HomeMy WebLinkAbout20210827Bayer 131-134 to PAC.pdf. 1..Randall C. Budge,ISB No. 1949
Thomas J. Budge, ISB No. 7465
RACINE OLSON, PLLP
P.O. Box l39l;201E. Center
Pocatello, Idaho 83204-t 39 |
Telephone: (208) 232-6101
Fax: (208) 232-6109
randy@racineolson. conr
ti (r?rac ineol son. cont
Attorneys for Intervenor P4 Production, L.L.C., an ffiliate of Bayer Corporation
BEFORE TIIE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF ROCKY MOUNTAIN POWER FOR
AUTHORITY TO INCREASE ITS RATES
AND CHARGES IN IDAHO AND
APPROVAL OF PROPOSED ELECTRIC
SERVICE SCHEDULES AND
REGULATIONS
CASE NO. PAC-8.2I-07
BAYER CORPORATION'S
ELEVENTH SET OF DATA
REQUESTS TO ROCKY
MOUNTAIN POWER
P4 Production, L.L.C., an affiliate of Bayer Corporation (hereinafter "Bayer"), by and
through its attomeys, hereby submits this Eleventh Set of Data Requests to Rocky Mountain
Power, pursuantto Rule 225 of the tdaho Public Utility Commission's Rules of Procedure,IDAPA
31.01.01.
This Data Request is to be considered continuing, and Rocky Mountain Power is requested
to provide, by way of supplementary responses, additional documents that it or any person acting
on its behalf may later obtain that will augment the documents or information produced.
Please provide answers to each question, supporting workpapers that provide detail or are
the source of information used in calculations, and the name, job title and telephone number of the
person preparing the documents. Please identiff the name, job title, location and telephone number
of the record holder.
In addition to the written copies provided as response to the requests, please provide all
Excel and electronic files on CD with formulas activated.
BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOI.'NTAIN
POWER. I
Bayer Set 11
Request No. 131: Follow-Up to RMP Response to Bayer Data Request No. 34. With
respect to Rocky Mountain Power's Response to Bayer's 2nd Set Data Request No. 34, please
provide the following GRID runs:
a. Please provide a GRID analysis for a calendar year with no Bayer intemrptions
associated with an operating reserve event. Assume Bayer is in place to provide 95
MW of operating reserve. Please provide the GRID analysis results in electronic
native format. This format should be identical to the GRID results format used in the
response to Bayer Data Request No. 34.
b. Please provide a GRID analysis for a calendar yefi where Bayer is intemrpted by 95
MW for operating reserve events that total 188 hours in the months of July through
September. Please maintain the same inputs as were used to run the GzuD analysis in
part a. above. Please provide the GRID analysis results in electronic native format.
This format should be identical to the GRID results format used in the response to
Bayer Data Request No. 34.
c. Please provide a GRID analysis for a calendar year where a new aero derivative
simple cycle combustion turbine ("SCCT") is put in place of Bayer's 95 MW
intemrptible load and only responds to operating reserve events that total 188 hours in
the months of July through September. Assume Bayer does not provide any
curtailment products and its load is firm. Please maintain the same inputs as used to
run the GRID analysis in part b. above and assume the same 188 hours of intemrption
for operating reserve events as was modeled in the GRID analysis in part b. above.
Please provide the GRID analysis results in electronic native format. This format
should be identical to the GRID results format used in the response to Bayer Data
Request No. 34.
Request No. 132: Interruptibility of Bayer. In reference to PacifiCorp's 2019
Integrated Resource Plan (IRP), please describe how the intemrptibility of the Bayer load is
recognized in the IRP.
Request No. 133: Interruptibility of Bayer. In reference to PacifiCorp's2021
Integrated Resource Plan (IRP), please describe how the intemrptibility of the Bayer load is
recognized in the IRP.
Request No. 134: Pryor Mountain. Please refer to RMP Witness Rick Link's Confidential
work paper "Table 4, Figure 3-4, FB_PryorMtn_Analysis_2019-12-06 v3.xlsx":
(a) In row l0 of the'oPryor Mountain Economics" worksheet RMP provides values that
represent the generation for the Pryor Mountain wind project for each year of the project's
life. Please identiff the work paper(s) where these generation values are developed. If
RMP failed to provide the work paper(s) with its filing, or in response to previously
BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOI.JNTAIN
POWER. 2
propounded discovery, please provide the work paper(s) supporting these generation
values. Please provide the work paper(s) in Excel format with formulas intact to allow a
complete understanding of how the annual values were determined.
