Loading...
HomeMy WebLinkAbout20121217Staff 137-146 to Avista.pdfKARL T. KLEIN WELDON B. STUTZMAN DEPUTY ATTORNEYS GENERAL IDAHO PUBLIC UTILITIES COMMISSION P0 BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0320/334-0318 IDAHO BAR NOS. 5 156/3283 RE CE U 7412 DEC 1 N I_I I 1. • TLtTi MV1J Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5918 Attorneys for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF AVISTA CORPORATION DBA AVISTA UTILITIES FOR AUTHORITY TO INCREASE ITS RATES AND CHARGES FOR ELECTRIC AND NATURAL GAS SERVICE IN IDAHO. CASE NO. AVU-E-12-08 AVU-G-12-07 EIGHTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO AVISTA CORPORATION The Staff of the Idaho Public Utilities requests that Avista Corporation (Company; Avista) provide the following documents and information as soon as possible, by THURSDAY, JANUARY 3,2013.' This Production Request is to be considered as continuing, and Avista is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question, including supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules of Procedure must include the name and phone number Staff is asking for an expedited response. Please contact Staff's attorneys if you believe an expedited response will be problematic. EIGHTH PRODUCTION REQUEST TO AVISTA 1 DECEMBER 17, 2012 of the person preparing the document, and the name, location and phone number of the record holder and if different the witness who can sponsor the answer at hearing if need be. Reference IDAPA 31.01.01.228. In addition to the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 137: For the following electric rate schedules, please explain why the Company is proposing the revenue increase be spread on a uniform percentage basis to the energy billing components, rather than applying the revenue increase uniformly to all billing components: a.General Service Schedule 11/12 b.Large General Service Schedule 21/22 c.Extra Large General Service 25 d.Clearwater Paper Schedule 25P e.Pumping Service Schedule 31/32 REQUEST NO. 138: On page 21 of Pat Ehrbar's Testimony, Table 6 shows the Company serves one interruptible sales service customer on Schedules 131 or 132. Please provide the number of times this customer has been curtailed over the last four years. As part of your response, please compare the revenue from this customer during the test period to what would have been collected had this customer been on a firm service schedule. REQUEST NO. 139: Please explain how the Company determines the cost of providing service to interruptible customers, particularly given the number, magnitude and duration of interruptions may vary. REQUEST NO. 140: Please explain how the Company allocates the costs of gas distribution mains to the various rate schedules when the installation or expansion is necessary to enhance system reliability or capacity. As part of your response, explain how the costs of distribution mains used for looping are treated differently than other distribution mains of the same diameter. EIGHTH PRODUCTION REQUEST TO AVISTA 2 DECEMBER 17, 2012 REQUEST NO. 141: Please explain how gas distribution mains less than four inches in diameter contribute to the overall reliability and capacity of the system. As part of your response, please explain how Schedule 146 customers might benefit from improved reliability and additional capacity on the distribution system. REQUEST NO. 142: The Company's gas Cost-of-Service study classifies distribution mains into two categories: those less than four inches and those four inches or greater. Please provide the number of distribution mains four inches or greater serving fewer than five customers. As part of your response, please provide the change in revenue requirement for each schedule if the cost of the large distribution mains serving fewer than five customers were directly assigned to the customers served from these mains. REQUEST NO. 143: Page 20 of Pat Ehrbar's testimony describes the purpose of having Schedules 112 and 132. Please provide the number of customers who switched between Schedule 146 and Schedules 112 or 132 during the test period. As part of your response, please provide a detailed explanation of how fixed costs were annualized for the test period to account for customers switching between schedules. REQUEST NO. 144: If the Special Contract revenues and costs are not shown separately in Cost-of-Service, please provide the revenues and costs from providing service to Special Contract customers. If the Special Contract revenues and costs are shown separately, please explain where they can be found. REQUEST NO. 145: Please explain how the costs of the Company's pipeline replacement program are allocated to each jurisdiction. Specifically, describe whether the Company's cost allocation methodology for the program is commensurate with the replacement of Aldyl A piping in each jurisdiction. REQUEST NO. 146: Please provide estimates of Idaho's total construction costs and rate impacts for Avista' s Aldyl-A replacement program under scenarios of 10 years, 15 years, 20 years, and 25 years. Assume the Company's proposed rate of return holding items other than EIGHTH PRODUCTION REQUEST TO AVISTA 3 DECEMBER 17, 2012 program costs constant. Provide the rate impact in dollars per customer, per schedule, per year. Estimate the expected number of Aldyl-A leaks for each year of the program under each scenario. Dated at Boise, Idaho, this I I day of December 2012. 4:2 L) 72. Karl . Klein j) Deputy Attorney General Technical Staff: Matt Elam/137-146 i:umisc:prodreq/avue 1 2.8 avugl 2. 7kkme prod req8 EIGHTH PRODUCTION REQUEST TO AVISTA 4 DECEMBER 17, 2012 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 17TH DAY OF DECEMBER 2012, SERVED THE FOREGOING EIGHTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO AVISTA CORPORATION, IN CASE NOS. AVU-E-12-08 & AVU-G-12-07, BY E-MAILING AND MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: DAVID J MEYER VP & CHIEF COUNSEL AVISTA CORPORATION P0 BOX 3727 SPOKANE WA 99220-3727 E-MAIL: david.meyer@avistacorp.com DEAN J MILLER McDEVITT & MILLER LLP P0 BOX 2564 BOISE ID 83702 E-MAIL: joemcdevitt-miller.com PETER J RICHARDSON GREGORY M ADAMS RICHARDSON & O'LEARY 515 N 27TH STREET BOISE ID 83702 E-mail: peter@richardsonandoleary.com greg,richardsonandoleary.com ELECTRONIC SERVICE ONLY: Howard Ray Clearwater Paper Corporation Howard.Ray@clearwaterpaper.com BRAD M PURDY ATTORNEY AT LAW 2019 N 17TH ST. BOISE ID 83702 E-mail: bmpurdy@hotmail.com KELLY 0 NOR WOOD VP STATE & FED REG AVISTA CORPORATION P0 BOX 3727 SPOKANE WA 99220-3727 E-MAIL: kelly.norwood@avistacorp.com LARRY A CR0 WLEY THE ENERGY STRATEGIES INSTITUTE INC 55495 CLIFFSEDGE AVE BOISE ID 83716 E-MAIL: crowleyla@aol.com DR DON READING 6070 HILL ROAD BOISE ID 83703 E-MAIL: dreading2mindspring.com BENJAMIN J OTTO IDAHO CONSERVATION LEAGUE 710N. 6TH ST BOISE ID 83702 E-mail: boUoidahoconservation.org SNAKE RIVER ALLIANCE BOX 1731 BOISE ID 83701 E-mail: kmil1ersnakerivera1liance.org Jo %I1T/ SECRETARY CERTIFICATE OF SERVICE