Pipe Size ______________________ Gas Pressure at Time of Break:Normal 55 Pull Down Outage:Yes No How Long .5 No.of Customers _______________ Location j 1 Form No.IGC 308 f1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT _______ Date___________ L9 t9 Pipe Size “a’ __________ Pull Down ________________ )1fl j fl No.of Customers Report No.____________ Leak Order No. _________________ TimeofBreak 1O;H TimeUnderControl 10’// Total Time of Blow Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 5 ‘5 A Percent Open A Gauge Pressure B l.D.2 (IN 9 I B Rated Capacity B I.D.2 C Time of Blow (hr)C Time of Blow C Pipe Length (in 1,000 ft.)0 Avg.BTU (H/MCF)/0 D Constant D Constant .004041 E Total Therms .8’6 * Total Therms Total Therms 0 Per Therm -9 /‘/ qcReportblowingrelief2andlargeronlyReport4pipe&larger for 2,000 linear Total Cost $ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?-V YesONo *AxBxCxD...Therms AxBxCxDTherms (A+B)xCxDxE Therms Ifmorethan500thermssendtoEnglneerlng Remarks: II 4;vp Original:Gas Measurement lstCopy DIvision Numerical File 2nd Copy:Attach to corresponding documents In division Town Division Project No._________________Service No. Gas Pressure at Time of Break:Normal Outage:Yes No How Long Location AL tndi Submitted By: V 4 Division OpeUons Manager________________________ Form No.IGC 308 (1106) Intermountain Gas Company DIVISION GAS LOSS REPORT Report NoJ -Jtt2 Leak Order No.‘7; Time of Break -/C 2/%7. Time Under Control 5iô Total Time of Blow / Original:Gas Measurement 1st Copy Division Numerical File 2nd Copy.Attach to corresponding documents in division Town ___________ Division ________ Date )-)‘ Project No. _________________ Service No. _____________ Pipe Size c’? Gas Pressure at Time of Break:Normal Pull Down Outage:Yes JJ No fl How Long No.of Customers Location RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)7,f”)B Rated Capacity B I.D.C Time of Blow fhr)/%3 c Time of Blow C Pipe Length (in 1,000 ft.)0 Avg.BTU (TH/MCF)/?,D Constant D Constant E TotaiTherms 77d1-61 Total Therms *Total Therms *Per Therm . Report biowing relief 2 and larger only Report 4 pipe &larger for 2,000 lInear Total Cost $3 Z C V feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes LINGO *AXBXCXD._Therms *A x B x C x D =Therms *(A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks:(A/LL%’th//Q”14 ,4i74))i L’rJ fl,IL M7 ii :Ja 1)//7 L72t%) lJyi&i Jv/ I0 V L45z 44.s/, ‘.I C C 1C57 175.z ‘/‘g,-10 Submifted By: Division Operations (1 Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town mp a—’ Project No.___________________ Gas Pressure at Time of Break: Outage:Yes [J No El Location Division _____________ Date U —/3 Service No./o/t,?-37 I Pipe Size /q “y Normal Pull Down____________________ How Long ______________ No.of Customers Lüuct tr ReportNo.3’Cl95_ Leak Order No. _________________ lime of Break 3:0 Time Under Control 3 ‘10 Pn’, Total Time of Blow Q 7 Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B LD.2 (IN )‘B Rated Capacity B ID.2 C lime of Blow (hr)T c Time of Blow C Pipe Length fin 1000 ft.)D Avg.BTU (THIMCF)/..73 D Constant D Constant .004041 E Total Therms ‘/ø /O * Total Therms Total Therms 0 Per Therm q I / Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $//‘7 I feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesUNo *AxBxCxD.Therms AxBxCxDTherms fA+B)xCxDxETherms lfmorethan500thermssendtoEngineering Remarks: Original:Gas Measurement lstCopy Division Numerical File 2nd Copy.Attach to corresponding documents In division SubmItted By: DM&on Operations Manager Form No.IGC 308 (1/06) Town __________ Project Service No. Gas Pressure at Time of Break:Normal Outage:Yes []No El Location /?)/-; Intermountain Gas Company DIVISION GAS LOSS REPORT Report N1(X)/( Leak Order No7’)_- lime of Break ,£2?,/ii’Vl. Time Under Control //I21. Total Time of Blow gf5) RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE /PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A PercentOpen A GaugePressure B l.D.2flN 2)B Rated Capacity B l.D.2 C lime of Blow (hr)i C lime of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU fTH/MCF)/9 D Constant D Constant E Total Therms L/Z C I Total Therms *Total Therms *0 Per Therm Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $1 7 5 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YeSElNOO *AXBXCXD..Therms *A x B x C x D =Therms *(A +B)XC X Dx E =Therms If more than 500 therms send to Engineering NtZ,zt/977 114.Z /hr /s z’io —OK R/—C 4—-‘/L—L_. -it, Submlfted By:t’Z’idi7 A2/11zez2 Division ________ Date If ii ______________ Pipe Size L7 ____________ Pull Down How Long ______________ 1 . No.of Customers (I Remarks:4Jjf -iYM OrigInal: 1 St Copy: 2nd Copy: Gas Measurement DMslon Numerical File Attach to corresponding documents in division S ______ Division Operations Manager________________________________________ Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town (13/DMsion ().