(b) In rows 16 through 2l of the "Pryor Mountain Economics" worksheet RMP provides
values for the project cost (separated by Capital Rev. Req., PTCs, O&M, Gen. Tax,
Property Tax, and Transmission Upgrades) for the Pryor Mountain wind project for each
year of the project's life. For each project cost category, please identiff the work paper(s)
where these various project costs are developed. If RMP failed to provide the work
paper(s) with its filing, or in response to previously propounded discovery, please provide
the work paper(s) supporting the development of these various cost categories. Please
provide the work pape(s) in Excel format with formulas intact to allow a complete
understanding of how the annual values were determined.
DATED this 26m day of August,2\Zl.
RACINE OLSON, PLLP
c"
BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOUNTAIN
POWER - 3
By
C.
CERTIFICATE OF MAILING
I HEREBY CERTIFY that on this 26s day of August,202l,l caused to be served a true and
correct copy of the foregoing document upon the following individuals in the manner indicated below:
RACINE OLSON, PLLP
By:c,
Jan Noriyuki
Commission Secretary
Idaho Public Utilities Commission
P.O. Box 83720, Boise lD 83720-0074
I l33l W. Chinden Blvd, Bldg. 8, Suite 201-A
Boise,ID 83714
Jan.noriyuki@puc. idaho. gov
Ted Weston
Idaho Regulatory Affairs Manager
Rocky Mountain Power
1407 West North Temple, Suite 330
Salt Lake Ciry, UT 841l6
ted. we ston@ pac i fl corp. com
Data Request Response Center
PacifiCorp
datareq ue st @p ac i fl c orp. c om
RANDALL C. BUDGE
Dayn Hardie
John Hammond, Jr.
Deputy Attorneys General
Idaho Public Utilities Commission
ll33l W. ChindenBlvd., BldgNo.8,
Suite 201-A (83714)
PO Box 83720
Boise,lD 83720-0074
dayn.hardie@ouc.idaho. eov
i ohn.hammond@puc. idaho. gov
Emily L. Wegener
Matthew D. McVee
Assistant General Counsel
Rocky Mountain Power
1407 West North Temple, Suite 320
Salt Lake city, uT 84116
Emily. we gener@pacifi corp.com
Matthew. mcvee@paci fi corp. com
Eric L. Olsen
Attorney for ldaho Irrigation Pumpers
Association, Inc. (IIPA)
ECHO HAWK & OLSEN, PLLC
505 Pershing Ave., Ste. 100
P.O. Box 6119
Pocatello,Idaho 83205
elo@echohawk.com
BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOLINTAIN
POWER - 4
Anthony Yankel
12700 Lake Avenue, Unit 2505
Lakewood, Ohio 44107
tony@yankel.net
Bradley Mullins
MW Analytics, Energy & Utilities
bmrullins@mwanalytics.com
James R. Smith
Bayer Corporation
P4 Production, L.L.C.
371 S. 3rd West
Soda Springs, Idaho 83276
i irn.r. smith@icloud.com
Brian C. Collins
Maurice Brubaker
Brubaker & Associates
16690 Swingley Ridge Rd., #140
Chesterfield, MO 63017
bcollins@consultbai.com
mbrubaker@consultbai. com
Kevin C. Higgins
Courtney Higgins
Neal Townsend
Milli Pichardo
Energy Strategies
I I I East Broadway, Suite 1200
Salt Lake City, Utah 84111
khi eqins@enereystrat. com
chissins@enersvstrat. cont
ntownsend@ energystrat. com
mpichardo@energystrat. com
Ronald L. Williams
Attorney for P aci/iCorp ldaho Industrial
Customers (PIIC)
WILLIAMS BRADBURY, P.C.
P.O. Box 388
Boise,ID 83701
ron@williarnsbradbury, com
PIIC Electronic Service Only:
Val Steiner: Val. Steiner@itafbs.com
Kyle Williams: williamsk@byui.edu
Adam Gardner: AGardner@idahoan.com
Mike Veile
Bayer Corporation
P4 Production, L.L.C.
P.O. Box 816
Soda Springs, Idaho 83276
rnike.veiIe@bayer.com
Lance Kaufrnan
Aegis Insight
2623 NW Bluebell Place
Corvallis, Oregon 97330
lance@aesi sins i sht. com
Benjamin J. Otto
Idaho Conservation League
710 N. 6th Street
Boise,lD 83702
botto @idahoconservation. org
BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOUNTAIN
POWER. 5
BradM. Purdy
Attorwy for ComnumW Action Partrcrship
Assaciation of ldaln
2019N. lTrh st
Boise,ID. 83702
bmpurdy@hotrrail.com
BAYER CORPORATION',S EI"EVENTII SET OF DATA BEQT,JESTS TO ROCKY MOIJNTAIN
POWER.6