Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20210831PAC to PIIC Attach 25.pdf
Rocky Mountain Power Idaho General Rate Case - December 2021 Major Plant Addition Detail - January 2020 - December 2020 Project Description Account Factor In-Service Date Jan 20 - Dec 20 Plant Additions Distribution Goshen-Sugarmill-Rigby 161kV Transm Line 364 ID Jan20 - Dec20 5,540,132 Distribution Total 5,540,132 General Plant LCT Open Office Plan 397 SO Jan20 - Dec20 5,010,018 Q641 Cove Mountain Solar 397 SO Jan20 - Dec20 165,642 Q737 Cove Mountain Solar 2, LLC 397 SO Jan20 - Dec20 218,727 Q542 Bowler Flats Wind 397 SO Jan20 - Dec20 1,507,160 Q712 Cedar Springs Wind 1 397 SO Jan20 - Dec20 14,836 Populus Terminal 345kV Line - Staker 397 SO Jan20 - Dec20 28,363 Vitesse - Facebook 60 MW Load Addition 397 SG Jan20 - Dec20 287 Goshen #3 345/161 kV 700 MVA Trfrmr Inst 397 SO Jan20 - Dec20 654,695 Goshen-Sugarmill-Rigby 161kV Transm Line 397 SO Jan20 - Dec20 169,640 Aeolus-Bridger/Anticline Seg D2 500kV TL 397 SG Jan20 - Dec20 1,392,900 Aeolus-Bridger/Anticline Seg D2 500kV TL 397 SO Jan20 - Dec20 974,812 General Plant Total 10,137,080 Hydro Production Merwin Spillway Gate Hoist Platform Retr 332 SG-P Jan20 - Dec20 5,130,769 Hydro Production Total 5,130,769 Intangible UII Revenue Model 303 SO Jan20 - Dec20 6,009,589 CRM Focused Upgrade(GTX Repl) 303 SO Jan20 - Dec20 9,560,497 Vitesse - Facebook 60 MW Load Addition 303 SO Jan20 - Dec20 318,941 Intangible Total 15,889,026 Other Production Lake Side ST20 Generator Stator Replace Rotor Rewi 343 SG Jan20 - Dec20 16,679,464 Lake Side U11 Combustion Overhaul - CY20 343 SG Jan20 - Dec20 12,758,650 Lake Side U12 Combustion Overhaul - CY20 343 SG Jan20 - Dec20 12,885,167 Other Production Total 42,323,280 Transmission Q641 Cove Mountain Solar 355 SG Jan20 - Dec20 6,612,144 Q737 Cove Mountain Solar 2, LLC 355 SG Jan20 - Dec20 7,474,792 Q542 Bowler Flats Wind 355 SG Jan20 - Dec20 11,426,312 Archie Creek Fire Damage Repair 355 SG Jan20 - Dec20 27,776,096 Populus Terminal 345kV Line - Staker 355 SG Jan20 - Dec20 6,448,800 Vantage Pomona Heights 230kV Line 355 SG Jan20 - Dec20 62,294,309 Slater Fire (Happy Camp) Fire Damage 355 SG Jan20 - Dec20 40,381,602 Vitesse - Facebook 60 MW Load Addition 355 SG Jan20 - Dec20 40,859,178 Goshen #3 345/161 kV 700 MVA Trfrmr Inst 355 SG Jan20 - Dec20 20,299,739 Goshen-Sugarmill-Rigby 161kV Transm Line 355 SG Jan20 - Dec20 20,278,588 Transmission Total 243,851,560 322,871,848