+t,’y’i Date )—/..)Report No.q50 Project No._________________Service No.79 3 L/Pipe Size 3)q ‘/Leak Order No. Gas Pressure at Time of Break:Normal 55 Pull Down Time of Break 9 ‘5 ‘I&n-i Outage:Yes No []How Long ,t4L).j’iiJ,Th No.of Customers I Time Under Control 9 .J,cA_-, Location I 9 P-y3r9/-e_C’,VtQJ-Total Time of Blow , RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2(IN 2)3 .7 -—.5 B Rated Capacity B ID.2 C Time Of Blow (hr)0 7 33 c Time of Blow C Pipe Length fin 1000 ft.)D Avg.BTU (TH/MCF)j (,73 D Constant D Constant .004041 E Total Therms 5 Cf * Total Therms Total Therms Per Therm 0 Y /1/ Report blowing relief 2’and larger only Report 4•’pipe &larger for 2,000 linear Total Cost $/,3 .( feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesONoU *AxBxCxD=Therms AxBxCxD=Therms (A+B)xCxDxEmerms lfmorethan500thermssendtoEnglneering Remarks:c I J5 oU-p +n 3 /Q--I’fr Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to correspondIng documents in division Submitted By: I,—. 0M Division Operations Manager (‘S Form No.IOC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT 5 J3 II ‘I‘a Y ReportNo.36:—,1,03.. Leak Order No. __________________ lime of Break to :/pF, lime Under Control 0 ThtaiTimeofBlow SO Hrs RELIEF BLOW GAS Loss LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B I.D.2 (IN 2).I 3 6 B Rated Capacity B I.D.2 C lime of Blow (hr)‘6 C lime of Blow C Pipe Length fIn 1,000 ft.)D Avg.BTU fTH/MCF)/L 7 3 D Constant D Constant .004041 E Total Tharms 5 le /3 * Total Therms Total Therms 0 Per Therm ‘1 /8’/ Report blowing relief 2’and larger only Report 4’pipe &larger for 2,000 lInear Total Cost $3.?7 feet or more. Regulator Station No. Customer Name Is customer bIlled for lost volume?- YesNo *AxBxCxD=Therms Ax B x Cx D =Therms (A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks:5/t_ei€t- tI Originat Gas Measurement 1st Copy:DMsloti Numerical File 2nd Copy:Attach to corresponding documents In UMsion Town fli PL4._Division ___________ Date Project No.________________Service No.3s b 7—3?/Pipe Size Gas Pressure at Time of Break:Normal 55 Pull Down — Outage:Yes [21 No How Long 9 m ir.No.of Customers Location 1/5’]to P iv?D t. Submitted By:1’Y1 ‘1j1,t-t_-’ Division Operations Manager Form No.IGC 308 (1/06) Town Project No.___________________ Gas Pressure at Time of Break: Outage:Yes No Location 3 c 17 i] Intermountain Gas Company DIVISION GAS LOSS REPORT DMslon ____________ Date 5-3 / Service No.37I1 ‘I 5 Pipe Size 3/[ Normal ____________ Pull Down ___________________ How Long /p /7j No.of Customers )i )/J 1(i)-vip]Pd Report No.O-/&‘5 7 Leak Order No. _________________ Time of Break 1!.?;3/PilL Time Under Control /U Pin Total Time of Blow q Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 5 A Percent Open A Gauge Pressure B l.D.2 2)7 5 B Rated Capacity B l.D.2 C Time of Blow (hr)“‘13 c Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)/0’7 3 D Constant D Constant .004041 E Total Therms /?3 .‘3 21 * Total Therms Total Therms 0 Per Therm ‘I I I Report blowing relief 2 and larger only Report 4”pipe &larger for 2000 linear Total Cost $7 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD=Therms AxBxCxD=Therms fA+B)xCxDxE=Therms If morethan 500thermssend to Engineering Remarks:S/L (ttt tklttii Original;Gas Measurement 1st Copy Division Numerical File 2nd Copy Attach to correspondIng documents In dIvision Submitted By:1Y)f 7j Division Operations Manager \\ Form No.IGC 308 (1/06) Town 14m fl4CIU Project No.___________________ Gas Pressure at Time of Break: Outage:Yes No Q Location Intermountain Gas Company DIVISION GAS LOSS REPORT —Division 74ryi Date /%t // Service NoL’/29 Pipe Size // Normal 6 Pull Down ______________ How Long No.of Customers Report N%9/%2 Leak Order Time of Break 7/4t6AF1 Time Under Control /c .Oifl Total J]me of Blow , 7/ H,s RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B ID.2 fIN 2)B Rated Capacity B l.D.2 C Time of Blow fhr)i C Time of Blow C Pipe Length (in 1,000 ft.)0 Avg.BTU (TH/MCF)Ji).y D Constant D Constant .004041 E Total Therms c?4’2 * Total Therms Total Therms 0 Per Therm Report blowing relief 2”and larger only Report 4”pIpe &larger for 2,000 lInear Total Cost $/I9, feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD...Therms Ax B x Cx 0 =Therms (A ÷ B)XC X Dx E =Therms If more than 500 therms send to Engineering Remarks:1S%’a/%/%a/’•7’1 2M1/ / Original:Gas Measurement 1st Copy.Division Numerical File 2nd Copy:Attach to corresponding documents in division Submifted By:ik 3,zJL/ DMslon Operations Manager_________________________________________ Form No.IGC 308 f1/06) Town57±A4 Project No.___________________ Gas Pressure at Time of Break: Outage:Yes []No [] Location Intermountan Gas Company DIVISION GAS LOSS REPORT DMsion /7)77 Date 3 Service No.‘1Pipe Size_______________ Normal ____________ Pull Down___________________ How Long ______________ No.of Customers /L)/i- Report No2//,4/ Leak Order No.Q)‘44 Time of Break //4/2’? Time Under Control Total Time of Blow /,b)HIS RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 fIN Z)/9 B Rated Capacity B I.D.2 C lime of Blow fht)f C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)/72 4€9 D Constant D Constant .004041 E Total Therms /.94 2.-5 * Total Therms Total Therms 0 Per Therm Report blowing relief 2”and larger only Report 4”pIpe &larger for 2,000 lInear Total Cost $ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesUNDO *AxBxCxD...Therms AxBxCxDTherms (A+B)xCxDxETherms lfmorethan500thermssendtoEngineedng Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By: Remarks:4}JiW%///7 zZZ’7J /zj9 &rniL Division Operations Manager____________________________ Form No.IGC 308(1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Q’a-l Project No.