Loading...
HomeMy WebLinkAbout20230518AVU to Staff 3 Attachment 1.pdfStaff_PR_003 Attachment 1 Page 1 of 11 Staff_PR_003 Attachment 1 Page 2 of 11 Staff_PR_003 Attachment 1 Page 3 of 11 Staff_PR_003 Attachment 1 Page 4 of 11 Staff_PR_003 Attachment 1 Page 5 of 11 Staff_PR_003 Attachment 1 Page 6 of 11 Staff_PR_003 Attachment 1 Page 7 of 11 Staff_PR_003 Attachment 1 Page 8 of 11 Staff_PR_003 Attachment 1 Page 9 of 11 FIELD VISIT NOVEMBER 30 THROUGH DECEMBER 1, 2021 NOTES  Kettle Falls Generating Station  2 units, 1 wood‐fired unit in service in 1983, combustion, 1 GE steam turbine and generator 53 mw, and  8 mw gas turbine  Joining EIM, planning on deocoupling units completely to be simple cycle – would leave assets in place in  case they decide to return to combined cycle  Still baseload on wood burning unit  Normal outage schedule – complete outage, every 7 years do a turbine outage  CT outage schedule is hours based  Seeing constraints on gas control – might need $40 million to upgrade gas  Fuel yard replacement project underway, new scales, truck dumpers, processing building – comes online  next year  Just replaced economizer – retube a couple years ago  Controls upgrade on combustion turbine, marks 3 controls on stem system replaced  Replaced mechanical connector – full replacement  New well meter system, replaced denumeralized system  New IRP looking for resources, submitting a bid to increase capacity by 10 mw – would need major  upgrades and a repower – looking at second wood burning unit – can increase truck deliveries by 25%  with the new storage yard  Strict regulations on he wood they burn – don’t allow foreign materials on the wood like glue, paint, etc.  – helps keep the equipment clean and running efficient  Little Falls Hydro Facility  4 units, 45 mw total, around 11‐12 per unit, 1 penstock for each unit  Originally built 1906, all 4 units upgraded in last 4 years, added a few more mws  Not regulated by FERC, regulated by dam safety commission  Upgraded exciters, lube oil system, new governor system, new wicket gates  Havent upgraded headgates recently  Planning on putting in new crane pad and replacing headgates, intake racks withing 5‐6 years for  engineering  All units based on water transfer from Long Lake – run based on where the water is coming in  Different run patterns based on season – more precipitation leads to more run time so no spilling  Staff_PR_003 Attachment 1 Page 10 of 11 Upgrade on controls withing last couple years  Can operate Little Falls from Long Lake, but not vice versa  Long Lake Hydro Generation Facility  4 units, total mw of 84  Units have been pretty much the same since 1915, not upgraded like Little Falls – going through similar  processes to upgrade at Little Falls  Don’t expect to need more mws after upgrade due to licensing agreements and restrictions  Will replace GSU to units when doing upgrades  Want to move switchgear equipment from inside to outside  Nine Mile Hydro Production Plant  4 units, 36 mw capacity, but 29 is the most they have ever gotten  Originally built in 1907  Major upgrades to units – 1 and 2 replaced awhile ago and 3 and 4 were upgraded recently  Headgates are now steel, but basically the same headgates  Governors added to units 1 and 2  No governor system for units 3 or 4  Only max capacity at certain times of year, capacity gain would not be important since they are  restrained by the time of the year    OTHER LOCATIONS VISITED – Industrial Meter Set, M&R Station #20, M&R Station #18, M&R Station  #22, M&R Station #23, Chase Road Gate Station, Corbin Road Gate Station, Spokane Generation Control  Center, Post Street Substation  Staff_PR_003 Attachment 1 Page 11 of 11