HomeMy WebLinkAbout20200903PAC to Staff 20 and 22.pdfROCKY MOUNTAIN
BP,:IY,ER^"
itfl*ftVH*
!*?i] $[f *3 frH ll' I S
..' : 1i:ii ii?, . \--.. ._ 1 _1 :- r*.:; Lr lr
' i,. ;l {.1f; l.4l-4 i$$}SPt
1407 W North Temple, Suite 330
Salt Lake City, Utah 84116
September 3,2020
JanNoriyuki
Idaho Public Utilities Commission
472W. Washington
Boise,ID 83702-5918
i an.noriyuki@nuc. idaho. eov (C)
RE ID PAC-E-20.10
IPUC 3'd Set Data Request (15-23)
Please find enclosed Rocky Mountain Power's Responses to IPUC Data Requests 20 and22.
Also provided is Attachment IPUC 22. Provided via encryption is Attachment IPUC 20.
Confidential information is provided subject to protected under IDAPA 31.01.01.067 and
31.01.01.233, the Idaho Public Utilities Commission's Rules of Procedure No. 67 - Information
Exempt from Public Review, and further subject to any subsequent Non-Disclosure Agreement
(NDA) executed in this proceeding.
If you have any questions, please feel free to call me at (801) 220-2963.
Sincerely,
-Jsl-J. Ted Weston
Manager, Regulation
Enclosures
C.c.: Greg Adams/Fall River Gree@richardsonadams.com
PAC-E-20-10 / Rocky Mountain Power
September 3,2020
IPUC Data Request 20
IPUC Data Request 20
Please provide the amount of generation in each hour from the Felt Hydro QF for
the past five years (from 2015 to 2019) and indicate how far above or below each
year is to normal water conditions. If hourly meter data are not available, please
provide the data at the minimal time interval available.
Response to IPUC Data Request 20
Please refer to Confidential Attachment IPUC 20 which provides collected and
archived meter data, in hourly increments, for the CDM Hydro / Felt Hydro / Fall
River Rural Electric Cooperative qualifuing facility (QF) for 2015 through 2019.
Note: data provided is in kilowatt-hours (k!Vh).
Note: the Company does not own or operate the CDM Hydro / Felt Hydro / Fall
River Rural Electric Cooperative QF, and therefore the Company has no
information as to what "normal water conditions" would have been during its
generating operations in 2015 through 2019.
Confidential information is provided subject to protected under IDAPA
31.01.01.067 and 31.01.01.233, the Idaho Public Utilities Commission's Rules of
Procedure No. 67 - Information Exempt from Public Review, and further subject
to any subsequent Non-Disclosure Agreement (NDA) executed in this proceeding.
Recordholder:
Sponsor:
Debbie Blake
To Be Determined
PAC-E-20-10 / Rocky Mountain Power
September 3,2020
IPUC Data Request 22
IPUC Data Request22
Please provide the amount of generation in each hour from the Felt Hydro QF
from 2003 to 2005 and from 2007 to 2009 and indicate how far above or below
each year is to normal water conditions. (If hourly meter data are not available,
please provide the data at the minimal time interval available.)
Response to IPUC Data Request2Z
Please refer to Attachment IPUC 22 whrchprovides actual monthly generation
data for the CDM Hydro / Felt Hydro / Fall River Rural Elechic Cooperative
qualiSing facility (QF) for 2003 through 2005, and 2007 through 2009. For these
years, the data is only available monthly not hourly. Note: data provided is in
megawatt-hours (MWh).
Note: the Company does not own or operate the CDM Hydro / Felt Hydro / Fall
River Rural Electric Cooperative QF, and therefore the Company has no
information as to what "normal water conditions" would have been during its
generating operations in 2003 through 2005, and2007 through 2009.
Recordholder:
Sponsor:
Debbie Blake
To Be Determined