__________________ Gas Pressure at Time of Break: Outage:Yes No Q Location t tv’ ReportNo.Y ‘C RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B ID.2 (IN 2)1 3 IP B Rated Capacity B l.D.2 C Time of Blow (hr)‘L”‘3 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)/Oi 7 3 D Constant D Constant .004041 E Total Therms ‘7?c * Total Therms Total Therms 0 Per Therm ,‘I I ?I Report blowing relief 2’and larger only Report 4”pipe &larger for 2,000 linear Total Cost $3 .&3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesUNo *AxBxCxDTherms AxBxCxD=Therms (A+B)xCxDxE=Therms Ifmorethan500thermssendtoEnginéedng Remarks:s/c..i%E 6’ Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By: Division Operations Manager —Division ______________ Date Service No.5 Pipe Size____________ Normal ____________ Pull Down ____________ How Long j 1 111 ill.No.of Customers Leak Order No. __________________ Time of Break /€39 4 -t, Time Under Control 1/-’1)c ii-’ Total Time of Blow R’3 Hrs Form No.ICC 308 (1/06) Original:Gas Measurement 1st Copy:DMsion Numerical File 2nd Copy:Attach to corresponding documents In division Report No.6o’-‘5/’ Leak Order No.______________ Time of Break 7/,FI4i2” Time Under Control / Total Time of Blow______________ Intermountain Gas Company DIVISION GAS LOSS REPORT Town /‘f,7’/%‘Divislon 45/44 Date - Project No._________________Service No./9,7Y””Pipe Size Gas Pressure at Time of Break:Normal s.53’Pull Down - Outage:Yes No [J How Long _____________ No.of Customers Location SO hgt2,5 I1/ i’t2”fr’ V REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 2)•‘3 B Rated Capacity B l.D.2 C Time of Blow (hr)-%.i’‘%3 C Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (THIMCF)/-D Constant D Constant .004041 E Total Therms 5p /c/’* Total Therms Total Therms 0 Per Therm /‘.9/ Report blowing relief 2”and larger only Report 4’pipe &larger for 2,000 linear Total Cost $1fo?,c5 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesONo *AxBxCxD=Therms AxBxCxD=Therms (A+B)xCxDxE=Therms Ifmorethan 500thermssendtoEngineering Remarks: Submitted By:-<L21Y2 %t Division Operations Manag ?Qfr_2)1h1ri,v’Y, C /I, Form No.ICC 308 (1/06) Town t DMsion Intermountain Gas Company DMSJON GAS LOSS REPORT RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure____________________Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B I.D.2 (IN 2)/‘7 .?t 5 Rated Capacity B ID.2 C Time of Blow (hr)‘ ‘‘C Time of Blow C Pipe Length (in 1,000 ft.)0 Avg.BTU (TH/MCF)S D Constant D Constant .004041 E Total Therms -/* Total Therms Total Therms 0 Per Therm J /r / Report blowing relief 2 and larger only Report 4”pipe &larger for 2,000 linear Total Cost $3 I.? feet or mote. Regulator Station No. Customer Name Is customer billed for lost volume? YesNo *AxBxCxD.Therms AxBxCxDTherms (A+B)xCxDxE=Therms Ifmorethan 500thermssendtoEngineenng II I’1/( Remarks:“8’//,o le.. Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in dMsion Date 5—-—J3 II II Project No._______________Service No.)6’?b -2 7 I Pipe Size “o?Y Gas Pressure at Time of Break:Normal 56 Pull Down Outage:Yes D No Q How Long L/1 IV7Ii1.No.of Customers Location /,3 NW 2YI-d S1 ReportNo.35O(D5 Leak Order No., Time of Break Time Under Control Total Time of Blow /,•5_v Pm 35 Phi Hrs Submitted By:1”7 Dision Operations Manager_________________________________ Form No.IGC 308 (1)06) Intermountain Gas Company DIVISION GAS LOSS REPORT Report No.35O-ID D 7 Leak Order No. _________________ Timeof Break f :7 p, Time Under Control I 12fr1 Total Time of Blow ,/7 H RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B ID.2 2)/B Rated Capacity B l.D,2 C Time of Blow (hr)/7 C Time of Blow C Pipe Length (in 1000 ft.)D Avg.BTU (TH/MCF)10 7 3 D Constant D Constant .004041 E Total Therms I c7 /* Total Therms Total Thorms 0 Per Therm L//, Report blowing relIef 2’and larger only Report 4”pipe &larger for 2,000 linear Total Cost $? feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes No fl Ax B x Cx D =Therms Ax B xC x D =Therms (A +B)x C x Dx E =Therms If more than 500 therms send to Engineering Remarks:V /..Th S/L Original:Gas Measurement 1st Copy:DMsion Numerical File 2nd Copy:Attach to corresponding documents In division Town I7/tL r DMslon ___________ Date Project No.__________________Service No.1117 —.7 /Pipe Size — Gas Pressure at Time of Break:Normal 5 5 Pull Down Outage:Yes No How Long /7 m ff7 .No.of Customers Locatton /u/L NW I1i (ç7L. 1/Ii7;’Y Submitted By:__-tv1 ‘1 J_’1%”t-’ Division Operations Manager___________ Form No.IGC 308 (1106) Intermountain Gas Company DMSION GAS LOSS REPORT Town 1)1 ce Division ____________ Date 5-13 —1 3 ii,3, Project No._______________Service No.-]5 Pipe Size / Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No Q How Long 3 Q fl ir.No.of Customers _____________ Location O I ,-ç .-e 1- ReportNo.%”S19 ILt Leak Order No. __________________ Time of Break /“/5 P17-) Time Under Control J Y p ni Total Time of Blow RELiEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure______________________Avg.Atmospheric Pressure A Guage Pressure ‘5’5 A Percent Open A Gauge Pressure B ID.2(IN 2)7 ‘5 B Rated Capacity B l.D.2 C Time of Blow fhr)‘C Time of Blow C Pipe Lengthfin 1,000 ft.)D Avg.BTU (TH/MCF)/0.