Loading...
HomeMy WebLinkAbout20210827Bayer 131-134 to PAC.pdf. 1..Randall C. Budge,ISB No. 1949 Thomas J. Budge, ISB No. 7465 RACINE OLSON, PLLP P.O. Box l39l;201E. Center Pocatello, Idaho 83204-t 39 | Telephone: (208) 232-6101 Fax: (208) 232-6109 randy@racineolson. conr ti (r?rac ineol son. cont Attorneys for Intervenor P4 Production, L.L.C., an ffiliate of Bayer Corporation BEFORE TIIE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORITY TO INCREASE ITS RATES AND CHARGES IN IDAHO AND APPROVAL OF PROPOSED ELECTRIC SERVICE SCHEDULES AND REGULATIONS CASE NO. PAC-8.2I-07 BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOUNTAIN POWER P4 Production, L.L.C., an affiliate of Bayer Corporation (hereinafter "Bayer"), by and through its attomeys, hereby submits this Eleventh Set of Data Requests to Rocky Mountain Power, pursuantto Rule 225 of the tdaho Public Utility Commission's Rules of Procedure,IDAPA 31.01.01. This Data Request is to be considered continuing, and Rocky Mountain Power is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of the person preparing the documents. Please identiff the name, job title, location and telephone number of the record holder. In addition to the written copies provided as response to the requests, please provide all Excel and electronic files on CD with formulas activated. BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOI.'NTAIN POWER. I Bayer Set 11 Request No. 131: Follow-Up to RMP Response to Bayer Data Request No. 34. With respect to Rocky Mountain Power's Response to Bayer's 2nd Set Data Request No. 34, please provide the following GRID runs: a. Please provide a GRID analysis for a calendar year with no Bayer intemrptions associated with an operating reserve event. Assume Bayer is in place to provide 95 MW of operating reserve. Please provide the GRID analysis results in electronic native format. This format should be identical to the GRID results format used in the response to Bayer Data Request No. 34. b. Please provide a GRID analysis for a calendar yefi where Bayer is intemrpted by 95 MW for operating reserve events that total 188 hours in the months of July through September. Please maintain the same inputs as were used to run the GzuD analysis in part a. above. Please provide the GRID analysis results in electronic native format. This format should be identical to the GRID results format used in the response to Bayer Data Request No. 34. c. Please provide a GRID analysis for a calendar year where a new aero derivative simple cycle combustion turbine ("SCCT") is put in place of Bayer's 95 MW intemrptible load and only responds to operating reserve events that total 188 hours in the months of July through September. Assume Bayer does not provide any curtailment products and its load is firm. Please maintain the same inputs as used to run the GRID analysis in part b. above and assume the same 188 hours of intemrption for operating reserve events as was modeled in the GRID analysis in part b. above. Please provide the GRID analysis results in electronic native format. This format should be identical to the GRID results format used in the response to Bayer Data Request No. 34. Request No. 132: Interruptibility of Bayer. In reference to PacifiCorp's 2019 Integrated Resource Plan (IRP), please describe how the intemrptibility of the Bayer load is recognized in the IRP. Request No. 133: Interruptibility of Bayer. In reference to PacifiCorp's2021 Integrated Resource Plan (IRP), please describe how the intemrptibility of the Bayer load is recognized in the IRP. Request No. 134: Pryor Mountain. Please refer to RMP Witness Rick Link's Confidential work paper "Table 4, Figure 3-4, FB_PryorMtn_Analysis_2019-12-06 v3.xlsx": (a) In row l0 of the'oPryor Mountain Economics" worksheet RMP provides values that represent the generation for the Pryor Mountain wind project for each year of the project's life. Please identiff the work paper(s) where these generation values are developed. If RMP failed to provide the work paper(s) with its filing, or in response to previously BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOI.JNTAIN POWER. 