Redirects of PTP Service on BPA’s Transmission System.
PacifiCorp, in its energy supply management capacity, and BPA agreed to revise the PTP service
arrangements on BPA’s system that PacifiCorp relies on to serve load in central Oregon. Specifically,
PacifiCorp has revised or entered into a total of 15 PTP service tables under PacifiCorp’s existing
Long-Term Firm PTP Service Agreement with BPA (BPA Contract No. 04TX-11722).1 The revisions
accommodate redirected PTP transmission service that will, upon B2H energization, provide
concurrent transmission rights of (i) 340 MW of firm PTP transmission rights from northern points of
receipt (POR) (McNary, Big Eddy and Garrison) to Ponderosa 230, and (ii) 340 MW of firm PTP
transmission rights from the Summerlake 500 POR to the points of deliver (POD) of Ponderosa 230
and Pilot Butte 230 (see summary table below). The redirected service is conditioned upon B2H
energization.
BPA
Service
Table
MWs
Point of
Receipt
(POR)
Point of
Delivery
(POD)
Expiration Redirect Upon B2H Energization
225 40 Ponderosa500 Ponderosa230 November 1,
2026
PacifiCorp will allow this service
table to expire or will redirect away
from Ponderosa
241 200 BigEddy Buckley500 December 1, 2041 Redirected POD of Ponderoso230,
per new BPA Service Table 255
243 5 Ponderosa500 Ponderosa230 November 1,
2027
PacifiCorp will allow this service
table to expire or will redirect away
from Ponderosa
244 35 Ponderosa500 Ponderosa230 March 1, 2028
PacifiCorp will allow this service
table to expire or will redirect away
from Ponderosa
245 120 Ponderosa500 Ponderosa230 December 1, 2028 Redirected POR of SummerLake500,
per new BPA Service Table 250
246 190 Ponderosa500 PilotButte230 December 1, 2028 Redirected POR of SummerLake500,
per new BPA Service Table 251
247 30 Ponderosa500 PilotButte230 December 1, 2028 Redirected POR of SummerLake500,
per new BPA Service Table 252
248 70 Garrison Buckley500 January 1, 2031 Redirected POD of Ponderoso230,
per new BPA Service Table 253
249 70 McNary Buckley500 October 1, 2029 Redirected POD of Ponderoso230,
per new BPA Service Table 254
1 Specifically, these central Oregon load service-associated BPA PTP service tables are proposed revised tables 225, 241, and
243-249, and proposed new redirected service tables 250-255.