Loading...
HomeMy WebLinkAbout20230512PAC to Staff 18 Attachment 2.pdf Redirects of PTP Service on BPA’s Transmission System. PacifiCorp, in its energy supply management capacity, and BPA agreed to revise the PTP service arrangements on BPA’s system that PacifiCorp relies on to serve load in central Oregon. Specifically, PacifiCorp has revised or entered into a total of 15 PTP service tables under PacifiCorp’s existing Long-Term Firm PTP Service Agreement with BPA (BPA Contract No. 04TX-11722).1 The revisions accommodate redirected PTP transmission service that will, upon B2H energization, provide concurrent transmission rights of (i) 340 MW of firm PTP transmission rights from northern points of receipt (POR) (McNary, Big Eddy and Garrison) to Ponderosa 230, and (ii) 340 MW of firm PTP transmission rights from the Summerlake 500 POR to the points of deliver (POD) of Ponderosa 230 and Pilot Butte 230 (see summary table below). The redirected service is conditioned upon B2H energization. BPA Service Table MWs Point of Receipt (POR) Point of Delivery (POD) Expiration Redirect Upon B2H Energization 225 40 Ponderosa500 Ponderosa230 November 1, 2026 PacifiCorp will allow this service table to expire or will redirect away from Ponderosa 241 200 BigEddy Buckley500 December 1, 2041 Redirected POD of Ponderoso230, per new BPA Service Table 255 243 5 Ponderosa500 Ponderosa230 November 1, 2027 PacifiCorp will allow this service table to expire or will redirect away from Ponderosa 244 35 Ponderosa500 Ponderosa230 March 1, 2028 PacifiCorp will allow this service table to expire or will redirect away from Ponderosa 245 120 Ponderosa500 Ponderosa230 December 1, 2028 Redirected POR of SummerLake500, per new BPA Service Table 250 246 190 Ponderosa500 PilotButte230 December 1, 2028 Redirected POR of SummerLake500, per new BPA Service Table 251 247 30 Ponderosa500 PilotButte230 December 1, 2028 Redirected POR of SummerLake500, per new BPA Service Table 252 248 70 Garrison Buckley500 January 1, 2031 Redirected POD of Ponderoso230, per new BPA Service Table 253 249 70 McNary Buckley500 October 1, 2029 Redirected POD of Ponderoso230, per new BPA Service Table 254 1 Specifically, these central Oregon load service-associated BPA PTP service tables are proposed revised tables 225, 241, and 243-249, and proposed new redirected service tables 250-255.