Loading...
HomeMy WebLinkAbout20190628Avista to Staff 29 Supplemental.pdflivrsra Avista Corp. 141I East Mission Ave. P.O.Box3727 Spokane, WA 99220-0500 Telephone: 800-727 -917 0 June 27,2019 Idaho Public Utilities Commission 412W. Washington St. Boise, ID 83720-0014 Attn: Diane Hanian Re: Supplement to Third Production Request of Commission Staff in Case No. AVU-G-I8-08 Dear Ms. Hanian, Enclosed is Avista's supplemental response to IPUC Staffs production request in the above referenced docket. Included in this mailing are the original and two paper copies of Avista's response to production request: Staff 29-Supplemental. If you have any questions regarding this filing, please contact me at (509) 495-7839. Sincerely, f\;g;, \-F*nktr lll I\) (JcogrS- 1-:.:\Jcc, ; riJo F*_:ir-r ttty i)-,, AH fft()aa? /o/9"r"r*%rrr" Regulatory Policy Analyst Avista Utilities i aime. maj ure @avi stacorp. com 509.49s.7839 AVISTA CORPORATION RESPONSE TO RE,QUEST FOR INFORMATION JURISDICTION: CASE NO: REQUESTER: TYPE: REQUEST NO.: IDAHO AVU-G-18-08 IPUC Staff Production Request Staff- 29 Supplemental DATE PREPARED: 0612712019WITNESS: N/A RESPONDER: Ryan Finesilver DEPARTMENT: Energy Efficiency TELEPHONE: (509) 49s-4873 REQUEST: When reviewing potential site-specific projects, does the Company typically conduct site visits and take measurements in the course of its review to determine if a project is eligible? If so, please describe how the information is gathered and documented during the site-specific visit. RESPONSE: The Company employs several approaches in order to determine eligibility of potential site-specific projects, however all site specific projects require an initial site visit in order to determine the baseline for the energy savings to be based upon. The information from the customer's site visit is gathered by doing a physical walkthrough of the project site, interviewing the customer on their desired project and asking questions in order to determine relevant factors that would contribute to the project scope. The Company's engineering department then documents the information collected about the project and includes it in the customer's application. As all site specific projects are custom and unique in nature, no technical manual exists to support this request. Each site specif,rc project contains a full project documentation file that consists of calculations, methodology, assumptions, etc. As offered previously, Avista's Energy Efficiency Engineering Staff believe an in-person meeting with Staff to walk through any of our site specific projects and corresponding documentation would be valuable. SUPPLEMENTAL RESPONSE : For clarification of the Company's original response to StafLPR_29, Avista's Standard Operating Procedures require that all site specific projects undergo a "site-specific analysis" to determine the baseline for energy savings to be based on, not an "initial site visit" as stated in the response above. Such analysis can be completed as a billing analysis or other review type, rather than an in-person visit by Avista staff prior to calculating the measure savings. Much of the site visit work performed is done so by trade allies who have been to the site to bid a proposed measure. In the cases of industrial processes, an engineer from another company may complete preliminary work to identify a measure and Avista's engineering group has the option to accept the preliminary work based on the prior history of working with that entity. When a project has an anticipated incentive of $25,000 or greater, a preliminary site visit is required to establish or verify baseline systems. In addition, an on-site installation verification is performed for all site specific projects after the measure is complete.