Loading...
HomeMy WebLinkAbout20200220PAC to IIPA UT DPU Set 3(1).pdfFebruary 10, 2020 Madison Galt Division of Public Utilities 160 E 300 S, 4th Floor Salt Lake City, UT 84114 dpudatarequest@utah.gov (C) Roxie McCullar RoxieMcCullar@consultant.com (C) RE: UT Docket No. 18-035-36 DPU 3rd Set Data Request (1) Please find enclosed Rocky Mountain Power’s Responses to DPU 3rd Set Data Request 3.1. Also provided is Attachment DPU 3.1. If you have any questions, please call me at (801) 220-2823. Sincerely, Jana Saba Manager, Regulation Enclosures C.c. Cheryl Murray/OCS cmuray@utah.gov (C) Donna Ramas/OCS donnaramas@aol.com (C) Nancy Kelly/WRA nkelly@westernresources.org (C) Sophie Hayes/WRA sophie.hayes@westernresources.org (C) Penny Anderson/WRA penny.anderson@westernresources.org (W) Gary A. Dodge/UAE gdodge@hjdlaw.com (W) Phillip J. Russell/UAE prussell@hjdlaw.com (C) Kevin Higgins/UAE khiggins@energystrat.com (C) Neal Townsend/UAE ntownsend@energystrat.com (C)(W) Courtney Higgins/UAE chiggins@energystrat.com (C)(W) Justin Bieber/UAE jbieber@energystrat.com (C)(W) Hunter Holman/UCE hunter@utahcleanenergy.org (C) Sarah Wright/UCE sarah@utahcleanenergy.org (C) Salt Lake City, UT 84116 18-035-36 / Rocky Mountain Power February 10, 2020 DPU Data Request 3.1 DPU Data Request 3.1 Please provide an updated Exhibit RMP CAT-2 and supporting work papers using the Decommissioning Study provided on January 16, 2020. Response to DPU Data Request 3.1 Values provided in Exhibit RMP CAT-2 are not comparable to values in the 2019 Demolition Study. Exhibit RMP CAT-2 was prepared from an assessment of three facilities and interpolated to the remaining facilities. The 2019 Demolition Study assessed each generating facility individually. Exhibit RMP CAT-2 was prepared from an AACE Class 5 study. The 2019 Demolition Study was an AACE Class 3 study. Exhibit RMP CAT-2 was prepared with a focus on common plant facilities and limited individual units. The 2019 Demolition Study focused on individual units as well as all common plant facilities inside and outside the plant perimeter. The net cost of asset retirement obligations (ARO) increased during the time between the two studies. Site reclamation, owner’s cost and contractor indirects were not included in the study from which the Exhibit RMP CAT-2 was prepared. Please refer to Attachment DPU 3.1 which provides an updated version of Exhibit RMP CAT-2.