‘7 3 D Constant D Constant .004041 E Total Therms 1 3,/* Total Therms Total Therms 0 Per Therm 7’1 / Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $‘7’ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesflNoO *AxBxCxD=Therms AxBxCxDTherms (A+B)xCxDxETherms lfmorethan500thermssendtoEngineering Remarks:t /1,7 //ti- Original:Gas Measurement 1st Copy:DivisIon Numerical File 2nd Copy Attach to corresponding documents in dMsion Submitted By:—1’)’7 L7 DMslon Operations Manager S Form No.IGC 308 (1/06) Town fJ W Division 4JfTOOT1-t Date 5l Li - Project No._____________Service No.39-5j7 Pipe Size_________________ Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No How Long g Z5 No.of Customers q Location 3O EA-r 4i c- RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure_____________________Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)Z5 B Rated Capacity B l.D.2 C Time of Blow (hr)3 c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)[O ,7 3 D Constant D Constant .004041 E Total Therms I •S * Total Therms Total Therms 0 Per Therm 4 1 ‘I Z Report blowing relief 2”and larger only Report 4”pipe &larger for 2000 linear Total Cost $L4 .]3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNofl *AxBxCxD=Therms Ax B x Cx D =Therms (A +B)x C x Dx E =Therms If more than 500 therms send to Engineering Remarks:L45t \(‘5 (J I I XLJc .J Aô ft PLA.LLb L)ti ir1YY1 lTtN —l-t-Y Original:Gas Measurement 1st Copy:DMsion Numerical File 2nd Copy:Attach to corresponding documents in dMsion Submitted By: _______________________ DMsion Operations Manager_____________ ______________ ntermoUntain Gas Company DIVISION GAS LOSS REPORT Report No.(Ot)-/411 Leak Order No.7L/7 Time of Break ¶A Wi Time Under Control j 14 M Total Time of Blow I 3 -irs Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town ________________ Division 5As-oun-Date 5-21-2Ot3 Project No.______________Service No.O5Z-57 Pipe Size M STE L Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No How Long ______________ No.of Customers Location a 20 E Av E,3è iz M ReportNo.pO—Iz-l5t Leak Order No.(3Q-75I I Time of Break Q’?PM Time Under Control 3 Z PM Total lime of Blow Hr RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure_____________________Avg.Atmospheric Pressure A Guage Pressure 3Q A Percent Open A Gauge Pressure B l.D.2 (IN 2)•5 25 B RatedCapadty B l.D.2 C TimeofBlow(hr)C lime of Blow C Pipe Length (in 7.000 ft.)D Avg.BTU (TH/MCF)I c.7 3 D Constant D Constant .004041 E Total Therms 3 L{J..* Total Therms Total Therms Per Therm •Lj I I 2 Report blowing relief 2’and larger only Report 4’pipe &larger for 2,000 linear Total Cost $I 2...33 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesflNofl *AxBxCxD.Therms AxBxCxD=Therms (A+B)xCxDxE=Therms lfmorethan500thermssendtoEngfneering Remarks:fE 3,1k-i Original:Gas Measurement let Copy Division Numerical File 2nd Copy Attach to corresponding documents In dMsion Submitted By:VEV1 i T)LARM Division Operations Manager________________________________ Form No.IGC 308 f1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT ,‘5-/,—13 /1 ii‘a Y Report No.35C ?/‘1 Leak Order No. __________________ TimeofBreak___________ Time UnderControl /‘‘/‘1 4 Total Time of Blow 7 7 Hrs RELIEF BLOWGAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 fIN 2)•/‘3 B Rated Capacity B ID.2 C Time of Blow (hr)7 ‘7 c lime of Blow C Pipe Length (In 1000 ft.)D Avg.BTU (TH/MCF)/‘‘7 D Constant D Constant .004041 E Total Therms ?‘7’‘7 * Total Therms Total Therms 0 Per Therm ‘>/ Report blowing relief 2’and larger only Report 4”pIpe &larger for 2,000 linear Total Cost $J&-7 ‘ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes fl NoO *AxBxCxDTherms Ax B x Cx D =Therms (A ÷ B)x Cx Dx E =Therms If more than 500 therms send to Engineering Remarks:/a “ffô/1i S/L Original:Gas Measurement 1st Copy.Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By:72’7 ‘-1 Division Operations Manager___________________________ Town 1Thtt7 Division ___________ Date, Project No._______________Service No.3t /-3 Pipe Size Gas Pressure at lime of Break:Normal 56 Pull Down — Outage:Yes No How Long ‘1/I WI Jfl No.of Customers Locaon I LU/I 4/d Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town ({/LhL)€LLS Division tbfr)fl Date___________ Project No. ________________ Service No./)’24/’2/_74</Pipe Size_____________________ Gas Pressure at Time of Break:Normal .3 Z Pull Down Outage:Yes No How Long ______________ No.of Customers Location J7¼!/. Report N!’2 i%?5 Leak Order No.’”5’9 — Time of Break g,1om / Time Under Control j3,c’71 Total lime of Blow_______________ RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B 1.0.2(IN 2),B Rated Capacity B l.D.2 C Time of Blow (hr)C Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)7/2.D Constant D Constant E Total Therms Total Therms *Total Therms *C Per Therm Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $%tD.‘/ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNo *AxBxCxD...Therms *A x B x C x D =Therms *(A +B)x C x D x E =Therms If more than 500 therms send to Engineering Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy Attach to corresponding documents In division Submitted By:J/%//m Division Operations Manager / Remarks:/%2%/4.S4/zJJ 7 4?4f<///p/1 F Form No.IGC 308 (1/06) Town Project No. ___________________ Gas Pressure at Time of Break: Outage:Yes No [ZJ Location \Eck{ Division Service No. Normal How Long (ti Intermountain Gas Company DIVISION GAS LOSS REPORT A B C D Remarks:I ‘IIiiI? A 3.