Loading...
HomeMy WebLinkAbout20210811PAC to IIPA 15-19.pdfROCKY MOUNTAIN HPH.EF.",,1407 W North Temple, Suite 330 Salt Lake City, Utah 84116 August ll,202l Eric L. Olsen (ISB# 481l) ECHO HAWK & OLSEN, PLLC 505 Pershing Ave., Ste. 100 P.O. Box 6l 19 Pocatello, Idaho 83205 elo@echohawk.com (c) Anthony Yankel/IPA tonv@vankel.net (C) RE: ID PAC-E-21-07 IIPA Set 3 (6-20) Please find enclosed Rocky Mountain Power's Responses to IIPA 3'd Set Data Requests 15-19. Also provided are Attachments IIPA l5-2, 17,18, and 19 {l-4). Provided via encryption is Confidential Attachment IIPA l5-1. Confidential information is provided subject to protection under IDAPA 31.01.01.067 and 31.01.01 .233,the Idaho Public Utilities Commission's Rules of Procedure No. 67 - Information Exempt from Public Review, and further subject to the Non- Disclosure Agreement (NDA) executed in this proceeding. If you have any questions, please feel free to call me at (801)220-2963. Sincerely, --Jsl-J. Ted Weston Manager, Regulation Enclosures C.c.: Jan Noriyuki/IPUC ian.norivuki@puc.idaho.eov (C) Ronald L. Williams/PIIC ron@williamsbradburv. com Bradley G. Mullins/PIIC brmull ins@.mwanalytics. com Adam Gardner/PIIC AGardner@idahoan. corn (W) Kyle Williams/PIIC williamsk@bvui.edu (W) Val Steiner/PIIC val. steiner@,itafos. com (W) Ben Otto/ICL botto@idahoconservation.ore (C) Randall C. Budge/Bayer randv @racineolson. com (C) Thomas J. Budge/Bayer ti @racineolson. com $D(C) Brian C. Collins/Bayer bcollins@consultbai. com (WXC) Maurice B rubaker/B ayer mbrubaker@c onsu ltba i. com (C ) Kevin Higgins/Bayer khi eeins@enerev strat. com (C) Lance KaufrnanlBayer lance@aeeisinsi eht. com (C) James R. Smith/Bayer iim.r.smith@icloud.com (C) Brad Purdy bmpurdy@hotmail.com (C) PAC-E-21-07 / Rocky Mountain Power August 11,2021 IIPA Data Request 15 IIPA Data Request 15 Please provide in electronic format a listing of the date, time, and estimated magnitude of all actual hourly curtailments/intemrptions that occurred during 2014 through the most recent month available in Idaho separated by rate schedule or special contract customer. If outright curtailments/intemrptions are freated differently than "buy-throughs", please state each separately. Response to IIPA Data Request 15 The Company objects to this request on the grounds that the curtailment of intemrptible loads of PacifiCorp's special contract customers is confidential customer specific information, which can't be provided without the customer's authorization. Based on that understanding, the Company responds with redacted and aggregated information for calendar years2014 through 2019. Please refer to Confidential Attachment IIPA l5-1 which provides information on the special contacts / intemrptible contacts curtailment of interruptible loads for calendar years2014 through 2020. Please refer to Attachment IIPA l5-2 which provides information on the Company's Idaho and Utah Irrigation Load Contol Programs, and Utah's Cool Keeper Program for 2014 through 2020. Confidential information is provided subject to protection under IDAPA 31.01.01.067 and 31.01.01.233, the Idaho Public Utilities Commission's Rules of Procedure No. 67 - Information Exempt from Public Review, and further subject to the Non-Disclosure Agreement (I.{DA) executed in this proceeding. Recordholder: Scott McAdams / Samuel Cope / Shawn Grant Sponsor:Steve McDougal PAC-E-21-07 / Rocky Mountain Power August ll,202l IIPA DataRequest 16 IIPA Data Request 16 Please provide in electronic format a listing of the date, time, and estimated magnitude of all actual hourly curtailments/intemrptions that occurred during 2014 through the most recent month available in each of the other jurisdictions. If oufight curtailments/intemrptions are teated differently than "buy-throughs", please state each separately. Response to IIPA Data Request 16 The Company objects to this request on the grounds that the curtailment of intemrptible loads of PacifiCorp's special confiact customers is confidential customer specific information, which can't be provided without the customer's authorization. Based on that understanding, the Company responds with redacted and aggregated information for calendar years 2014 through 