Loading...
HomeMy WebLinkAbout20190513Staff 22-32 to Avista.pdfMATT HUNTER DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0318 IDAHO BAR NO. 10655 REC EIVED l0l9 HAY l3 PH tr: 23 iDi\l'1.) PiJELIC i.I ILiT] [S CCI,{MISSION Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF AVISTA CORPORATION FOR A DETERMINATION OF 2OI4-201 7 NATURAL GAS ENERGY EFFICIENCY EXPENSES AS PRUDENTLY INCURRED. CASE NO. AVU.G-18-08 THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF TO AVISTA CORPORATION The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Matt Hunter, Deputy Attorney General, request that Avista Corporation (Company) provide the following documents and information as soon as possible, or by MONDAY, JUNE 3,2019, This Production Request is continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules of Procedure must include the name and phone number of the person preparing the document, and the name, location and phone number of the record holder and if different the witness who can sponsor the answer at hearing if need be. Reference IDAPA 31.0t.0r.228. THIRD PRODUCTION REQUEST TO AVISTA ) ) ) ) ) ) ) ) I MAY I3,2OI9 In addition to the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 22: Please provide workpapers showing how the Target Confidence/Precision (C/P) totals were calculated in Table 3-l: Planned Sampling and Evaluation Rigor for Gas Residential Programs (:p.26) and Table 3-2: Planned Sampling and Evaluation Rigor for Gas Nonresidential Programs (p.26) of the 2016-2017 Natural Gas Impact Evaluation. REQUEST NO. 23: Please provide workpapers showing how the Achieved Precision values were calculated in Table 3-3: Achieved Sampling and Confidence/Precision for Gas Residential Programs (p.27) and Table 3-4: Achieved Sampling and Evaluation Rigor for Gas Nonresidential Programs (p.27) of the 2016-2017 Natural Gas Impact Evaluation were calculated. REQUEST NO. 24: Please provide workpapers showing how the Achieved Confidence/ Precision (C/P) values, including the Total, were calculated in Tables 3-3: Achieved Sampling and Confidence/Precision for Gas Residential Programs (p.27), Table 3-4: Achieved Sampling and Evaluation Rigor for Gas Nonresidential Programs (p.27), and 5-2: Residential Program Achieved Evaluation Sample (p.60) of the 2016-2017 Natural Gas Impact Evaluation. REQUEST NO. 25: For this production request, please refer to the MASTER tab of the Avista Commercial Tracking Sheet 051618-lD Gas-for ID.xlsx and cross reference the projects with the application numbers (App no.) in the table below: THIRD PRODUCTION REQUEST TO AVISTA MAY 1,3,20192 App No.Account Measure 73183 Hayden Car Wash SS Appliances 72811 Saint Dominic's Girls School SS Shell 72298 Community I't Bank SS Shell 68077 Rosauers Supermarkets, Inc.ESG SS Cases The Company's process for reviewing potential site-specific projects is summarized on pages 1l and 12 of the Impact Evaluation Report. For each project in the table, please provide a detailed description of the review process including: a. Samples of forms or reports submitted by individuals or organizations for consideration as a site-specific project. b. Procedures and calculations used by the Company in order to estimate the savings of site-specific projects, including samples of the energy analyses/savings estimates generated by Avista's engineers. c. Does the Company typically conduct site visits and take measurements in the course of its investigation? If so, please describe how information is gathered and documented during the site-specific visit. d. The criteria used by the Company to determine whether a proposed site-specific project is viable. e. The Technical Review Top Sheet used to ensure that project documentation is complete. f. A sample Energy Efficiency Evaluation Report with supporting calculations. g. The Payment Top Sheet followed by Staff prior to incentive payment. h. The checklist used to assure that the project has been appropriately documented, tracked, and finalized. REQUEST NO. 26: For each project in the table shown in Request No. 25, please provide workpapers showing how the Simple Payback (Col H), KWH (Col I), THERM (Col J), Incentive Electric (Col K), Incentive Gas (Col L), and Measure Cost (Col N) were calculated. REQUEST NO. 27: Please refer to the MASTER tab of the Avista Commercial Tracking Sheet 050318-ID Gas-for ID.xlsx and cross reference the projects with the application numbers (App no.) in the table below. For each project listed: a. Please explain the discrepancy between the (Col I) computed by the Company and the KWH (BH) computed by Nexant. b. Please explain the steps that the Company has taken to improve its energy savings and cost savings estimates. THIRD PRODUCTION REQUEST TO AVISTA J MAY 13,2019 App No.Account Measure 68077 Rosauers Supermarkets, Inc.ESG SS Cases REQUEST NO. 28: The Company's method for reviewing potential site-specific projects is summarized on pages I I and 12 of the Impact Evaluation Report. Please explain how the results of third-party evaluations, such as those conducted by Nexant, are used to improve this process. REQUEST NO. 29: When reviewing potential site-specific projects, does the Company typically conduct site visits and take measurements in the course of its review to determine if a project is eligible? If so, please describe how the information is gathered and documented during the site-specifi c visit. REQUEST NO. 30: Table 4-4:Energy Smart Grocer Reported Energy Savings by Measure (p.38) states that four Energy Smart Grocer projects were completed in Idaho in2017; however, Table 4-5: Energy Smart Grocer Achieved Sample (p.39) indicates that 12 audits and six on-site inspections were conducted. A footnote under Table 4-6: Energy Smart Grocer Impact Energy Realization Rate Results (p.41) indicates that the audit includes projects in Washington and Idaho jurisdictions. a. Please confirm that the audit described in Table 4-5 (p. 39) was conducted using both Idaho and Washington projects. If not, please explain. b. What was the total population size from which the sample of 12 projects in Table 4-5 was drawn? c. Did the sample population only include projects from2017 or were 2016 projects also included? REQUEST NO. 31: Please provide project documentation for each sampled project listed on page 39 for the Energy Smart Grocer program in Idaho, including invoices, savings calculations, work order forms, equipment specification sheets, and copies of any other project records that may exist. THIRD PRODUCTION REQUEST TO AVISTA 4 MAY t3,2019 REQUEST NO.32: Please provide workpapers showing how the Energy Realization Rate and 80olo precision listed in Table 4-6: Energy Smart Grocer Impact Energy Realization Rate Results of the Natural Gas Impact Evaluation Report were calculated. Dated at Boise, Idaho, this t xt't-day of May 2019 rt Matt Deputy General i :umisc:prodreq/avug I 8. Smhck prod req3 THIRD PRODUCTION REQUEST TO AVISTA 5 MAY t3,2019 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS l3th DAY OF MAY 2019, SERVED THE FOREGOING THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF TO AVISTA CORPORATION, IN CASE NO. AVU-G-18-08, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: LINDA GERVAIS MGR REGULATORY POLICY AVISTA CORPORATTON PO BOX3727 SPoKANE W A 99220-3727 E-MAIL : I i rrda. qervai s/,iDavi stacorp.corn avi staclockcts (g)av i staco rp. co rn DAVID J MEYER VP & CHIEF COUNSEL AVISTA CORPORATION PO BOX3727 SPOKANE W A 99220-3727 E-MAIL: david.meyer(rtrvistacorp.som CERTIFICATE OF SERVICE