(,’7qg’B .“C ,c1c3 D I(* .j/F/2 43 Lfl 22— DDz 95 31Z7,c ‘I1 -iL £/-,—?ok Original.Gas Measurement 1st Copy.Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By:‘1Y1 Division Operations Manager________________________ ______________ Date V?I73I7 Pipesize “‘1 ____________ Pull Down__________ 5 mfl.No.of Customers ReportNo.3O 9toi7 Leak Order No. _________________ TimeofBreak 0-fl, Time Under Control 1 0 0 ‘yij Total Time of Blow -99 irs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Percent Open _______________________ Rated Capacity _______________________ Time of Blow _____________________ Constant Total Therms ______________________ Report blowing relief 2’and larger only A B 5% C Guage Pressure !.D.2(IN 2) lime of Blow (hr) Avg.BTh (TH!MCF) Total Therms PerTherm Total Cost $ Regulator Station No. Customer Name Avg.Atmospheric Pressure Gauge Pressure I.D.2 ______ Pipe Length (in 1000 ft.)D Constant .004041 E Total Therms _________________________ Report 4”pipe &larger for 2,000 linear feet or more. (A+B)xCxDxETherms Is customer billed for lost volume? Yes No Ax B x C x D =Therms *A x B x Cx D =Therms If more than 500 therms send to Engineering Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Division Project No._________________Service No. Gas Pressure at Time of Break:Normal Outage:Yes [J No Li How Long Location 791 c Vu Date 6-i-i _________ Pipe Size 5.5 Pull Down 3’4 (fl y).No.of Customers 1]I’t y Report No1//L c7, Leak Order No. __________________ TimeofBreak /D’/I Time UnderControl )//5 p n. Total Time of Blow •57 Hrs REUEF BLOW GAS LOSS UNE PACK LINE RUPTURE I PURGE Build Up Pressure_____________________Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)/3 “B Rated Capacity B ID.2 C Time of Blow (hr)57 c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU CTH/MCF)/0 7 3 D Constant D Constant .004041 E Total Therms t”5./* Total Therms Total Therms 0 Per Therm Report blowing relief?and larger only -Report 4”pipe &larger for 2,000 linear Total Cost $7 3 feet or mote. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNoU *AxBxCxDTherms AxBxCxD=Therms (A+B)xCxDxE=Therms lfmorethan500thermssendtoEngineedng Remarks: Original:Gas Measurement 1st Copy:DMslon Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By:1’1 11.-frtt._1 DMsion Operations Manager Form No.IGC 308 (1/06) Town __________ Project No. ___________________ Gas Pressure at lime of Break: Outage:Yes No Location /d1’i&t Intermountain Gas Company DIVISION GAS LOSS REPORT Division ________ Date__________ Service No.20 Pipe Size____________ Normal ____________ Pull Down______________ How Long No.of Customers Report No.’%2 7;q4i Leak Order No.I1 Time of Break 2 Time Under Control //).j3),%4’2. Total Time of Blow , RELIEF BLOW GAS LOSS UNE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)/473x B Rated Capacity B l.D.2 C Time of Blow (hr)•C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (THIMCF)/D Constant D Constant E Total Therms Total Therrns *Total Therms *Pet Therm , Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $7 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? Yes Noü *AxBxCxDThes *A x B x C x D =Therms *(A .i-B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks:/—%-/%LE 7Z44 4i’ Original:Gas Measurement 1st Copy Division Numerical File 2nd Copy Attach to corresponding documents in division T Submifled By:7/ DMslon Opemtions Form No.IGC 308 (1/06) ntermountain Gas Company DIVISION GAS LOSS REPORT Town t_!q t &DMsIon ,1_—)1 c:Project No.--)/—LI i Service No. Gas Pressure at Time of Break:Normal Outage:Yes [J No How Long Location Date_______ ______________ Pipe Size V 55 Pull Down_______ 1 Hr.l9 mill.No.of Customers Dr Report No./)5 Leak Order No. __________________ TimeofBreak 7.4/7 Time Under Control ‘3 5 /J T’fr) TotalTimeof Blow I’?O i-irs Original:Gas Measurement I at Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In dMslon RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B I.D.2 (IN 2)3.7 /?B Rated Capacity B I.D.2 C Time of Blow fhr)I’>C lime of Blow C Pipe Length (In 1.000 ft.)D Avg.BTU (THIMCF)I0 7 3 D Constant D Constant .004041 V E Total Therms 2..2—.Lj ... * Total Therms Total Therms Per Therm J /?I Zi A•I i i (3Reportblowingrelief2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $‘I I I — feet or mote. Regulator Station No. Customer Name Is customer billed for lost volume? YesUNo *AxBxCxD.Therms Ax B XC X D =Therms (A +B)xC x Dx E =Therms If mote than 500 therms send to Engineering Remarks:/lj V DD=O5,(‘325,Q I6i k/ V R/5 ]12%. /L U U Submitted By:‘1Y ‘-1 ,2 DMsion Operations Manager____________________ Form No.IGC 308 (1106) Intermountain Gas Company DIVISION GAS LOSS REPORT Report No.I )7 Leak Order No. _______________ Time of Break c 4/jY Time Under Control /6 .3 Pm TotalTimeofBlow_____________ .RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B l.D.2 (IN 2)7 B Rated Capacity B ID.2 C Time of Blow (hr)9 ‘C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)I ‘7 D Constant D Constant .004041 E Total Therms Z I I * Total Therms Total Therms 0 Per Therm ‘]I >/—‘ 4 Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $— feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YeSUNoL *AxBxCxD...Therms AxBxCxD=Therms fA+5)xCxDxETherms Ifmorethan500thermssendtoEngineerlng Remarks:‘4t //ot(1ø-j -i2-,83 rV Original:Gas Measurement fat Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By:- Division Operations Manager Town J3AE.I DMslon ____________ Date /_riJit1 ,-.4/“Project No._______________Service No.I (1 ‘lIP D Pipe Size_____________ Gas Pressure at Time of Break:Normal 56 Pull Down Outage:Yes No How Long Ikf ?