Loading...
HomeMy WebLinkAbout20150728AVU to Staff 20 Attachment E.pdfLittle Falls Modernization Project Presented by Brian Vandenburg Staff_PR_020 Attachment E Page 1 of 4 The justification for the Little Falls program is to reduce the forced outages and equipment failures that continued to increase. The next two slides show the forced outages at Little Falls from 2004 through 2011. The following slide shows some of the more recent equipment failures. Avista is fortunate nobody was injured during these equipment failures. Little Falls Program Staff_PR_020 Attachment E Page 2 of 4 Year 2004 2005 2006 2007 2008 2009 2010 2011 Little Falls Forced Outages Hours Lost 23 0 121 13 171 230 926 532 0 100 200 300 400 500 600 700 800 900 1000 Staff_PR_020 Attachment E Page 3 of 4 Generator 3 Failure Oct 2010 Little Falls Failures Generator Breaker and Commentator Failure Jan 2010 Generator Breaker Failure 2006 Staff_PR_020 Attachment E Page 4 of 4