1407 W North Temple, Suite 330
Salt Lake City, Utah 84116{i*Er;!3 iull
September 15,2020
JanNoriyuki
Idaho Public Utilities Commission
472W. Washington
Boise, ID 83702-5918
i an.noriwki@puc.idaho. gov (C)
RE: ID PAC-E-20-10
IPUC 3'd Set Data RequestQ4-29)
Please find enclosed Rocky Mountain Power's Responses to IPUC Data Requests 24-29. Also
provided is Attachment IPUC 25. Provided via encryption is Attachment IPUC 24. Confrdential
information is provided subject to protected under IDAPA 31.01.01.067 and 31.01.01.233, the
Idaho Public Utilities Commission's Rules of Procedure No. 67 - lnformation Exempt from
Public Review, and further subject to any subsequentNon-Disclosure Agreement (NDA)
executed in this proceeding.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
-1sl-J. Ted Weston
Manager, Regulation
Enclosures
C.c.: Greg Adamsffall River Gree@richardsonadams.com (C)
PAC-E-20-10 / Rocky Mountain Power
September 15,2020
IPUC Data Request 24
IPUC Data Request?A
Please provide Felt Hydro's hourly generation for year 2020.
Response to IPUC Data Request}4
Please refer to Confidential Attachment IPUC 24 which provides collected and
archived meter data (in kilowatt-hours (kWh)), in hourly increments, for the CDM
Hydro / Felt Hydro / Fall River Rural Electric Cooperative qualiffing facility
(QF) for 2020 (January through August). Note: data for 2020 is preliminary and
subject to change.
Confidential information is provided subject to protected under IDAPA
31.01.01.067 and 31.01 .01.233,the Idaho Public Utilities Commission's Rules of
Procedure No. 67 - Information Exempt from Public Review, and further subject
to any subsequent Non-Disclosure Agleement (NDA) executed in this proceeding.
Recordholder:
Sponsor:
Debbie Blake
To Be Determined
PAC-E-20-10 / Rocky Mountain Power
September 15,2020
IPUC Data Request 25
IPUC Data Request 25
Please provide Felt Hydro's monthly generation for years 2006, and 2010 through
2014.
Response to IPUC Data Request 25
Please refer to Attachment IPUC 25 which provides actual monthly generation
data for the CDM Hydro / Felt Hydro / Fall River Rural Electric Cooperative
qualiffing facility (QF) for 2006, and 2010 through 2014. Note: data provided is
in megawatt-hours (M$/h).
Recordholder:
Sponsor:
Debbie Blake
To Be Determined
PAC-E-20-10 / Rocky Mountain Power
September 15,2020
IPUC Data Request 26
IPUC Data Request 26
Order No. 29632 requires that the lesser of 85% of the market price or the
contract price is used for energy generated outside the 90/1 10 band. Please
explain and provide an example of how the Company determines the contact
price at each month, while the proposed contract only includes an annual price
and heavy load/light load adjusting factors.
Response to IPUC Data Request 26
Please refer to the Company's l't Supplemental response to IPUC Data Request
15.
Recordholder:
Sponsor:
Debbie Blake
To Be Determined
PAC-E-20-10 / Rocky Mountain Power
September 15,2020
IPUC Data Request 27
IPUC Data Request2T
The Company's response to Production Request No. 17 describes the Settlecore
system, which "sets up all the calculations specific to the contact parameters and
produces the statement for the vendor at each rate and range of megawatt hours
generated for the calendar month." Please explain if the Settlecore system can be
configured to apply different rates for each hour of metered data from a
Qualiffing Facility depending on whether actual generation is above or below a
specified amount.
Response to IPUC Data Request2T
Please refer to the Company's 1" Supplernental response to IPUC Data Request
17.
Recordholder:
Sponsor:
Debbie Blake
To Be Determined
PAC-E-20-10 / Rocky Mountain Power
September 15,2020
IPUC Data Request 28
IPUC Data Request 28
The Company's response to Production Request No. 20 provided the amount of
generation in each hour from the Felt Hydro project for the past five years-2015 to
2019. Please answer the following:
(a) Please explain negative values in the data. Examples include: 5ll3l20l7 hours
lthrough 8;5/1212017 hour l3; and 6110/2017 hour 5.
(b) Please explain zero values in the data. Do zero values represent no generation,
unavailable data, or something else. Examples include: 512412017 hours l8
through 24; and611012017 hours 1,2, and.4.
(c) Please explain why January through April of 2017, Jaruary and February of
2018, and February through December of 2019 have the same generation
amount for every hour across each month, instead of the actual (and unique)
generation amounts for each hour. If these amounts are derived or estimated,
please show the calculations or method of derivation or estimation.
(d) Generation for hour 3 of Novemb er 6, 201 6 is 7 206.7 2 kWh which is
significantly above the nameplate capacity of Powerhouse#Z. Please explain
the irregularity of this data point and if this is an error, an adjusted amount, or
some other modifi cation/anomaly.
(e) Generation for hour 3 ofNovember 5,2017 is 9550.08 kWh, which is
significantly above the nameplate capacity of Powerhouse#2. There are also
two generation amounts for the same proceeding hour (hour 2). Please explain
the irregularities of these data points and if these are errors, adjusted amounts,
or some other modification/anomaly.
(f) Generation for hour 2 of April 1,2017 is 5025 kWh. Please explain if this is
an elror, an adjusted amount, or some other modification/anomaly given the
fact that the hours proceeding this data point for the entire month of March
2017 arc 4321 kwh and the hours after this data point for the rest of April
2017 are 4686 kWh.
Response to IPUC Data Request 28
Please refer to the Company's 1" Supplemental response to IPUC Data Request
20.
Recordholder:
Sponsor:
Debbie Blake
To Be Determined
PAC-E-20-10 / Rocky Mountain Power
September 15,2020
IPUC Data Request 29
IPUC Data Request?9
Fall River's response to Production Request No. 3 stated "On July 5,2020,Fa11
River's data shows that Powerhouse #2 generated gross production of 127,000
kWh, which would equate to average hourly generation over that 24-how period
of 5,292 kwh". Please veriff this amount with the Company's meter data and
identifu and explain any anomalies with the data for this time period.
Response to IPUC Data Request?9
Please refer to the Company's response to IPUC Data Request 24, specifically
Confidential Attachment IPUC 24 which provides collected and archived meter
data (in kilowatt-hours (kWh)), in hourly increments, for the CDM Hydro / Felt
Hydro i Fall River Rural Electric Cooperative qualiffing facility (QF) for 2020
(January through August); which includes July 5, 2020 data. Note: data for 2020
is preliminary and subject to change.
PacifiCorp's metering system captured July 5, 2020 hourly data (please refer to
Confidential Attachment IPUC 24) for a total I15,185 kWh. In no hour for July 5,
2020 didPacifiCorp record any amounts over 5,000 kwh.
Note: the Company does not own or operate the CDM Hydro / Felt Hydro / Fall
River Rural Electric Cooperative QF, and therefore the Company cannot veriff or
explain the totals provided to the ldaho Public Service Commission (IPUC) by
Fall River in Fall River's response to IPUC Production Request 3.
Recordholder:
Sponsor:
Debbie Blake
To Be Determined