‘Y /1i1 No.of Customers Location 315 (TuiL/k& Form No.ICC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Project No.__________________ Gas Pressure at Time of Break: Outage:Yes No LI Location J 3 i 7-13Division ______________ Date, Service No.‘19-3)7 Pipe Size Normal ____________ Pull Down How Long )Yljn.No.of Customers Ptid t Report No.35 ?‘ Leak Order No. __________________ TimeofBreak Time Under Control 3 /6 Pi’t-’ Total Time of Blow -(I’Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B I.D.2 (IN 2)7 B Rated Capacity B I.D.2 C Time of Blow (hr)t r C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTh (TH!MCF)D Constant D Constant .004041 E Total Therms (2 ‘‘•‘/* Total Therms Total Therms 0 Per Therm L//?/p2.. Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $/a .. feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesflNoO *AXBXCXD.ThermS AxBxCxD=Therms (A+B)xCxDxE=Therms lfmorethan500thermssend to Engineering Remarks:5/L-&.t IAI Original:Gas Measurement 1st Copy:Division Numerical Ffle 2nd Copy:Attach to corresponding documents in division Submitted By:1’Y)A-fItJ Division Operations Manager_________________________________ Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town J3oA’,Q_c) Project No.__________________ Gas Pressure at Time of Break: Outage:Yes [j No Locaon 38a3 t) —Division ____________ Date — / Service No.2cpipe Size ,j? Normal 5’5 Pull Down _______________ How Long (fl//No.of Customers U?t1 Report No.‘/50-.)/2j Leak Order No. __________________ Time of Break______________ Time Under Control /?‘30 pm Total Time of Blow HYS RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B I.D.2f1N 2)./?B Rated Capacity B ID.2 C Time of Blow (hr)t’7 c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)1 D Constant D Constant .004041 E Total Therms 7 ‘7.b * Total Therms Total Therms 0 Per Therm //1 / Report blowing relief 2”and larger only Report 4 pipe &larger for 2,000 linear Total Cost $3 .‘1 £ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesDNoU *AxBXCXD=Therms AxBxCxD =Therms fA+B)xCxDxE=Therms lfmorethan500thermssendtoEnginêering Remarks:S/t e%ct V7 JLLIJr’ Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By:‘—IV)L1a4,I,,&J.t_) Division Operations Manager___________________________ Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town Project No.__________________ Gas Pressure at Time of Break: Outage:Yes []No D Location c’3 Al DMsion ___________ Date hit/oIl 3 Selce No./3)Pipe Size____________________ Normal ____________ Pull Down___________________ How Long I fft Iii 11)In.No.of Customers ReportNo.//(o Leak Order No. _______________ Time of Break I-?.-, Time Under Control ])7 p j- TotatlfmeofBiow /17 Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B I.D.2 (IN 2)./5 B Rated Capacity B P.D.2 C Time of Blow (hr)I 7 C Time of Blow C Pipe Length (in 1000 ft.)D Avg.BTU (THIMCF)/O 7 3 D Constant D Constant .004041 E Total Therms 9 0.3 )* Total Therms Total Therms 0 Per Therm t71 >/ .Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $.P lOG’ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? Yes 1=1 NoLJ *AxBxCxD._Therms Ax B x Cx D =Therms (A +B)x Cx Dx E Therms If more than 500 therms send to Engineering Remarks:‘/1-1-0 I —Ii 823,378. Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents In division Submifted By:1J’i LuJ I Division Operations Manager -—-- Form No.IGC 308 (1/06) Town ____________ Project No.________________ Gas Pressure at Time of Break: Outage:Yes No Q Location ,(3/j’J Report No.qsl) Leak Order No. _________ Time of Break 3 0 Time Under Control 4/.3 j) Total Time of Blow_________________ RELIEF SLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B I.D.2 2)3.ti ‘7 9 ?B Rated Capacity B 1.0.2 C Time of Blow (hr)I’3 c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)I ‘7 3 D Constant D Constant .004041 E Total Therms 7 1 14 J 3,* Total Therms Total Therms 0 Per Therm L71 -/, 12- Report blowing relief 2 and larger only Report 4 pipe &larger for 2000 linear Total Cost $“11 6 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YeSUNoU *AxBxCxD...Therms Ax B x C x D =Therms (A +B)x C x D x E =Therms If more than 500 therms send to Engineering Remarks:LI, DD2..-It :S55 o5iTh7 /tr P_Ic 7LjI->oLç Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By:tAA17 Division Operations Manager_________________________ Intermountain Gas Company DIVISION GAS LOSS REPORT Division Date t7IO/3 Service No. Normal How Long L.11R21..42S Pipe Size______ ___________ Pull Down_______ I Ifr S Thin.No.of Customers / 1r) Form No.IGC 308 (1106) rI<)r)i .ce Intermountain Gas Company DIVISION GAS LOSS REPORT Town _______________________ Division ______________ Date -/7 —) Project No._______________Service No.9 5 Pipe Size “ Gas Pressure at Time of Break:Normal 6 Pull Down Outage:Yes No JJ How Long /f}-,.No.of Customers ______________ LocaUon 9’U 7 1 wt Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division ReportNo.