HomeMy WebLinkAbout20200915PAC to Staff 24-29.pdfROCKY MOUNTAIN POWER iif r;illYIt] ?I:ii$[r l5 F]l 3; tB il:,r,-:.., r-;-r-f+. i- 4,_j4 ri +!ll, 'i ' :t::, i-Uitiftil.) 1407 W North Temple, Suite 330 Salt Lake City, Utah 84116{i*Er;!3 iull September 15,2020 JanNoriyuki Idaho Public Utilities Commission 472W. Washington Boise, ID 83702-5918 i an.noriwki@puc.idaho. gov (C) RE: ID PAC-E-20-10 IPUC 3'd Set Data RequestQ4-29) Please find enclosed Rocky Mountain Power's Responses to IPUC Data Requests 24-29. Also provided is Attachment IPUC 25. Provided via encryption is Attachment IPUC 24. Confrdential information is provided subject to protected under IDAPA 31.01.01.067 and 31.01.01.233, the Idaho Public Utilities Commission's Rules of Procedure No. 67 - lnformation Exempt from Public Review, and further subject to any subsequentNon-Disclosure Agreement (NDA) executed in this proceeding. If you have any questions, please feel free to call me at (801) 220-2963. Sincerely, -1sl-J. Ted Weston Manager, Regulation Enclosures C.c.: Greg Adamsffall River Gree@richardsonadams.com (C) PAC-E-20-10 / Rocky Mountain Power September 15,2020 IPUC Data Request 24 IPUC Data Request?A Please provide Felt Hydro's hourly generation for year 2020. Response to IPUC Data Request}4 Please refer to Confidential Attachment IPUC 24 which provides collected and archived meter data (in kilowatt-hours (kWh)), in hourly increments, for the CDM Hydro / Felt Hydro / Fall River Rural Electric Cooperative qualiffing facility (QF) for 2020 (January through August). Note: data for 2020 is preliminary and subject to change. Confidential information is provided subject to protected under IDAPA 31.01.01.067 and 31.01 .01.233,the Idaho Public Utilities Commission's Rules of Procedure No. 67 - Information Exempt from Public Review, and further subject to any subsequent Non-Disclosure Agleement (NDA) executed in this proceeding. Recordholder: Sponsor: Debbie Blake To Be Determined PAC-E-20-10 / Rocky Mountain Power September 15,2020 IPUC Data Request 25 IPUC Data Request 25 Please provide Felt Hydro's monthly generation for years 2006, and 2010 through 2014. Response to IPUC Data Request 25 Please refer to Attachment IPUC 25 which provides actual monthly generation data for the CDM Hydro / Felt Hydro / Fall River Rural Electric Cooperative qualiffing facility (QF) for 2006, and 2010 through 2014. Note: data provided is in megawatt-hours (M$/h). Recordholder: Sponsor: Debbie Blake To Be Determined PAC-E-20-10 / Rocky Mountain Power September 15,2020 IPUC Data Request 26 IPUC Data Request 26 Order No. 29632 requires that the lesser of 85% of the market price or the contract price is used for energy generated outside the 90/1 10 band. Please explain and provide an example of how the Company determines the contact price at each month, while the proposed contract only includes an annual price and heavy load/light load adjusting factors. Response to IPUC Data Request 26 Please refer to the Company's l't Supplemental response to IPUC Data Request 15. Recordholder: Sponsor: Debbie Blake To Be Determined PAC-E-20-10 / Rocky Mountain Power September 15,2020 IPUC Data Request 27 IPUC Data Request2T The Company's response to Production Request No. 17 describes the Settlecore system, which "sets up all the calculations specific to the contact parameters and produces the statement for the vendor at each rate and range of megawatt hours generated for the calendar month." Please explain if the Settlecore system can be configured to apply different rates for each hour of metered data from a Qualiffing Facility depending on whether actual generation is above or below a specified amount. Response to IPUC Data Request2T Please refer to the Company's 1" Supplernental response to IPUC Data Request 17. Recordholder: Sponsor: Debbie Blake To Be Determined PAC-E-20-10 / Rocky Mountain Power September 15,2020 IPUC Data Request 28 IPUC Data Request 28 The Company's response to Production Request No. 20 provided the amount of generation in each hour from the Felt Hydro project for the past five years-2015 to 2019. Please answer the following: (a) Please explain negative values in the data. Examples include: 5ll3l20l7 hours lthrough 8;5/1212017 hour l3; and 6110/2017 hour 5. (b) Please explain zero values in the data. Do zero values represent no generation, unavailable data, or something else. Examples include: 512412017 hours l8 through 24; and611012017 hours 1,2, and.4. (c) Please explain why January through April of 2017, Jaruary and February of 2018, and February through December of 2019 have the same generation amount for every hour across each month, instead of the actual (and unique) generation amounts for each hour. If these amounts are derived or estimated, please show the calculations or method of derivation or estimation. (d) Generation for hour 3 of Novemb er 6, 201 6 is 7 206.7 2 kWh which is significantly above the nameplate capacity of Powerhouse#Z. Please explain the irregularity of this data point and if this is an error, an adjusted amount, or some other modifi cation/anomaly. (e) Generation for hour 3 ofNovember 5,2017 is 9550.08 kWh, which is significantly above the nameplate capacity of Powerhouse#2. There are also two generation amounts for the same proceeding hour (hour 2). Please explain the irregularities of these data points and if these are errors, adjusted amounts, or some other modification/anomaly. (f) Generation for hour 2 of April 1,2017 is 5025 kWh. Please explain if this is an elror, an adjusted amount, or some other modification/anomaly given the fact that the hours proceeding this data point for the entire month of March 2017 arc 4321 kwh and the hours after this data point for the rest of April 2017 are 4686 kWh. Response to IPUC Data Request 28 Please refer to the Company's 1" Supplemental response to IPUC Data Request 20. Recordholder: Sponsor: Debbie Blake To Be Determined PAC-E-20-10 / Rocky Mountain Power September 15,2020 IPUC Data Request 29 IPUC Data Request?9 Fall River's response to Production Request No. 3 stated "On July 5,2020,Fa11 River's data shows that Powerhouse #2 generated gross production of 127,000 kWh, which would equate to average hourly generation over that 24-how period of 5,292 kwh". Please veriff this amount with the Company's meter data and identifu and explain any anomalies with the data for this time period. Response to IPUC Data Request?9 Please refer to the Company's response to IPUC Data Request 24, specifically Confidential Attachment IPUC 24 which provides collected and archived meter data (in kilowatt-hours (kWh)), in hourly increments, for the CDM Hydro / Felt Hydro i Fall River Rural Electric Cooperative qualiffing facility (QF) for 2020 (January through August); which includes July 5, 2020 data. Note: data for 2020 is preliminary and subject to change. PacifiCorp's metering system captured July 5, 2020 hourly data (please refer to Confidential Attachment IPUC 24) for a total I15,185 kWh. In no hour for July 5, 2020 didPacifiCorp record any amounts over 5,000 kwh. Note: the Company does not own or operate the CDM Hydro / Felt Hydro / Fall River Rural Electric Cooperative QF, and therefore the Company cannot veriff or explain the totals provided to the ldaho Public Service Commission (IPUC) by Fall River in Fall River's response to IPUC Production Request 3. Recordholder: Sponsor: Debbie Blake To Be Determined