Loading...
HomeMy WebLinkAbout20191112PAC to Staff 1-5.pdfROCKY MOUNTAIN POWER a DMSTON Of P CtFtCOiP RECEIVED i0l9l{0Y l2 Al{ l0: 28 '1407 W North Temple, Suite 330 Salt Lake City, Utah 84116[, IJSION November 12,2019 Diane Hanian Idaho Public Utilities Commission 472 W. Washington Boise, ID 83702-5918 diane. holt(@puc.idaho. gov (C) RE:ID PAC.E.I9.14 IPUC I't Set Data Request (l -5) Please find enclosed Rocky Mountain Powsr's Responses to IPUC 1't Set Data Requests 1-5. Also provided are Attachments IPUC 2 and 4. If you have any questions, please feel free to call me at (801) 220-2963. ---ls/-J. Ted Weston Manager, Regulation Enclosures Sincerely, PAC-E-19-14 / Rocky Mountain Power November 12,201,9 IPUC I "t Set Data Request I IPUC Data Request 1 What schedule(s) will the small usage devices be billed under? Response to IPUC Data Request 1 Un-metered small usage devices will be billed under Electric Service Schedule 23. Recordholder: Rob Stewart Sponsor: Ted Weston PAC-E-I9-14 / Rocky Mountain Power November 12, 2019 IPUC I't Set Data Request 2 IPUC Data Request 2 The Application states, "device's capacity requirements will be provided on the customer service application." Application at 3. Has the Company produced a customer service application which includes an option for small usage devices? If so, please provide. If not, please explain the delay and when it will be completed. Response to IPUC Data Request 2 A draft service application form has been created. Please see Attachment IPUC 2. Recordholder: Rob Stewart Sponsor: Ted Weston PAC-E-lg- 14 / Rocky Mountain Power November 12,2019 IPUC l" Set Data Request 3 IPUC Data Request 3 The revised Regulation 4 provided in Attachment I states, "Connections will be made by Company." Attachment 1 at l. What is the fee for the Company to install the small usage device? Response to IPUC Data Request 3 The Company's line extension rule l2 will govem the share, if any, of the cost of attachment that will be covered bv the customer. Recordholder: Rob Stewart Sponsor: Ted Weston PAC-E-19-14 / Rocky Mountain Power November 12,2019 IPUC l't Set Data Request 4 IPUC Data Request 4 The revised Regulation 4 provided in Attachment 'l states, "Connections will be made by Company, subject to the Customer's installation meeting all the Company's design and installation requirements." Attachment I at 1. a. Please provide a copy of the written design and installation requirements; b. If not completed, please provide an outline and explain what will be included in the requirernents; and c. When the customer will receive the specific details. Response to IPUC Data Request 4 a. Please see Attachment IPUC 4 for the Company's small cell antenna installation guidelines. b. See response to a. c. The details will be posted online along with the application form. Recordholder: Rob Stewart Sponsor: Ted Weston PAC-E-19- 14 / Rocky Mountain Power November 12,2019 IPUC l" Set Data Request 5 IPUC Data Request 5 The revised Regulation 4 provided in Attachment I states, "The Company shall have the right to test the capacity requirements ofthe small usage devices from time to time." Attachment 1 at l Please provide the Company's plan for testing the devices which may include which devices will be tested and how often. Response to IPUC Data Request 5 The Company intends to do an annual sampling ofa small percentage ofthese non-metered small usage devices. The frequency and extent to which the Company tests the devices will need to be determined as the Company gains experience with its audits. The volume of devices, the accuracy of wattages that the customer supplies and the availability ofqualified personnel will be factors that will influence the Company's plans as they evolve. Recordholder: Rob Stewa( Sponsor: Ted Weston