Loading...
HomeMy WebLinkAbout20210903PAC to PIIC Attach 77-3 Addendum 3 Changes to Booklet.pdf PACIFICORP ENERGY WEST MINING COMPANY DEER CREEK MINE MSHA ID NO. 42-00121 Mill Fork Access #2 Mains Rilda Canyon Portals 1st Right Submains Proposed Bulkheads – Installation and Monitoring Plan Addendum #3 – Booklet Replacement Addendum #3 – Booklet Replacement The reason the entire booklet was replaced was due to the relocation of the 1st Right Bulkheads from XC-28 to XC-4. The following lists the edits required: Text Section: Remedial Approaches to Containing Potentially Elevated Iron Water • Page 8 o Number of bulkheads change from 9 to 11 • Page 9 o Second paragraph – elevation and pressure related to 1st Right XC-4 Existing Conditions • Page 9 o Last paragraph – distance to second mining Bulkhead Stability • Page 10 o Table 2 – revised safety factors for 1st Right Construction Location and Impoundment Area • Page 14 o First paragraph – location of 1st Right bulkheads Bulkhead Construction Sequence • Page 15 o Construction sequence details related to 1st Right Construction Details • Page 17 o Last paragraph - states that the 3rd North B seals (mine separation seals) would be constructed simultaneously with the bulkheads. This is no longer the case. MSHA District 9 approved the 3rd North B seals on April 1. Ventilation changes in the mine will be effective 4/2/2015. Construction and pumping of 120 psi rated seals at the 3rd North Mains crosscut #138 location will start on Monday morning April 6th, 2015. Rilda Canyon Concrete Plugs • Page 17 o Section revised – includes design formula Appendices: Appendix B • Revised to include drill hole near 1st Right XC-4 Appendix C • Revised to ARMPS revised 1st Right XC-4 analysis Appendix E • Revised to include photos of 1st Right XC-4 Figures and Maps: • All figures and maps were revised to reflect the relocation of 1st Right bulkheads