+5i9-/1 c Leak Order No. __________________ Time of Break /‘ Time Under Control /0 5 Total Time of Blow .3 5 HTS RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 5 5 A Percent Open A Gauge Pressure B l.D.2(IN 2)7 B Rated Capacity B l.D.2 C Time of Blow (hr)c Time of Blow C Pipe Length (In 1,000 ft.)D Avg.BTU (TH/MCF)/‘7 3 D Constant D Constant .004041 E Total Therms P1 7 * Total Therms Total Therms 0 Per Therm 171)/% Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $b Y t’ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesflNoU *AxBxcxDmerms AxBxCxDTherms (A+B)xCxDxE=Therms If morethan 500thermssend to Engineering Remarks:5/L 1!ut in h /1 Submitted By: __________________________ Division Operations Manager___________________________k ___ 0FormNo.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town DMslon 5AuSrOM7-I.Date —j7-2ôj3 Project No.________________Service No.57 _K Pipe Size 3/gil Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No [J How Long Y 14 ‘5 No.of Customers 3 Location ,3 1.40 M .i t)1 L4Y’4 i ..j.U Report No.____________ Leak Order No.75J TimeofBreak IO;i’7 AM Time Under Control t 3 AM Total Time of Blow I.27 Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 3 A Percent Open A Gauge Pressure B 1.0.‘(IN 2) .5 2 B Rated Capacity B I.D.’C Time of Blow (hr)1,27 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)7 D Constant D Constant .004041 E Total Therms t7,9 * Total Therms Total Therms 0 Per Therm Report blowing relief 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $c37,/5 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesNoO *AxBxCxD=Therms AxBxCxD=Therms CA+B)xCxDxETherms Ifmorethan500thermssendtoEngineedng Remarks:1T /L)3V1 L..J-jE LjITiC Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division Submitted By: Division Operations Manager kvlk iUM Form No.IGC 308 (1/06) intermountain Gas Company DIVISION GAS LOSS REPORT Town Ala i?71fla.}DMsion Project No._______________SeMce No. Gas Pressure at Time of Break:Normal Outage:Yes No [J How Long Location 4L/j Date_________ I,i3ID-31 I Pipe Size a 5 Pull Down__________________ 3I ifl I fl.No.of Customers ReportNo.30 Leak Order No. __________________ TimeofBreak 3.5L iY) Time Under Control t C)p Total Time of Blow ..7 H RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 6 5 A Percent Open A Gauge Pressure B ID.2 (IN 2).I 3 B Rated CapacIty B l.D.2 C Time of Blow fhr)c 7 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU (TH/MCF)“t 7 3 D Constant D Constant .004041 E Total Therms 5 /L.* Total Therms Total Therms 0 Per Therm Lj //, Report blowing relief 2”and larger only Report 4’pipe &larger for 2,000 linear Total Cost $.2 7’&.3 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNoU *AxBxCxD=Therms .AxBxCxD=Therms (A+B)xCxDxE=Therms lfmorethan500thermssendtoEnglneering Remarks:!‘lt s/L.(1 Li’)HtttP Original:Gas Measurement let Copy Division Numerical File 2nd Copy:Attach to corresponding documents In division Submitted By:‘-IV)L%fl.tYtLt, Division Operations Manager (E’£_46t Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town The 11 (If t1’fl DMsion ___________ Date______ Project No._______________Service No.31p7363’2 I Pipe Size _______ Gas Pressure at Time of Break:Normal 56 Pull Down Outage:Yes fNo fJ How Long 5c7 121/fl-No.of Customers Location I f.11 F Y I I;.f Original:Gas Measurement 1st Copy Division Numerical File 2nd Copy Attach to corresponding documents in division Report No.62— Leak Order No. Time of Break Time Under Control Total Time of Blow /,,7 pm 2ai€Fm Hr REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure A Percent Open A Gauge Pressure B 1.0.2 2)7 ??5 B Rated Capacity B l.D.2 C Time of Blow fhr)‘‘7 c Time of Blow C Pipe Length fin 1000 ft.)D Avg.BTU (TH/MCF)‘i”0 Constant 0 Constant .004041 E Total Therms //7,- * Total Therms Total Therms 0 Per Therm ‘/“2.i Report blowing relief 2’and larger only Report 4”pipe &larger for 2000 linear Total Cost $/q / feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- Yes NoO *AxBxCxD_Therms AxBxCxD=Therms (A+B)xCxDxETherms If morethan500thermssend to Engineering Remarks:Hit 1 P Submied By:(JJJ DMsIon Operations Manager .cT.?( I Form No.ICC 308(1/06) Town LLL Project No._________________ Gas Pressure at Time of Break: Outage:Yes No [] Location L-11/L/?t..— Intermountain Gas Company DMSION GAS LOSS REPORT REUEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.AtiTlospheric Pressure A Guage Pressure .S A Percent Open A Gauge Pressure B 1.0.2 (IN 2)0./9 3(5 B Rated Capacity B I.D.2 C Time of Blow fhr)0333 c Time of Blow C Pipe Length (in 1,000 ft.)0 Avg.BTU (THIMCF)/0 73 D Constant D Constant .004041 E Total Therms 3 3 05 * Total Therms Total Therms 0 Per Therm c.