Loading...
HomeMy WebLinkAbout20210824PAC to Bayer 103-106.pdfROCKY MOUNTAIN FOWER 1407 W North Temple, Suite 330 Salt Lake City, Utah 84116 August 24,2021 Randall C. Budge/Bayer randy@racineolson. com (C) Thomas J. Budge/Bayer ti @racineolson. com (WXC) Brian C. Collins/Bayer bcollins@consultbai. com (W)(C) Maurice Brubaker/Bayer mbrubaker@consultbai.com (C) Kevin Higgins/Bayer khi s g ins@enerey strat. c om (C) Lance KaufrnanlB ayer I ance @,ae gi sins i ght. com (C ) James R. Smith/Bayer i im.r. smith@ic loud.com (C) Mike Veile/Bayer mike.vei le@bayer.com Courtney Higgins/Bayer chiqqins@enerevstrat.com Milli Picharo/Bayer mpichardo @enersystrat.com Neal Townsend/B ayer ntown sen d @enerqystrat. co m RE: ID PAC-E-21-07 Bayer Set 7ft (103-106) Please find enclosed Rocky Mountain Power's Responses to Bayer 7ft Set Data Request 103- 106. Also provided is Attachment Bayer 106. If you have any questions, please feel free to call me at (801)220-2963. Sincerely, -!sl-J. Ted Weston Manager, Regulation Enclosures C.c. : Jan Noriyuki/IPUC ian.noriyuki@puc.idaho.eov (C) Ronald L. Williams/PIIC ron@williamsbradbury.corn Bradley G. Mullins/PIIC brmull ins@mwanalytics. com Adam Gardner/PIIC AGardner@idahoan. com (W) Kyle Williams/PIIC williamsk@bvui.edu (W) Val Steiner/PIIC val.steiner@itafos.com (W) Eric L. Olsen/IIPA elo@echohawk.com (C) Anthony Yankel/IPA tonv@vankel.net (C) Ben Otto/ICL botto@idahoconservation.ore (C) Ronald L. Williams/PIIC ron@williamsbradbury.com Bradley G. Mullins/PIIC brmullins@mwanalytics.com Adam Gardner/PIIC AGardner@idahoan.com (W) Kyle Williams/PIIC williamsk@lbvui. edu (W) Val Steiner/PIIC val. steiner@itafos.com (W) Eric L. Olsen/IIPA elo@echohawk.com (C) Anthony Yankel/IIPA tonv@vankel.net (C) Brad Purdy bmpurdy@hotrnail.com (C) PAC-E-21-07 / Rocky Mountain Power August 24,2021 Bayer Data Request 103 Bayer Data Request 103 Rate Base. For each rate base item in RMP witress Steven R. McDougal's RMP Exhibit 40, please prepare a comparison of RMP's proposed rate base amount with a 13-month average rate base amount for the period ending December 31, 202I. Please provide this comparison on both a Total Company and Idaho allocated basis by FERC account and allocation factor. For each rate base item (e.g. electric plant in service, accumulated provision for depreciation, etc.), please provide work papers with the monthly balance used for the l3-month average balance by FERC account and allocation factor. Response to Bayer Data Request 103 PacifiCorp objects to this request as overly burdensome and requiring the creation of a new analysis that is beyond the scope of discovery in this proceeding. Notwithstanding the foregoing objection, the Company responds as follows: The Company has not performed the requested calculation and to do so would require gathering new forecasts and projections. The test period in this general rate case (GRC) has been prepared in a manner that is consistent with the Company's prior Idaho general rate case proceedings, which the Idaho Commission has approved. Notably, the use of an end-of-period calendar year 2021testperiod ensures that costs associated with capital invesfnent is used in useful and properly aligned with customer rates beginning with the January l, 2022 rate effective date proposed in this proceeding. Recordholder:Justin Waterman Sponsor:Steve McDougal PAC-E-21-07 / Rocky Mountain Power August 24,2021 BayerDataRequest 104 BayerData Request 104 Net Pwer Cost. Please provide the RMP work paper file that converts the output shown in the Mr. Wilding's Exhibit 37 GRID report to the NPC adjustuents in the JAIvI/RAM revenue requirement models by FERC accornt and allocation factor. Response to Bayer Data Request 104 Please refer to the direct testimony of Company witress, Steven R McDougal, qpecifically ExhibitNo. 40, page 5.1.1. Reoordholder: Aaron Rose Sponsor:Steven McDougal PAC-E-21-07 / Rocky Mountain Power August 24,2021 Bayer Data Request 105 Bayer Data Request 105 Net Power Cost. Please provide the complete copy of the GRID Report shown in RMP witress Michael G. Wilding's Exhibit No. 37 that shows the monthly energy production and cost per unit production by resource. If not clear from the complete GRID report please provide the monthly energy production included in GRID model for each phase of Pryor Mountain and TB Flats wind plants. Response to Bayer Data Request 105 Please refer to the Company's response to PIIC Data Request 2, specifically Confidential Attachment PIIC 2,fie "ID GRC2I_NPC_FINAL CONF 2021 05 13". Note: the available information in the net power costs (NPC) report is by resource, not by individual unit. Recordholder:Lori Oathes Sponsor:Michael G. Wilding PAC-E-21-07 / Rocky Mountain Power August 24,2021 Bayer Data Request 106 Bayer Data Request 106 Craig Unit 2 SCR. Please identifu the plant balances, accumulated depreciation, and ADIT for this project for each month since it was placed in service through the end of the test period. Also, identifr the relevant monthly balances included in RMP's requested revenue requirement. Please provide any documentation and work papers that support each of the requested amounts in Excel format with formulas intact. Response to Bayer Data Request 106 Please refer to Attachment Bayer 106 for the Craig Unit 2 selective catalytic reduction (SCR) plant balances, accumulated depreciation, and accumulated defened income taxes (ADIT). The attachment also includes the monthly balances for those items. Recordholder:Laura Miller Sponsor:Steven McDougal