Apnl29,202l
Jan Noriyuki
Dayn Hardie
Idaho Public Utilities Commission
472W. WashingSon
Boise,ID 83702-5918
ian. noriyuki@.puc. idaho. sov (c)
RE ID PAC-E.2I-08
IPUC Set I (1-5)
Please find enclosed Rocky Mountain Power's Responses to IPUC I't Set Data Requests l-5.
Provided via encryption are the Confidential Attachments IPUC I and 3. Confidential
information is provided subject to protected under IDAPA 31.01.01.067 arrd 31.01.01.233, the
Idalro Public Utilities Commission's Rules of Procedure No. 67 - Information Exempt from
Public Review, and further subject to any subsequentNon-Disclosure Agreement (NDA)
executed in this proceeding.
If you have any questions, please feel free to call me at (801) 220-2963
Sincerely,
-Jsl-J. Ted Weston
Manager, Regulation
Enclosures
C.c.: Eric L. Olsen/IIPA elo@echohawk.com
Anthonv Yankel/IPA tonv@vankel.net
ii,
PAC-E-21-08 / Rocky Mountain Power
April29,202l
IPUC Data Request I
IPUC Data Request I
On page 2 of the P4 REC Agreement, the Company states that "P4's share of
RECs allocated to ldaho will be proportional to P4's Idaho load for the Reporting
Year." Under the Company's proposal, what would have been Bayer's allocation
of RECs for each year 2017-2020? Please provide the calculations in Excel
format, with formulas enabled.
Response to IPUC Data Request 1
Please refer to Confidential Attachment IPUC I for a hypothetical estimate of the
renewable energy credits (REC) that P4 Production,LLC eq lBayer
Corporation (Bayer) would have received for 2017 through 2020, if the cunent
proposal in this proceeding had been in place during the above referenced
calendar years.
Confidential information is provided subject to protection under IDAPA
31.01.01.067 and31.01.01.233, the Idaho Public Utilities Commission's Rules of
Procedure No. 67 - Information Exempt from Public Review, and further subject
to any subsequent Non-Disclosure Agreement (NDA) executed in this proceeding.
Recordholder: Zepwe Shahumyan / Ted Weston
Sponsor:To Be Determined
PAC-E-21-08 / Rocky Mountain Power
April29,202l
IPUC Data Request 2
IPUC Data Request 2
Please provide the number of RECs setto be retired for P4 tfi2021.
Response to IPUC Data Request 2
The total amount of P4 Production,LLc (P4) I Bayer Corporation @ayer)
allocated 20il ntfiage year renewable energy credits (REC) to be retired will not
be knownuntil Aptil 2022whenthe total renewablo energy generated rn2CIZl, as
well as final allocation factors, and P4 / Bayer actual load for calendar year 2021
are known.
Recordholder:Irene Heng
To Be DeterminedSponsor:
PAC-E-21-08 / Rocky Mountain Power
Apil29,202l
IPUC Data Request 3
IPUC Data Request 3
Please provide the number of RECs for the Company dedicated to Idaho lrr,2021.
Response to IPUC Data Request 3
Please refer to Confidential Attachment IPUC 3 which provides an estimate of the
number of renewable energy credits (REC) that may be allocated to Idaho in
2021.
Confidential information is provided subject to protection under IDAPA
31.01.01.067 and31.01.01.233, the Idaho Public Utilities Commission's Rules of
Procedure No. 67 - Information Exempt from Public Review, and further subject
to any subsequent Non-Disclosure Agreement (NDA) executed in this proceeding.
Recordholder:Zepvre Shahumyan
To Be DeterminedSponsor:
PAC-E-21-08 / Rocky Mormtain Power
April29,202l
IPUC DataRequest 4
IPUC Data Request 4
Please provide the proposed accounting teafuent for the $15,000 annual payment
from P4 to cover the Company's additional administative burden for
administering the program.
Response to IPUC Date Request 4
The annual pay-ment of $15,000 fiom P4 Production,LL0 (P4) /Bayer
Corporation (Bayer) will be reeorded in retail revenue as a miscellaneous service
chargs.
Recordholder:Doug Young / Jennifer Kahl
To Be DeterminedSponsor:
PAC-E-21-08 / Rocky Mountain Power
April29,202l
IPUC Data Request 5
IPUC Data Request 5
Please provide the confrols the Company will use to ensure that Net Power Costs
will not increase for other customers.
Response to IPUC Data Request 5
Revenue credits from renewable energy credit (REC) sales are not included in net
power costs (NPC), rather, they are part of the Company's revenue requirement
calculation and RECs are tracked in the energy cost adjustment mechanism
(ECAM).
If approved by the Idaho Public Utilities Commission (IPUC), the Company
would split Idaho's system generation (SG) allocation factor between P4
Production,LLc (P4) lBayer Corporation (Bayer), and all other Idaho customers.
In the example included in the work papers, provided with the application,
Idaho's total SG allocation factor was 5.911 I percent, and P4lBayer's SG
allocation factor was I .9443 percent. Based on this example, the Company would
withhold 1.9443 percent of system RECs and not make those available for sale.
All other Idaho customers will continue to be allocated their share of any system
REC sales revenue, as occurs today. The Company would not allocate any REC
revenues to Electric Service Schedule 400 in the cost of service (COS) study or
rate design or in the ECAM. This fteatment would require a separate ECAM rate
for P4lBayer.
All other Idaho customers will continue to be allocated their share of system REC
revenues and will not be impacted by the treatnent of Bayer's share of system
REC.
Recordholder:Ted Weston
Sponsor:To Be Determined