Loading...
HomeMy WebLinkAbout20210910PAC to PIIC 50-52.pdfY ROCKY MOUNTAIN PO\AIER -a,+A-rt'f,r.:_.i:!t !-'tlF l:i"i*L'rl,l-u tiii -!Ii: l0 Plt 12: t+t+ . -., . ,,i...:ll-i,.1 ,' : .,- l,i-:l ' ';ii+*i$$'lCN 1407 W North Temple, Suite 330 Salt Lake City, Utah 84116 September 10,2021 Ronald L. Williams/PIIC ron@)wi I I iamsbradbu ry. com Bradley G. Mullins/PIIC brm u I I ins@.mwanalyt ics. com (C) Adam Gardner/PIIC AGardner@idahoan.com (W) Kyle Williams/PIIC williamsk@bvui.edu (W) Val Steiner/PIIC val.steiner@itafos.com (W) RE: ID PAC-E-21-07 PIIC Set 2 (22-54) Please furd enclosed Rocky Mountain Power's Responses to PIIC 2d Set Data Requests 50-52. The remaining response will be provided separately. Provided via e-mail is Attachment PIIC 52 and provided via encryption and BOX are the Confidential Attachments PIIC 5l and 52. Confidential information is provided subject to protected under IDAPA 31.01.01 .M7 and 31.01.01.233, the ldaho Public Utilities Commission's Rules of Procedure No. 67 - Information Exempt from Public Review, and further subject to any subsequent Non-Disclosure Agreement (NDA) executed in this proceeding. If you have any questions, please feel free to call me at (801)220-2963. Sincerely, -Jsl-J. Ted Weston Manager, Regulation Enclosures C.c.: Jan Noriyuki/IPUC ian.noriyuki@nuc.idaho.eov (C) Eric L. Olsen/IIPA elo@echohau'k.com (C) Anthony Yankel/IIPA tonv@vankel.net (C) Randall C. Budge/Bayer randy@rac ineo I son. com (C) Thomas J. Budge/Bayer tj @rac ineo lson. com (WXC) Brian C. Collins/Bayer bcollins@consultbai.com (WXC) Maurice Brubaker/Bayer mbrubaker@,con su ltba i. com (C) Kevin Higgins/Bayer kh i seins@enereystrat. com (C) Lance Kaufman/Bayer I ance@,aee i sinsi eht. com (C) James R. Smith/Bayer iim.r.smith@icloud.com (C) Brad Purdy bmpurdy(@hotmail.com (C) Ben Otto/ICL botto@idahoconservation.ore (C) PAC-E-21-07 / Rocky Mountain Power September 10,2021 PIIC Data Request 50 PIIC Data Request 50 Please identify the actual in-service date and the actual amount of capital placed into service for each EY 2020 (including Pryor Mountain) project, the associated Ey 2020 Transmission investment, and the repowering investments. Please detail the transfers to plant for each project by month on a system basis. Response to PIIC Data Request 50 The Company clarifies that the reference to the *EY 2020" is intended to be a reference to the term as utilized in the direct testimony of Company witness, Timothy J. Hemstreet, specifically the wind projects collectively referred to as the Energy Vision 2020 Projects, comprising: Repowering Wind Projects - Dunlap, Glenrock I, Glenrock III, High Plains, Leaning Juniper, Marengo [, Marengo II, McFadden Ridge, Rolling Hills, Seven Mile Hill I, and Seven Mile Hill II. New Wind Projects - Cedar Springs II, Ekola Flats and TB Flats. And in addition, Transmission Projects - Aeolus to Jim Bridger Anticline, Q707, andQ7l2. Note: the Pryor Mountain wind projecg and the Foote Creek I repowering wind project were not included in PacifiCorp's EV 2020 project. Based on the foregoing clarification, the Company responds as follows: Please refer to Confidential Attachment PIIC 50 for the listing of the EY 2020 capital projects, including the Pryor Mountain wind project, and the Foote Creek I repowering projects that were not included in EV 2020, when they were placed into service, and transfers to plant in service by month. Confidential information is provided subject to protection under IDAPA 31.01.01 .067 and 31.01.01.233, the Idaho Public Utilities Commission's Rules of Procedure No. 67 - Information Exempt from Public Review, and further subject to the Non-Disclosure Agreement (NDA) executed in this proceeding. Recordholder:Tom Evans / Lori Holland / Tim Hemstreet I Gary Tawwater / Jim Etheridge Sponsor:To Be Determined PAC-E-21-07 / Rocky Mountain Power September 10,2021 PIIC Data Request 5l PIIC Data Request 51 Did the capital costs associated with EV 2020, including the Transmission investment, exceed the caps identified on Page 13 of Order No. 34104 in Case No. PAC-E-17-07.If yes, please identiS, the amount by which the cap was exceeded, including project by project capital cost details. If no, please demonstrate that the cap was not exceeded including project by project capital cost details. Response to PIIC Data Request 5l Yes. As explained in the direct testimony of Company wifiress Joelle R. Steward, the capital costs of the EV 2020 transmission and new wind investments exceeded the cost caps identified in Order No. 34104 in Case No. PAC-E-17-07. Please refer to the cost cap comparison provided as Exhibit No. 2 in the direct filing. Additionally, see Confidential Attachment PIIC 5l for a comparison of the deviations from the cost cap amounts for all EY 2020 transmission, new wind, and the repowering projects (the subject of Case No. PAC-E-17'06). Confidential information is provided subject to protection under IDAPA 31.01.01.067 and 31.01.01.233, the Idaho Public Utilities Commission's Rules of Procedure No. 67 - Information Exempt from Public Review, and further subject to the Non-Disclosure Agreement (NDA) executed in this proceeding. Recordholder: Tom Evans / Lori Holland / Tim Hemstreet I Gary Tawwater Sponsor: Joelle Steward / Tim Hemstreet PAC-E-21-07 / Rocky Mountain Power September 10,2021 PIIC Data Request 52 PtrC Data Request 52 Please provide an unredacted copy of the May 8,2018, Multi-party Settlement Stipulation between the Company and Staffin Case No PAC-E-I7-07. Please also state whether the redactions continue to be confidential, given that the underlying facilities have since been constucted and placed into service. Response to PIIC Data Request 52 Please refer to Attachment PIIC 52 which contains the unredacted copy of the May 8,2018, Multi-party Settlement Stipulation ("Stipulation") between the Company and Staff in Case No PAC-E-I7-07. The redactions in the Stipulation are no longer confidential. Recordholder: Ted Weston Sponsor: To Be Determined