//g’j Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $/5 .9 /feet or more. Regulator Station No. Customer Name Is customer bIlled for lost volume? YesONoO *AXBXCXD_ThermS AxBxCxD=Therms (A+B)xCxDxE=Therms lfmorethan500thermssendtoEngineering Remarks:S 1 OSJ cLc*e 1f fl h Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in division DMslon ____________ Date ReportNo.1o--2Ack3 p Service No.Pipe Size 7 Z’Leak Order No. Normal 55 Pull Down___________________Time of Break L How Long No.of Customers Time Under Control 3 ‘4.jo U Total Time of Blow____________ Submitted By:cAJ Division Operations Manager__________________________ Form No.IGC 308 (1/06) Intermountain Gas Company DiVISION GAS LOSS REPORT (YQA&CIJ-’Ovi. Project No._________________ Gas Pressure at Time of Break: Outage:Yes No Location Division _____________ Date .a L5O Pipe Size 55 Leak Order No. _________________ Time of Break //A.., Time Under Control 1:3 , Total Time of Blow 1 9 ,“ihs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE I PURGE Build Up Pressure______________________Avg.Atmospheric Pressure A Guage Pressure —5S A Percent Open A Gauge Pressure B I.D.2 (IN 2).I 3(.t’B Rated Capacity B ID.2 C Time of Blow (hr)3/7 C Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTh (THIMCF)/(9.3 D Constant D Constant .004041 E Total Therms 31i’* Total Therms Total Therms 0 Per Therm 0 /j 7/ Report blowing relIef 2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $/..5 /L/ feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesNoO *AxBxCxD_Therms AxBxCxD=Therms (A+B)xCxDxETherms Ifmorethan500thermssendtoEngineering Remarks:(Ott S I OJJ o4.1-O L/z-1iy t,l CJ , Original:Gas Measurement let Copy:Division Numerical Ale 2nd Copy:Attach to corresponding documents in division Submitted By: Division Operations Manager cQ) t,-ilt Service No. Normal How Long Vi” Report No./5Q —/54/ Pull Down ________ No.of Customers I Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Report No.(415 b j 9 Leak Order No. __________________ Time of Break It t9 t rvi Time UnderControl ii ‘3_I Total Time of Blow His RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 55 A Percent Open A Gauge Pressure B l.D.2 2)/3 4 B Rated Capacity B l.D.2 C Time of Blow (hr)i I 5 c lime of Blow C Pipe Length (in 1,000 ft.)D Avg.BTU fThIMCF)1 0 7 3 D Constant D Constant .004041 E Total Therms 6///* Total Therms Total Therms 0 Per Therm i ‘-1/&/2 Report blowing relief 2 and larger only Report 4 pipe &larger for 2,000 linear Total Cost $/0 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume? YesflNoO *AXBXCXD..Therms AxBxCxD=Therms (A÷ B)xCxDxETherms lfmorethan 500thermssendtoEngineering Remarks:SI I—Cut (r cA\F Original:Gas Measurement 1st Copy:Division Numerical File 2nd Copy:Attach to corresponding documents in dIvisIon Submitted By: Division Operations Manager Town AOjz.)Division ______________ Date Project No._______________Service No. ___________ Pipe Size Gas Pressure at Time of Break:Normal 5 Pull Down — Outage:Yes No U How Long ‘‘l rvi in.No.of Customers LocaUon 1D (ç\ ia&-ta ‘a”Y Form No.IGC 308 (1/06) Intermountain Gas Company DIVISION GAS LOSS REPORT Town -73p Division ______________ Date______________________ .—II 3/1 Project No.________________Service No.—7 C /Pipe Size /9’A Gas Pressure at Time of Break:Normal Pull Down Outage:Yes No How Long q 0 fYX fl No.of Customers I Location U R0 Ht ii s ReportNo._________ Leak Order No. _________________ Timeof Break /5 Pni Time Under Control__L/;5 p -. Total Time of Blow .Hrs RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 5 A Percent Open A Gauge Pressure B I.D.2 (IN 2),7 B Rated Capacity B l.D.2 C Time of Blow (hr)C Time of Blow C Pipe Length fin 1,000 ft.)D Avg.BTh (TH/MCF)/0’7 3 D Constant D Constant .004041 E Total Therms 5 * Total Therms Total Therms 0 Per Therm //-/ Report blowing relief 2’and larger only Report 4’pipe &larger for 2,000 lInear Total Cost $1 /£7,L/5 feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesONoU *AXBxCxD=Therms AxBxCxDTherms (A+B)xCxDxETherms Ifmorethan500thermssendtoEngineering Remarks: Original:Gas Measurement 1st Copy:DMsIon Numerical Ale 2nd Copy:Attach to correspondIng documents In division Submitted By:- Division Operations Manager Form No.ICC 308 (1/06) Town fl t Project No. ___________________ Gas Pressure at Time of Break: Outage:Yes No LI Locaon Intermountain Gas Company DIVISION GAS LOSS REPORT Division fl Date ‘7t)i 3 /7l’)I A”/OServiceNof/f %,fr//5.9 Pipe Size Normal _____________ Pull Down_______________ How Long No.of Customers /1 AA7 Report No.‘?k2- Leak Order No!79.S Time of Break /2,3/AkI. Time Under Control 7/)4/7 A//. Total Time of Blow 1./,6) RELIEF BLOW GAS LOSS LINE PACK LINE RUPTURE!PURGE /__—Build Up Pressure Avg.Atmospheric Pressure A Guage Pressure 2 A Percent Open A Gauge Pressure B 1.0.2 fIN 2)B Rated Capacity B 1.0.2 C Time of Blow (hr)/./t c Time of Blow C Pipe Length (in 1,000 ft.)D Avg.BTh (TH/MCF)/19.%i2 D Constant 0 Constant E Total Therms Total Therms *Total Therms *C Pet Therm i—7 ‘2Reportblowingrelief2”and larger only Report 4”pipe &larger for 2,000 linear Total Cost $/—, feet or more. Regulator Station No. Customer Name Is customer billed for lost volume?- YesENOLI *AxBxCxD=Therms Ax B x Cx D =Therms *fA ÷ B)x Cx D x E =Therms If more than 500 therms send to Engineering Remarks:bo ,)M ‘ //A’z2L44S A-&’ Original:Gas Measurement let Copy:Division Numerical File 2nd Copy Attach to corresponding documents In division Submthed By:g t%%—4-’ DMsIon Operations Manager___________________________ V Form No.IGC 308 (7/06)