HomeMy WebLinkAbout20150728AVU to Staff 20 Attachment E.pdfLittle Falls Modernization Project
Presented by Brian Vandenburg
Staff_PR_020 Attachment E Page 1 of 4
The justification for the Little Falls program is to reduce the forced outages
and equipment failures that continued to increase. The next two slides show
the forced outages at Little Falls from 2004 through 2011. The following slide
shows some of the more recent equipment failures. Avista is fortunate
nobody was injured during these equipment failures.
Little Falls Program
Staff_PR_020 Attachment E Page 2 of 4
Year
2004
2005
2006
2007
2008
2009
2010
2011
Little Falls Forced Outages
Hours Lost
23
0
121
13
171
230
926
532 0
100
200
300
400
500
600
700
800
900
1000
Staff_PR_020 Attachment E Page 3 of 4
Generator 3 Failure Oct 2010
Little Falls Failures
Generator Breaker and
Commentator Failure Jan 2010 Generator Breaker Failure 2006
Staff_PR_020 Attachment E Page 4 of 4