Loading...
HomeMy WebLinkAbout20210903PAC to PIIC Attach 77-3 Addendum 5.pdfPACIFICORP INTERWEST MINING COMPANY DEER CREEK MINE MSHA ID NO. 42-00121 Mill Fork Access #2 Mains Rilda Canyon Portals 1st Right Submains Proposed Bulkheads – Installation and Monitoring Plan Addendum #5 Revised Text, Appendices, Figures, Maps and Tables Addendum Submittal July 14, 2015 Mine Safety and Health Administration, District 9 Deer Creek Mine 42-00121 Bulkhead Application – Addendum #5 July 14, 2015 Page 1 Addendum #5 Revised Text, Appendices, Figures, Maps and Tables Response Plan to Address Concerns Outlined Mine Waste and Geotechnical Engineering Division Letter Dated May 15, 2015 Mill Fork Access #2 Mains, 1st Right Submains Proposed Bulkheads, Rilda Canyon Portal Plugs – Installation and Monitoring Plan was completely revised to address concerns outlined in the MSHA Mine Waste and Geotechnical Engineering Division Letter Dated May 15, 2015. Revisions were made to the following sections: • Text Section • Appendices: o Inclusion of Appendix F  Keystone Mining Service, LLC, Response to MSHA’s 5/15/2015 Letter Regarding Bulkhead Portal Plug Construction Plan o Inclusion of Appendix G  Bulkhead Strata Immersion Test Results • Figures: o Figure 5 (included photos of the installation sites) • Maps: o Inclusion of Map 5 – Deer Creek Mine Post Mill Fork Bulkhead Construction Hydrologic Storage Classification o Inclusion of Map 6 – Deer Creek Mine Water Storage Volume Outby Mill Fork Access #2 X-Cut 62 o Inclusion of Map 7- Deer Creek Mine Closure Sequencing • Tables (re-numbering due to inclusion of tables 2,3 and 8): o Inclusion of Table 2 – Hydrologic Characteristics of the lower Blackhawk Formation and Star Point Sandstone o Inclusion of Table 3 – Rock Strength Data for the lower Blackhawk and Star Point Sandstone o Inclusion of Table 8: Mill Fork Area – Groundwater Storage Capacities 1 | P a g e