Loading...
HomeMy WebLinkAbout20221216PAC to Staff 5-6.pdfY ROCKY MOUNTAIN BSIyF#* I{ECEIVED t0?? BIC l6 P]t 2: 3t+ I i'.r.i,..r il f:'U ALIC ,,','i ; :: S,loM[,] ISSION 1407 W North Temple, Suite 330 Salt Lake City, Utah 84116 December 16,2022 Jan Noriyuki Idaho Public Utilities Commission 472W. Washington Boise,ID 83702-5918 ian.noriyuki@ouc.idaho.eov (C) RE ID PAC.E-22-15 IPUC Set 2 (5-6) Please find enclosed Rocky Mountain Power's Responses to IPUC 2d SetData Requests 5-6. Also provided is Attachment IPUC 6. If you have any questions, please feel free to call me at (801)220-2963. Sincerely, --Jsl-J. Ted Weston Manager, Regulation Enclosures PAC-E-22-15 / Rocky Mountain Power December 16,2022 IPUC DataRequest 5 IPUC Data Request 5 Please provide the annual Cost-of-Service amounts (by function) for Schedule Nos. I and 36. Also, please clarifu how the Company associated each functional area in Exhibit No. I as either 'Energy-Related' or 'All Ottrer.' Response to IPUC Data Request 5 Please refer to the work papers supporting the direct testimony of Company witness, Robert M. Meredith, specifically "COS D 2021FINAL @ $8m Increase.xlsx" for the cost of service (COS) study relied upon by the Company which provides COS by function for Residential Schedule 1 and Schedule 36 on tab "Unit Costs-target". Please refer to the work papers supporting Mr. Meredith's direct testimony, specifically "ID Res Rate Modemization Workpaper.xlsx" for the break-out of what *re Company associated with "Energy-Related" and "All Other", specifically tab "Unit Costs-Res Summary". Note: "Energy-Related" costs were those costs functionalized to the Production-Energy and Transmission- Energy functions. "All Other" costs were all other costs than those functionalized to the Production-Energy and Transmission-Energy functions. Recordholder:James Zhang Robert MeredithSponsor: PAC-E-22-15 / Rocky Mountain Power December 16,2022 IPUC Data Request 6 IPUC Data Request 6 Please explain how the kilowatt-hour (kWh) time of use reallocations were determined and the basis used to determine the changes for Exhibit No. 2, Schedule No. 36. Please include all work papers showing the calculations used for ttre reallocations in Excel format with formulas enabled. Response to IPUC Data Request 6 Please refer to the work papers supporting the direct testimony of Company witness, Robert M. Meredith, specifically "ID Res Rate Modernization Workpaper.xlsx" for how the kilowatt-hour (kWh) time of use (TOU) reallocations were determined and the basis used to determine the changes for Exhibit No. 2, Schedule No. 36. Specifically, the estimated relationship between present TOU and proposed TOU for Schedule 36 on tab "Sch36-TOU" in tre work paper is used. Please refer to Attachment IPUC 6 which shows the development of the estimated relationship between present TOU and proposed TOU for Schedule 36. Recordholder:James Zhang Robert MeredithSponsor: