Loading...
HomeMy WebLinkAbout20210928PAC to IIPA 30-31.pdfROCKY MOUNTAIN FOWER i'ii: {l E IVE! tiil Slf ?8 Pffi 12:0k lir 1407 W North Temple, Suite 330 Salt Lake City, Utah 84116 September 28,2021 Eric L. Olsen (lSB# 481l) ECHO HAWK & OLSEN, PLLC 505 Pershing Ave., Ste. 100 P.O. Box 6l 19 Pocatello, Idaho 83205 elo@echohawk.com (C) Anthony Yankel/IIPA tony@vankel.net (C) RE: ID PAC-E-21-07 IIPA Set 7 (30-31) Please find enclosed Rocky Mountain Power's Responses to IIPA 7tr Set Data Requests 30-31. Also provided is Attachment IIPA 31. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, -Js/-J. Ted Weston Manager, Regulation Enclosures C.c.: Jan Noriyuki/IPUC ian.norivuki@puc.idaho.qov (C) Ronald L. Williams/PIIC ron@williamsbradbury.com Bradley G. Mullins/PIIC brmullins@mwanalytics.com Adam Gardner/PIIC A Gardner@,idahoan. com (W) Kyle Williams/PIIC williamsk@bvui.edu (W) Val Steiner/Pl IC val. stei n er@. itafos. com (W) Ben Otto/ICL botto@idahoconservation.ore (C) Randall C. Budge/Bayer randv@racineolson.com (C) Thomas J. Budge/Bayer ti @racineolson.com (WXC) Brian C. Collins/Bayer bco I lin s@con sultbai. com (WXC) Maurice BrubakeriBayer mbrubaker@consultbai.com (C) Kevin Higgins/Bayer khieeins@enereystrat.com (C) Lance KaufmanlB ayer lance @aeg i s i n s i eht. com (C) James R. Smith/Bayer i im. r. smith@ic loud. com (C) Brad Purdy bmpurdy@hotmail.com (C) PAC-E-21-07 / Rocky Mountain Power September 28,2021 IIPA Data Request 30 IIPA Data Request 30 Please provide revenue and expense data in a similar format to the Company's Supplemental Response to StaffRequest 3l for each month between January 2020 andthe most recent month available. The data should include for each month any Type 1, Type 2 and Type 3 adjustnents similar to that were made in Company witness McDougal's Exhibit 40. Simple "Actual" and'Adjusted" data for each account is desired-support or workpapers are not requested at this time. Response to IIPA Data Request 30 The Company assumes the reference above is meant to refer to Supplemental Response to StaffRequest I and not 31. Given that assumption, there is not any additional information available to provide beyond the data provided in Supplemental Response to StaffRequest l. General rate case actual and normalization Type l,2,and3 data is notprepared on a monthly basis. Please refer to the Jurisdictional Allocation Model (JAM) and the Regulatory Adjustnent Model, AAIV| provided with the Company's direct filing where an overview of all adjustments made in this proceeding is reflected. Recordholder:Craig Stelter Steven McDougalSponsor: PAC-E-21-07 / Rocky Mountain Power September 28,2021 IIPA Data Request 3l IIPA Data Request 31 The Company's response to IIPA Request 18 (IIPA 3-18) stated: "Reliability data at a disaggregated level (such as at a service tansformer) is not reasonably comparable over time; as such the Company provides annual circuitlevel data, both including and excluding major events for ttre five years." Please provide the disaggregated data for either the year 2020 or the most recent 12 months available (whichever is easiest). Response to IIPA Data Request 31 Please refer to Attachment IIPA 3l which contains Idaho outages from September 2020 through September 2021. This attachment contains two worksheets. The first lists outage surnmary data for each isolation point (i.e. breaker, fuse, transformer, recloser) which operated in response to the fault event which is the most disaggregated data which the company maintains. The second provides outage details corresponding to the disaggregated data. Recordholder: Heide Caswell Sponsor: Richard Vail