2 propounded discovery, please provide the work paper(s) supporting these generation values. Please provide the work paper(s) in Excel format with formulas intact to allow a complete understanding of how the annual values were determined. (b) In rows 16 through 2l of the "Pryor Mountain Economics" worksheet RMP provides values for the project cost (separated by Capital Rev. Req., PTCs, O&M, Gen. Tax, Property Tax, and Transmission Upgrades) for the Pryor Mountain wind project for each year of the project's life. For each project cost category, please identiff the work paper(s) where these various project costs are developed. If RMP failed to provide the work paper(s) with its filing, or in response to previously propounded discovery, please provide the work paper(s) supporting the development of these various cost categories. Please provide the work pape(s) in Excel format with formulas intact to allow a complete understanding of how the annual values were determined. DATED this 26m day of August,2\Zl. RACINE OLSON, PLLP c" BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOUNTAIN POWER - 3 By C. CERTIFICATE OF MAILING I HEREBY CERTIFY that on this 26s day of August,202l,l caused to be served a true and correct copy of the foregoing document upon the following individuals in the manner indicated below: RACINE OLSON, PLLP By:c, Jan Noriyuki Commission Secretary Idaho Public Utilities Commission P.O. Box 83720, Boise lD 83720-0074 I l33l W. Chinden Blvd, Bldg. 8, Suite 201-A Boise,ID 83714 Jan.noriyuki@puc. idaho. gov Ted Weston Idaho Regulatory Affairs Manager Rocky Mountain Power 1407 West North Temple, Suite 330 Salt Lake Ciry, UT 841l6 ted. we ston@ pac i fl corp. com Data Request Response Center PacifiCorp datareq ue st @p ac i fl c orp. c om RANDALL C. BUDGE Dayn Hardie John Hammond, Jr. Deputy Attorneys General Idaho Public Utilities Commission ll33l W. ChindenBlvd., BldgNo.8, Suite 201-A (83714) PO Box 83720 Boise,lD 83720-0074 dayn.hardie@ouc.idaho. eov i ohn.hammond@puc. idaho. gov Emily L. Wegener Matthew D. McVee Assistant General Counsel Rocky Mountain Power 1407 West North Temple, Suite 320 Salt Lake city, uT 84116 Emily. we gener@pacifi corp.com Matthew. mcvee@paci fi corp. com Eric L. Olsen Attorney for ldaho Irrigation Pumpers Association, Inc. (IIPA) ECHO HAWK & OLSEN, PLLC 505 Pershing Ave., Ste. 100 P.O. Box 6119 Pocatello,Idaho 83205 elo@echohawk.com BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOLINTAIN POWER - 4 Anthony Yankel 12700 Lake Avenue, Unit 2505 Lakewood, Ohio 44107 tony@yankel.net Bradley Mullins MW Analytics, Energy & Utilities bmrullins@mwanalytics.com James R. Smith Bayer Corporation P4 Production, L.L.C. 371 S. 3rd West Soda Springs, Idaho 83276 i irn.r. smith@icloud.com Brian C. Collins Maurice Brubaker Brubaker & Associates 16690 Swingley Ridge Rd., #140 Chesterfield, MO 63017 bcollins@consultbai.com mbrubaker@consultbai. com Kevin C. Higgins Courtney Higgins Neal Townsend Milli Pichardo Energy Strategies I I I East Broadway, Suite 1200 Salt Lake City, Utah 84111 khi eqins@enereystrat. com chissins@enersvstrat. cont ntownsend@ energystrat. com mpichardo@energystrat. com Ronald L. Williams Attorney for P aci/iCorp ldaho Industrial Customers (PIIC) WILLIAMS BRADBURY, P.C. P.O. Box 388 Boise,ID 83701 ron@williarnsbradbury, com PIIC Electronic Service Only: Val Steiner: Val. Steiner@itafbs.com Kyle Williams: williamsk@byui.edu Adam Gardner: AGardner@idahoan.com Mike Veile Bayer Corporation P4 Production, L.L.C. P.O. Box 816 Soda Springs, Idaho 83276 rnike.veiIe@bayer.com Lance Kaufrnan Aegis Insight 2623 NW Bluebell Place Corvallis, Oregon 97330 lance@aesi sins i sht. com Benjamin J. Otto Idaho Conservation League 710 N. 6th Street Boise,lD 83702 botto @idahoconservation. org BAYER CORPORATION'S ELEVENTH SET OF DATA REQUESTS TO ROCKY MOUNTAIN POWER. 5 BradM. Purdy Attorwy for ComnumW Action Partrcrship Assaciation of ldaln 2019N. lTrh st Boise,ID. 83702 bmpurdy@hotrrail.com BAYER CORPORATION',S EI"EVENTII SET OF DATA BEQT,JESTS TO ROCKY MOIJNTAIN POWER.6