2019. Please refer to the Company's response to IIPA Data Request 15 Recordholder:Scott McAdams / Samuel Cope / Shawn Grant Steve McDougalSponsor: PAC-E-21-07 / Rocky Mountain Power August ll,202t IIPA DataRequest 17 IIPA Data Request 17 Please provide, in electronic format outage data for each substation and each circuit in each substation from January 2014 thru the present: (a) The date, time and drnation of any outage. O) The number of customers impacted by rate schedule. (c) The estimated kW of load impacted. (d) AnV other data the Company routinely keeps regarding outages such as cause of the outage. Response to IIPA Data Request 17 Please refer to Attachment IIPA 17. Recordholder:Heide Caswell Sponsor:Robert Meredith PAC-E-21-07 / Rocky Mountain Power August ll,202l IIPA Data Request l8 IIPA Data Request 18 Please provide electronically any SAIDI, SAIFI, MAIDI, or CAIDI information that the Company has collected since 2014. Such data should be provided at the least aggregated level it is maintained (not necessarily gathered) by the Company Response to IIPA Data Request 18 Please refer to Attachment IIPA 18. Reliability data at a disaggregated level (such as at a service tansformer) is not reasonably comparable over time; as such the Company provides annual circuit-level data, both including and excluding major events for the past five years. Recordholder: April Brewer Sponsor:Heide Caswell PAC-E-21-07 / Rocky Mountain Power August 11,2021 IIPA Data Request 19 IIPA Data Request 19 For each substation listed in Meredith work paper entitled "Idaho Monthly Sub Peaks CY2020", please provide in electronic format: (a) The capital cost recorded of the Company's continuing property records; (b) The depreciation reserves associated with each substation; (c) The monthly peak demand from January 2014 thru the present; (d) The total capacity of the substation for each month from January 2014 thru the present; (e) The capital additions for each year for 2014 tl'ffn the anticipated end of 2021; and (0 Any breakdown of the number of customers served by class. Response to IIPA Data Request 19 (a) Please refer to Attachment IIPA 19-l for the gross plant balances on December 31,2020 of distribution assets (excluding land) capitalized at each substation location listed in the work paper referenced, with the exception of Poverty substation. Poverty substation was capitalized as a pole mounted sub and classified as a distribution line asset. Due to the nature of how line assets are maintained on the Company's properly records, where they are recorded at a more generalized district level based on their physical location, it is not possible to identifr and isolate the actual balance as of December 31,2020 specific to Poverty. (b) Please refer to Attachment IIPA 19-l for the depreciation reserve balances on December 31,2020 associated with the gross plant balances provided with the Company's response to subpart (a) above. The Company utilizes group depreciation and maintains accumulated reserve balances for distribution by state. Therefore, the balances provided are an estimated allocation, by substation location, of the total Idaho distribution reserve. (c) Please refer to Attachment IIPA l9-2 (d) Please refer to Attachment IIPA 19-2 PAC-E-21-07 / Rocky Mountain Power August ll,202l IIPA DataRequest l9 (e) Please refer to Attachment IIPA l9-3 for the actual plant additions from 2014 through Jrne 2021and the forecasted plant additions for the July 2021 through December 2021peiod. Distibution capital costs are situs assigned to the state where the asset is located. Idaho situs capital amounts as of December 31,2020 are included in the base period revenue requirement calculation. Forecasted capital projects are only reflected in the Test Period revenue requirement if they are known, measurable, and greater than $5 million. As suctr, not all forecasted projects on Attachment IIPA l9-3 are included in the Test Period revenue requirement. Please refer to Exhibit No. 40, Page 8.5 for a list of forecasted capital projects included in the Test Period. (f) Please refer to Attachment IPUC 194 Recordholder:Justus Evangelista / Jake Barker I Craig Larsen / Juan Lrma Robert MeredithSponsor: