HomeMy WebLinkAbout20181212PAC to IIPA Attach Boise 001 WA JAM .xlsMacro
WelcomeDialog
CWC
Check
Factors
Inputs
Variables
Unadj Data for RAM
ECD
URO
ADJ
NRO
UTCR
Report
Results
NPC
Function1149
Function
Exhibit
Adjs2avg
ADJTOTAL
AdjustInput
AdjustSwitch
AverageFactors
AverageInput
AvgFactorCopy
CalcNewAllocationMethod
CapStructureType
Checksumavg
Checksumend
d756.
dad
Exhibit1102JAM
ExhibitRNEJAM
FACTOR
FactorCheck
FactorMethod
FranchiseTax
Func_Ftrs
FuncFac1
JurisNumber
l254105
LABORMOD
LABORROLL
LeadLag
LINKJAM
MSPAverageInput
MSPYearEndInput
NetToGross
PostDE
PostDG
PreDE
PreDG
PrintDetail
PrintDetail
PrintStateReport
PrintStateReport
PTDMOD
PTDROLL
PTMOD
PTROLL
ResourceSupplier
RevenueCheck
RevenueCheck1149
RevenueCheck2
SIT
TaxRates
TDMOD
TDROLL
UncollectibleAccounts
UtGrossReceipts
VariableCheck
WaRevenueTax
YearEndFactors
YearEndInput
YEFactorCopy
904CN
905CN
907CN
908CN
908OTHER
909CN
910CN
920SO
Customer Accts
A&G
Common Weighted Cost
Other Prod O&M
Other Deductions
Interest (AFUDC)
Depreciation Exp
MONTANA
WY-PPL
Accum Prov for Amort-Hydro
111IP
Total Plant
Capital Lease Reserve
D_Split
Price Change Required for Requested Return
903CN
DNPPHP
TROJP
SGCT
DGU
SNNP
Load Curtailment
ELECTRIC PLANT IN SERVICE
CA
OR
WA
MT
Sales to Ultimate Customers
Residential Sales
NUCLEAR PRODUCTION PLANT
Amortization Expense :
Amortization of Limited Term Plant
Seasonal System Generation Contracts
SSGC Factor
SSCC Factor
SSEC Factor
ACCMDITMA FACTOR
DOP
Total
Switch
MINING :
BEGINNING/ENDING
Beginning Ending Average Balance
DEU
50% Demand
TTL Dist Exp
Meter Reading Labor Split
Account 902
Ttl Cust Service
Source: FERC FORM 1 Page 322
Poles & Wires
Summary of Transmission Expense by Factor
108SP
METHODOLOGY:
FERC:
FACTOR:
8 OR 12 CP:
Common
UG Conduit
111HP
Seasonal System Generation Combustion Turbine
SSGCT
Rate Base Decrease
Interest on PCRBS
Requested Price Change
Other Expenses
System Net Intangible Plant
TOTAL GROSS PLANT (LESS SO FACTOR)
Customer Adv for Const
Customer Service Deposits
Total Coin. Peak
Total Input
501 DEP
Revenue Lead Days
Total OTH Electric Revenues
East Hydro Operation & Maintenance Expense
Other Generation Operation & Maintenance Expense
Other Purchased Power Contracts
SO2 Emission Allowances
Steam Depreciation Expense
DITBAL :
Amortization Exp
Control Area Energy Factors
CAEW
CAEE
Control Area Generation Factors
CAGW
ELECTRIC REVENUES YEAR END
Account Balances
Control Area Energy - West
Control Area Energy - East
Maint Supervision & Engineering
Maintenance of Structures
Maintenance of Boiler Plant
B15.5
B20.13
B15.7
B19.4
B19.7
B19.8
Less Non-Utility Plant
IP
CN
SE
SO
SG
SCHMDP-SO
Book Depreciation
GENERAL PLANT ACCUM DEPR Beg/End Avg
ACCUMULATED AMORTIZATION
Calculation of Taxable Income:
Operating Deductions:
O & M Expenses
Accum Depr - Capital Lease
Revenue Tax
Gross Receipts
Final Check
Levelized = 2 (If you select levelized enter desired R.O.E. on line 6)
Funtionalization Options:
TAXDEPR
Prime Movers
100% LF
Months
TS0
Franchise & Consent
Total Fuel Stock
Materials and Supplies
Stores Expense Undistributed
Factor Check
100% Demand
Separate Jurisdiction
75% Demand
Combined with Utah
DEMAND PERCENTAGE:
Summary of A&G Expense by Factor
Total A&G Expense by Factor
252CAGE
252CN
255ITC85
282CAGE
GENERAL PLANT(Excluding Mining)
Total Electric Interest Deductions for Tax
Division Net Plant Hydro - Pacific
DIT Expense
DITEXP
DIT Balance
DITBAL
ROE Selction
151CAEE
151CAEW
151JBE
154CAEE
154CAGE
154CAGW
154JBG
154SG
154SNPD
154SO
Nuclear Power Generation Year End
Earned Return on Rate Base
B1.1
B1.2
Step-up Transformers
T_SPLIT
COM_EQ
D_SPLIT
Distribution Slit between Functions
ANC
Hydro Production
Uncollectible Accounts
ARO
A&G Expenses Transferred
TOTAL O&M EXPENSE
Washington Annual Qualified Facilities Costs
Customer Adv.
586SNPD
Page 2.16, East only
DITBALRL
Customer
Weatherization Loans
Total Customer Service Expense by Factor
Customer 5
Customer 6
Customer 7
THIS SECTION OF THE FACTOR INPUT DEALS WITH THE DEMAND OF CHOLLA IV/APS
APS
SSCCH Factor
SSECH Factor
Rolled-In
Ut Off Sys
Days in
Data Input
Pacific
Utah
WYO
Miscellaneous Rate Base
Total Electric Plant
Rate Base Deductions:
Download Total
Mining Plant Accumulated Depr.
Less Centralia Situs Depreciation
OTHSG
G-DGP
G-DGU
G-SG
I-DGP
Uncollectible Percent
REVREQ
TOTAL SALES EXPENSE
Environmental Services Department
Deferred Debits - Situs
Deferred Debits - System Overhead
Operating Income
Net Operating Income
SCHMDT Amortization Expense
Operation Super & Engineering
MERGED COMPANY CAPITAL STRUCTURE
CAPITAL
Summary of Customer Service Exp by Factor
Office Supplies & expenses
Outside Services
Property Insurance
Injuries & Damages
SCHMAT Depreciation Expense
SCHMDEXP
INDICATOR
ACCOUNT
AMOUNT
CHECKSUM
ELECTRIC PLANT IN SERVICE Beg/End Avg
Customer Accounts
WY-ALL
Net to Gross Factor
B2.16
Revenue Requirement Department
TOTAL INTANGIBLE PLANT
Total Customer Advances for Constr.
TOTAL ACCUM DEF INCOME TAX
TOTAL PRODUCTION PLANT DEPR
Divisional Energy - Pacific
DEP
Less Current Operating Revenues
Increase to Current Revenues
L-T DEBT %
Total Customer Accounts Expense by Factor
STATE REPORT:
OTH
COMPANY
Regulatory Commission Expense
Total Experimental Plant
Total Production Expense by Factor
FERC-UP&L
NON-UTILITY
p205692
p244840
p244841
p223199
Purchase
(Renewed)
Douglas
Chelan
Grant
Wells
Rocky Reach
Wanapum
FERC
Utah
FERC
2 = YES
Pac
GENERAL :
SYSTEM NET GENERAL PLANT
B2.3
B2.4
B2.5
B2.6
B2.7
B2.8
B2.9
B2.10
B2.11
B2.12
B2.13
B2.14
B2.15
Off-System Sales
Subtotal
YEAR END RAW INPUT FROM JARS - "YEARENDINPUT"
System Net Nuclear Plant
TOTAL MISCELLANEOUS RATE BASE
TOTAL DISTRIBUTION PLANT
DATE:
TIME:
TYPE OF AVG:
Summary of General Plant by Factor
TOTAL SCHEDULE - M ADJUSTMENTS
NOTE:
Acct 406
TOTAL TAXES OTHER THAN INCOME
Total Plant Held For Future Use
Total Electric Plant Acquisition Adjustments
Total Nuclear Fuel
DEMAND %
Total Electric Operating Revenues
Land and Land Rights
Total O&M Expenses
Accumulated Deferred Income Taxes
TOTAL ACCUMULATED DEF INCOME TAX
Wyoming PPL
Oregon
Washington
Montana
Wyo-PP&L
WYP
UT
WYU
Generation Expense
Excise Tax (Superfund) Factor - EXCTAX
Trojan Allocators
ENERGY %
SSECT
SSECH
SSCCT
SSCCH
SSGCH
SSCP
SSEP
Seasonal System Capacity Combustion Turbine
Seasonal System Energy Combustion Turbine
Other Revenues - SE Factor
Accord
572CAGE
572CAGW
573SG
Premerger
Dec 1991 Plant
Dec 1992 Plant
Total Nuclear Production Plant
SCHMAT-SNP
Mid-Columbia
END OF REPORT
end
Total
California
MONTH
921SO
922SO
Hydraulic Power Generation
330CAGW
331CAGE
331CAGW
332CAGE
332CAGW
333CAGE
333CAGW
334CAGE
334CAGW
335CAGE
Ref. Page 1.2
Net Rate Base - Washington Jurisdiction
923SO
924SO
925SO
928CAGE
928CAGW
928SG
928SO
929SO
930SO
931SO
935SO
108GPCAEE
108GPCAGE
108GPCAGW
108GPCN
108GPJBG
108GPSO
108HPCAGE
108HPCAGW
108MPCAEE
108OPCAGE
108OPCAGW
108SPCAGE
108SPCAGW
108SPJBG
108TPCAGE
108TPCAGW
108TPJBG
108TPSG
111GPSO
Weighted Cost of Capital
OPRV-ID
Operating Revenue - Wyoming
OPRV-WY
Excise Tax - superfund
EXCTAX
INT
THIS SECTION OF THE FACTOR INPUT DEALS WITH THE MID COLUMBIA CONTRACTS
Seasonal Purchases
Total Cost -- $
Cholla IV****
Exchange****
Average
Idaho - PPL Factor
Business Centers
FEDERAL INCOME TAX
Federal Income Tax
Unclassified Gen Plant - Acct 300
592SNPD
TOTAL PRODUCTION PLANT
182MCAGE
182MCAGW
Customer Service Pacific factor - CNP
Customer Advances for Construction
Revenues
Total Revenues
Interdepartmental
Special Sales
TRANSMISSION PLANT YEAR END
TRANSMISSION PLANT Beg/End Avg
DISTRIBUTION PLANT YEAR END
p196538
B3.15
B4.1
B4.9
Unclassified Dist Plant - Acct 300
DS0
Unclassified Dist Sub Plant - Acct 300
TOTAL NET TRANSMISSION PLANT
108D00
108DS
Experimental Plant - Accum Depr
System Energy Factor
Percentage of Total (DITEXP)
Taxes other than Income Taxes
Income Taxes (Including Deferred Taxes)
Juris % by Division
peak
Washington Business Tax
WBTAX
Taxable Income
Total Transmission Plant by Factor
Other Accumulated Depreciation Reserve
East Hydro Accumulated Depreciation Reserve
Less: Uncollectibles (net)
COINCIDENT PEAK :
0% Demand
Description
Maint of Generation & Electric Plant
Annual Embedded Cost
Materials & Supplies
Schedule M Additions
Schedule M Additions - Permanent
Total Steam Production Plant by Factor
OREGON
Total Adjusted
Overhead Line Expenses
Meter O&M Split
Percent
D.I.T.
TOTAL DISTRIBUTION EXPENSE
Total Operating Expense
SNPPN
Steam
Acct 403.1
Meaningful Priority
Displacement
Surplus
System Net Transmission Plant
Modified Accord
Rolled-In
Rolled-In with Hydro Adj.
Rolled-In with Off-Sys Adj.
Trojan Plant Allocator
TOTAL ELECTRIC PLANT IN SERVICE
Total Elec. Interest Deductions for Tax
B8
Operating Revenue for Return
O&M
Land & Land Rights
Structures
Station Equipment
Poles & Towers
OH Conductors
Control Area Generation - East
WCA
ECA
Misc Revenue & Expense
404HP
282OTHER
391JBE
Other Generation Accumulated Depreciation Reserve
DISTRIBUTION PLANT ACCUM DEPR YEAR END
DISTRIBUTION PLANT ACCUM DEPR Beg/End Avg
OTH Interest Expense
Total of OTH Production Plant by Factor
Summary of Transmission Plant by Factor
Total Net Rate Base
Cash Working Capital
186MSG
186MSO
Misc Regulatory Assets
186M
CWC
Underground Conduit
TOTAL TRANSMISSION EXPENSE
Misc. Customer Service
MONTANA
WYOMING
Acct 403.4
Acct 403.5
C_SERVICE
Col. 3
Col. 4
TOTAL NET HYDRO PRODUCTION PLANT
OTHER :
TOTAL NET OTHER PRODUCTION PLANT
Revised Study (228)
December 1993 Adj.
Adjusted Acct 182.22
OTHSO
Other Electric Plant in Service
Functional Retail Revenue Spread
Amortization of Plant Acquisition Adj
B1.3
B1.4
B1.5
B1.7
B1.8
State of Washington
Miscellaneous Expenses
Interest on Customer Deposits
41110
ENERGY - MWH
APS
Cholla IV
Tools, Shop & Garage Equipment
Capital Leases
Hydro Electric Plant in Service
Customer 8
Customer 9
Customer 10
Customer 11
Customer 12
Deferred Debit - System Generation
WSF
CUST
T
Deferred Income Tax - Federal-CR
OP
Coolants and Water
Bad Debts Expense Allocation Factor - BADDEBT
Accessory Electric Equipment
TOTAL CUSTOMER SERVICE EXPENSE
CALIFORNIA
Unadjusted Results Input
Year End Balance
Maint of Street Lighting & Signal Sys.
Maintenance of Meters
B13
B11
Total Annual Embedded Costs
Differential
Revenue Requirement Impact
Customer Service Utah factor - CNU
Impact Housing Interest Income
CAPITAL STRUCTURE INFORMATION
SCHMDT-SG
Idaho-UP&L
Wyo-UP&L
FERC-UP&L
Intangible Plant
SCHMDT-SITUS
Total Hydraulic Plant by Factor
Misc Rate Base Deductions
Total Rate Base:
Misc Rate base
568SG
System Generation (Pac Costs on SG)
State Income Tax
Summary of Amortization by Factor
DOU
Other Production Plant Beg/End Avg
FUNCTION
PITA
AVERAGE BALANCE
Taxes OTH Than Income
SYSTEM NET PLANT PRODUCTION HYDRO
SYSTEM NET PLANT PRODUCTION NUCLEAR
Total Company
Hydro Depreciation
Pre-Merger Pacific
Pre-Merger Utah
P
PT
DPW
MONTANA
State Rate
Hydraulic Prod Plant Accum Depr
108OP
Other Revenues - SO Factor
General Plant - DGP Factor
T_Split
Customer System factor - CN
Trojan Decommissioning Allocator
Wy-PPL
WYU
Oregon
POLES & WIRES
403OP
Summary of Customer Accts Exp by Factor
Total Unclassified Plant by Factor
Accum Provision for Asset Acquisition Adjustments
DNPDP
DNPDU
Division Net Plant Distribution
25% Demand
Schedule M Additions - Temporary-SNP
SCHMAT-SO
Meter Expenses
UTAH
IDAHO-UPL
Other Power Generation Year End
SF Phosphates
Idaho
SYSTEM NET PLANT MINING UTAH
INTEREST
DIVISION NET PLANT DISTRIBUTION
Wyo-PP&L
Utah
Washington Water Power Co.
DEBT
Summary of Depreciation Expense by Factor
BUS
FUNC
Schedule M Deductions - Temporary-SO
Summary of Electric Plant by Factor
Nuclear
DG&T Working Capital Deposit
MISC RATE BASE DEDUCTIONS YEAR END
MISC RATE BASE DEDUCTIONS Beg/End Avg
DIT Expense (Modified Accord)
DITEXPMA
Other Production Plant
TRANSMISSION PLANT
DISTRIBUTION PLANT
GENERAL PLANT
INTANGIBLE PLANT
JAMLINKjars
Input Range for Firm Off-system
Oregon
Montana
Utah
Wyo-UP&L
Pacific
Juris
Brigham
Schedule "M" Addition
CUSTOMER ACCOUNTS EXPENSE
Account 228.42
Annual Mid-C Contracts Costs
All Other Generation Resources
500 - 514
(Gain) / Loss on Sale of Utility Plant
Income Taxes - Federal
Income Taxes - State
Income Taxes - Def Net
TYPE OF AVERAGE
PREFERRED
Bad Debt Expense
BADDEBT
MON
WYO
Hydro Plant ARO
Other Production ARO
Hydro Operation & Maintenance Expense
Hydro Depreciation Expense
404IP
Hydro Relicensing Amortization
Other
Rate Base Revenue Requirement
Accumulated Investment Tax Credit 1988
Misc. Power Plant Equipment
Customer 13
Deferred Income Tax - Expense
sales for resale peak at system
Accumulated Investment Tax Credit 1986
Puget Sound Power & Light
ACCORD
Schedule M Additions - Temporary-GPS
Total Other Production Plant
Maintenance of Line Transformers
LESS ACCUMULATED AMORTIZATION
TOTAL NET INTANGIBLE PLANT
SYSTEM NET INTANGIBLE PLANT
GROSS PLANT :
TOTAL GROSS PLANT
GP-S
Division Net Plant General-Mine - Utah
DNPGMU
Less Other Electric Items:
SCHMDT (Steam)
Portland General Electric
TAX CALCULATION:
FIT Model vs Booked
Trojan Plant
p206006
UBS
James River / Little Mountain Offset
Control Area Generation - West
Prepayments
Fuel Stock
Net to Gross Bump-Up
DEU
WESTERN CONTROL AREA - COINCIDENTAL PEAKS (Normalized)
B13.1
B13.15
B15.3
B11.1
B11.2
B14.1
B14.3
B15.4
B15.6
(Excl. West Hydro, Mid C, and QF)
546 - 554
TOTAL ADMINISTRATIVE & GEN EXPENSE
SYSTEM OVERHEAD FACTOR (SO)
Production
General
Mining
SNPI
SNPG
THIS SECTION OF THE FACTOR INPUT DEALS WITH THE DEMAND FACTOR
Provo Working Capital Deposit
Nuclear Production Plant Beg/End Avg
Deferred Investment Tax Credit - Idaho
SCHM's
UNCOLLECTIBLE
Electric Plant Acquisition Adjustments
Weatherization
ACCUMULATED DEPRECIATION AND AMORTIZATION
NET PLANT
SYSTEM NET PLANT FACTOR (SNP)
System Net Steam Plant
SYSTEM NET PLANT PRODUCTION OTHER
0% Energy
MISC RATE BASE DEDUCTIONS
General Plant - SITUS Factor
I-SITUS
TOTAL DEFERRED ITC
Federal Income Taxes + Other
Other Electric Revenue
PacifiCorp
Normalized Results of Operations
Col. 1
Col. 2
Increase Taxes Other Than Income
Uncollectible Expense
State Effective Tax Rate
Federal Income Tax Rate
Gross Receipts
Wy-UPL
Total Distribution
Total Production Plant
Total Transmission Plant
Underground Line Expense
B17.2
B17.4
Prod, Trans, Dist Plant
ACCUMULATED AMORTIZATION
B17.20
B18.1
B18.2
Customer Accounting Adj.
Summary of Unclassified Plant (Account 106)
Contributions in Aid of Construction
Factor %
Other Deferred Credits - Misc
East Hydro Electric Plant in Service
Wyoming UPL
Interest on Long-Term Debt
Amortization of Debt Disc & Exp
Amortization of Premium on Debt
FITOTH
FIT True-up
Federal Income Tax Per Books
TOTAL OPERATING EXPENSES
Operation Supervision & Engineering
Fuel Related
Steam Expenses
Steam From Other Sources
Electric Expenses
Steam Operation & Maintenance Expense
404M
System Generation
Misc. Nuclear Expenses
Maintenance Super & Engineering
Maintenance of Reactor Plant
Employee Pensions & Benefits
Schedule M Deductions - Temporary
Schedule M Deductions - Flow Through
FERC Fees
YEAR END BALANCE
ANNUAL EMBEDDED COSTS
WUTC Regulatory Fee
Distribution
REGULATOR
OTH Sales to Public Authority
ELECTRIC REVENUES
NORMALIZED RESULTS
Total Accumulated ITC
Total Operating Deductions for Tax
Deferred Income Tax - Federal-DR
Divisional Overhead - Pacific
PRODUCTION EXPENSE
Steam Power Generation
TOTAL PRODUCTION EXPENSE
Purchased Power
System Control & Load Dispatch
OTHSE
G
PTD
TRANSMISSION PLANT - PACIFIC
Ancillary Function
B_CENTER
UNADJUSTED RESULTS
Check Total
Revised Protocol Seasonal Resources
p206008
Ref. Page 2.1
CONSENSUS
DISTRIBUTION PLANT - UTAH
DIVISION NET PLANT DISTRIBUTION UTAH
Intangible Plant - SG Factor
Results
Intangible Plant - DGP Factor
Seasonal System Energy Cholla
INCOME BEFORE TAXES (FACTOR)
See Calculation of EXCTAX
Depreciation, Amortization & Misc Expense
OTH Deductions:
SNP
404OP
CUST905
Misc. Customer Acct. Exp.
Unclassified Trans Sub Plant - Acct 300
DIT Balance (Modified Accord)
BUSINESS
Schedule M Deductions - Temporary-SG
Debt
Embedded Cost
Seasonal System Energy Purchases
395CAGE
395CAGW
395JBG
395SO
396CAGE
396CAGW
396JBG
396SO
397CAEE
397CAGE
397CAGW
397CN
397JBG
397SO
398CAGE
398CAGW
398JBG
398SO
INDEGO
West Control Area
PACIFIC
PACIFIC
Schedule M Depreciation Factor
Preferred
Hydro O&M
System Generation (Utah Costs on SG)
WYE
ID
WYW
IDAHO-PPL
Total O&M Expense
B1
B2
B3
B4
B5
B7
B6
System Energy (kwh)
SSGC
Jim Bridger Generation
Jim Bridger Energy
JBE
Jim Bridger Plant Allocation:
East Control Area
Rent of Electric Property
WY-UPL
Amortization of Plant Acquisitions
WYO-PP&L
THIS SECTION OF THE FACTOR INPUT DEALS WITH THE ENERGY OF THE COMBUSTION TURBINES
SSECT Factor
FEDERAL INCOME TAXES - CALCULATION
Steam Production Plant
Misc
TOTAL ACCUM DEPR - PLANT IN SERV
TOTAL ACCUM PROV FOR AMORTIZ
?
X
DITEXPRL
OTHER PRODUCTION PLANT (EXCLUDES EXPERIMENTAL)
Total Miscellaneous Revenues
Tax Depreciation (Accord)
STEAM HEAT
DIT Expense (Accord)
Steam Depreciation
403NP
Hydraulic Production Plant Year End
Hydraulic Production Plant Beg/End Avg
PACIFICORP
Division Net Plant General-Mine - Pacific
ORE
WASH
Total Distribution Plant by Factor
TOTAL TRANS PLANT ACCUM DEPR
Plant Held for Future Use
Misc Deferred Debits
Elec Plant Acq Adj
Nuclear Fuel
Duplicate Charges
Other Revenues - SITUS
RETAIL
Accum Prov for Amort-Intangible Plant
DNPPSP
ITC90
Oregon Ancillary Services
(1)
(2)
(3)
501 DEU
501 SE
B4.11
General Plant - SG Factor
Amort of Prop. Losses, Unrecovered Plant, etc.
Acct 407
Total Amortization Expense :
Schedule M Amortization Factor
SCHMD
Depreciation Expense :
NUCLEAR :
Underground Conductors
Roads and Trails
TP
ACCUMULATED DEPRECIATION
B17.13
B17.18
Other Production Plant Year End
501CAEE
501JBE
501SE
Percentage of Total (DITBAL)
Tax Depreciation
Total Distribution Expense by Factor
Supervision
Total Taxable Income Excluding Other
Rents - Transmission
Actual = 1
DISTRIBUTION PLANT Beg/End Avg
GENERAL PLANT Beg/End Avg
Net LAG Days
Idaho
Electric Plant Acquisition Adjustment
System Gross Plant - Utah
SGPU
System Net Plant
DNPP
DNPU
Income Before State Taxes
Schedule M Additions - Permanent-SO
SCHMAT-GPS
NET PRODUCTION EXPENSE
West Hydro-Electric Resources
Mwh
$/Mwh
Total Amortization of Limited Term Plant
FERC
ACCT
TOTAL DEFERRED INCOME TAXES
SCHMAF
TOTAL NET DISTRIBUTION PLANT
USER SPECIFIC INFORMATION
Schedule M Deductions - Temporary-SNP
Reference
Increased Uncollectible Expense
Franchise Tax
Resource Supplier
Transmission Plant Accumulated Depr
ACCUMULATED DEPRECIATION
PRODUCTION PLANT YEAR END
Taxes Other - Revenue Tax
Taxes Other - Gross Receipts
Accumulated Investment Tax Credit 1989
SSGCT Factor
282DITBAL
282SG
282SO
283CAEE
165CAEE
165CAGE
165CAGW
165GPS
165SG
165SO
190BADDEBT
190CAEE
190CAEW
190CAGE
190CAGW
190JBE
190OTHER
190SE
190SG
190SO
190TROJD
Hydro Relicensing
Hydro Accumulated Depreciation Reserve
Account 904 Balance
Washington - Other
Acct 403.6
Summary of Revenues by Factor
S
Operating Deductions
B4.10
INTERNAL CHECKS
JURISDICTIONAL CAPITAL STRUCTURE
YEAR END BALANCES
BEGINNING / ENDING AVERAGE BALANCES
Misc. Equipment
Less Capital Leases
West Hydro Net Rate Base
Acct 403.7&8
B7.9
335CAGW
336CAGE
336CAGW
340CAGE
341CAGE
341CAGW
342CAGE
343CAGE
343CAGW
344CAGE
344CAGW
345CAGE
345CAGW
346CAGE
346CAGW
350CAGE
350CAGW
352CAGE
352CAGW
352JBG
353CAGE
353CAGW
353JBG
354CAGE
354CAGW
403GPCAEE
403GPCAGE
403GPCAGW
403GPCN
403GPJBG
403GPSG
403GPSO
403HPCAGE
403HPCAGW
403OPCAGE
Page 2.39, West only
Page 2.32, West only
GRID
Wheeling Revenue - Generation
Wheeling Revenue - Energy
WRG
WRE
399CAEE
2282SO
2283SO
West Hydro
East Hydro
Other Generation
Gas Generation
Coal Generation
Customer 1
Customer 2
Customer 3
Customer 4
SNPPO
System Net General Plant
TOTAL NET STEAM PLANT
Total Prepayments
FEDERAL RATE
STATE EFFECTIVE RATE
Total Misc. Deferred Debits
Total Customer Service Deposits
Schedule M Additions - Temporary-SITUS
Divisional Generation - Utah
INCOME BEFORE TAXES
INCOME BEFORE STATE TAXES
Customer 15
Customer 16
B3.7
B3.11
East Hydro Relicensing Accumulated Reserve
Communication Equipment Acct 397
All Other
392SO
DEMAND PERCENTAGE :
TOTAL
Misc Rate Base
Total Electric Plant:
Accum Prov For Deprec
Accum Def Income Tax
Customer Adv For Const
Unckassified Mine Plant
System Net Plant Distribution
Schedule M Deductions - Permanent- SO
SCHMDT-GPS
PRODUCTION EXPENSE YEAR END
ARO Reg Liability
Asset Retir. Oblig.
Other Msc. Df. Crd.
B19
B17
B18
x
LESS ACCUMULATED DEPRECIATION
Reg Liabilities - Insurance Provision
HP
Unclassified Hydro Plant - Acct 300
Variable Check
Gadsby CT**
West Valley CT**
**Source: Separate GRID run with off-system sales turned off
Operating Rev for Return
UTCR Total
TOTAL CUSTOMER ACCOUNTS EXP
TOTAL ADMINISTRATIVE & GEN EXP
.
Steam Plant ARO
System Generation Factor
ENERGY ALLOCATION NOTE
PACIFIC
SO-U
System Net Trans Plant-Total Co
SALES EXPENSE
ADMINISTRATIVE & GENERAL EXPENSE
DEPRECIATION EXPENSE
System Capacity Factor
Miscellaneous Other
186W
PACIFIC
UTAH
1 = NO
NP
Unclassified Nuclear Plant - Acct 300
FUNCTIONALIZATION
State Report Options:
Company
Division Net Plant Nuclear Utah
Account 182.22
Schedule M Additions - Flow Through
TOTAL CUSTOMER ACCOUNTS EXPENSE
Total Working Capital
Franchise Requirements
TOTAL GENERAL PLANT ACCUM DEPR
Nuclear Prod Plant Accumulated Depr
108HP
Deferred Hedge
Prov for Injuries & Damages
Prov for Property Insurance
TOTAL ACCUM DEPR - PLANT IN SERVICE
111SP
Accum Prov for Amort-Steam
111GP
Accum Prov for Amort-General
Total Deferred Taxes
SYSTEM NET PLANT TRANSMISSION
ACCUMDIT
Period Beginning
Combined Total
TOTAL REVENUE ALLOCATED
OTH Production Plant - Accum Depr
Return on Rate Base
OTHER
ADJUSTMENT
ADJ TOTAL
Hydraulic Production Plant
Operating Revenue - Idaho
Calif
Wash
Id PPL
588SNPD
589SNPD
590SNPD
591SNPD
Remove Capital Lease Amtr
Less Capital Lease
355CAGE
355CAGW
356CAGE
356CAGW
356JBG
356SG
357CAGW
358CAGW
359CAGW
Demonstration & Selling Expense
Advertising Expense
Debt Weighted Cost
Remove Capital Leases
392L
593SNPD
594SNPD
595SNPD
597SNPD
598SNPD
901CN
Accum Prov For Depr
Accum Prov For Amort
Accum Def Income Taxes
Total West Hydro Operating Expense
330 - 336
Wyo-UP&L
Pre-tax Return
STATE EQUITY RATES
CAP STRUCTURE
Nuclear Power Generation
DESCRIPTION
FACTOR
Ref
WYOMING
IDAHO
WYOMING
WASHINGTON
DONOTUSE
Other Revenues - Rolled-In SG Factor
Mont
Id UPL
Total of Prod Plant Depreciation by Factor
108TP
Trojan Decommssioning
TROJD
Income Before Taxes
IBT
Post-Merger Plant
Federal Income Tax
Page 2.7, West only
Page 2.15, West only
Page 2.16, West only
Allocated - in Thousands
NUCLEAR PRODUCTION PLANT - PACIFIC
TOTAL NUCLEAR PLANT
HYDRO :
Page 2.23, West only
Page 2.29, West only
Experimental Plant
Schedule M Adjustments
Page 2.29, East only
Page 2.24
Page 2.28
Page 2.36
Page 2.36, East only
Adjustments: Modified Accord - Year End Rate Base
ROR Results
Revenue
Overall Percent
Stanley
Summer
p167566
p172318
Deferred Investment Tax Credit - Fed
Amortization Reserve
DNPD & SNPD
Utah Annual Qualified Facilities Costs
Oregon Annual Qualified Facilities Costs
MISC RATE BASE ADDITIONS Beg/End Avg
Mining Depreciation Expense
UG Conductor
Schedule M Additions - Temporary-SO
403EP
Experimental Plant Depreciation
TOTAL DEPRECIATION EXPENSE
PEAK
DNPPNP
UNADJUSTED RESULTS OF OPERATIONS
ONLY
BALANCE BASED ON JURISDICTION
RESULTS OF OPERATIONS SUMMARY
Load Dispatching
Station Expense
Overhead Line Expense
Gross Receipts
TOTAL PRODUCTION PLANT DEPRECIATION
Misc Electric Revenue
Water Sales
OTH Electric Revenue
Storage Facility
Other Production Depreciation
403TP
TOTAL NET PRODUCTION PLANT
108DP
SNPP
System Net Hydro Plant
SNPPH
Forfeited Discounts & Interest
Indicator
Page 2.15, East only
Page 2.21
Page 2.23, East only
302CAGE
302CAGW
303CAEE
303CAGE
303CAGW
303CN
303SG
303SO
310CAGE
310CAGW
311CAGE
311CAGW
311JBG
312CAGE
312CAGW
312JBG
314CAGE
314CAGW
314JBG
315CAGE
315CAGW
315JBG
316CAGE
316CAGW
316JBG
330CAGE
Customer Billing
C_Meter
STEP_UP
B_Center
Demand Side Management
OREGON
B4.14
B5.8
Steam Production Plant Year End
DMSC
OTHSGR
Total Other Power Supply
Maintenance of Overhead Lines
SNPD
IDAHO
Operating Revenues:
COINCIDENT
CAL
RESULTS OF OPERATIONS
SGPP
580SNPD
581SNPD
582SNPD
583SNPD
585SNPD
DITEXP:
Additions - Temporary
YEAR-END BALANCE
4118SE
421SO
OTHER INT
NON-UTIL INT
Adjustments: West Control Area Allocation - Year End Rate Base
456CAGW
456SG
456WRG
500CAGE
500CAGW
500JBG
500SG
502CAGE
502CAGW
502JBG
505CAGE
505CAGW
505JBG
506CAGE
506CAGW
506JBG
507CAGE
507CAGW
507JBG
510CAGE
510CAGW
549SG
Currant Creek**
Postmerger Hydro Step I Adjustment
Adjusted Acct 228.42
SCHMA
Depreciation Expense
Amortization Expense
Taxes Other Than Income
Line Trans
Services
Meters
Inst Cust Prem
Leased Property
Other Operating Revenues
Overhead Conductors
Line Transformers
Towers and Fixtures
Nuclear Depreciation
403HP
(Accounts 101, 102, 106)
Reservoirs, Dams & Waterways
System Overhead (Pac Costs on SO)
Total Provision For Amortization by Factor
Impact Housing - Notes Receivable
Net Plant
Division Net Plant Nuclear Pacific
Page 2.5
Rate Base
Taxes Other - Resource Supplier
JARS Download less
Embedded Cost Differentials
Company Owned Hydro
Mid-C Contract
B14
Other Work. Cap.
Other A/R
A/P
System Generation (Pacific Costs on SG)
Page 2.15
Washington - SWIFT
Idaho - PPL
Idaho - UPL
302 & 186M
Total Interest Deductions for Tax
Interest & Dividends
Dist O&M
Maintenance of Misc. Other
Total Other Power Generation
TOTAL SCHEDULE - M ADDITIONS
SCHMDF
Deductions - Flow Through
SCHMDP
Customer Other
CSS_SYS
CSS System
CUST901
CUST903
252SG
Acct 403.9
Experimental
GROSS PLANT-SYSTEM FACTOR
PRODUCTION PLANT Beg/End Avg
Total Cost of Purchased Power
ROR
ROE
State Tax Rate
Adjusted
@
Requirement
Increase to
Increase
Non-Utility Portion of Interest
Total Non-utility Interest
Misc. Steam Expense
Rents
FERC
DDS6
DDSO6
B6.3
B6.5
B8.3
Uncollectible Rate
Adjustments: Modified Accord - Beg/End Avg Rate Base
B8.5
B8.6
B8.8
B8.12
Accum Investment Tax Credit 1988
ITC88
B2.17
B2.19
B2.21
B2.23
B2.24
B2.26
Total General Plant by Factor
Account Comparison
Accum Investment Tax Credit 1984
Office Furniture & Equipment
Transportation Equipment
Stores Equipment
Post-Merger Pacific
Post-Merger Utah
SO2 Emissions
System Overhead (Ut Costs on SO)
Total Other Working Capital
YEAR-END
ADJUSTMENTS
Pacific Division
Customer - Number
Customer - System
Customer - Pacific
CNP
Customer - Utah
-------
------------
Revenues Required to Earn Requested Return
Misc Deductions
Total Nuclear Power Generation
C_Service
DSM
PERIOD-ENDING
BEG-END
Operating Rev For Return:
Rate Base:
Electric Plant In Service
B17.8
Summary of Distribution Plant by Factor
Net Misc Revenue and Expense
DISTRIBUTION PLANT - PACIFIC
California
Federal Rate
Super Fund
COINCIDENT PEAKS:
TOTAL ACCUM PROV FOR AMORTIZATION
Period Date:
111HPCAGW
111IPCAEE
111IPCAGE
111IPCAGW
111IPCN
Miscellaneous Rate Base Deductions
NON-UTILITY INTEREST:
NON-UTILITY RELATED INTEREST PERCENTAGE
INTEREST FACTOR SNP - NON-UTILITY
Preferred Weighted Cost
Power Supply
Trans O&M
Operating Expenses:
Steam Production
Nuclear Production
Cholla Reclamation
Not Functionalized
FACTOR METHOD:
MODIFIED ACCORD
ROLLED-IN
Total Resources
Wyoming - East
Interest Deductions
182MSO
186MCAEE
186MCAGE
Public Street & Highway Lighting
DGP
SG-P
Meter Reading Expense
Amort of LT Plant - Capital Lease Gen
404SP
Amort of LT Plant - Cap Lease Steam
404IP
Amort of LT Plant - Intangible Plant
404MP
Total Customer Service Exp Including Sales
Administrative & General Salaries
Schedule M Additions - Temporary-SE
Ref. Page 1.3
Total Miscellaneous Expenses
Uncollectible
OREGON
Ancillary
LESS ACCUMULATED DEPRECIATION (incl hydro amortization)
Amort of Prop Losses, Unrec Plant, etc
TOTAL AMORTIZATION EXPENSE
Nuclear Production Plant Year End
Total Taxable Income
DNPGMP
System Gross Plant - Pacific
Fuel Holders, Producers & Accessories
B18.10
Oregon
Washington
Montana
Other Power Generation
Plant - Premerger
- Postmerger
399G
Unclassified Intangible Plant - Acct 300
Period Ending
12 Month Averaging Report
Poles, Towers & Fixtures
Roads, Railroads & Bridges
Intangible Plant - SITUS Factor
OTHSITUS
SCHMAP-SO
Accum Investment Tax Credit 1990
DNPD
Summary of Production Expense by Factor
Commercial & Industrial Sales
Summary of Prod Plant Depreciation by Factor
Summary of Amortization Expense by Factor
SPECIAL CONTRACTS - ENERGY
MWH
AMORTIZATION EXPENSE
System Overhead
Blank
MW
SCHMAP
Additions - Permanent
General Plant
Total Weatherization
Fuel Stock - Undistributed
111IPJBG
111IPSG
111IPSO
182MCAEE
Steam Accumulated Depreciation Reserve
Interest Synchronization
OPRVWY
Factor Method:
Type of Average:
Adjustments
Total Sales from Electricity
Water For Power
Accumulated Provision Acquisition Adjustment
Joint Owner WC Deposit
East Hydro Materials & Supplies
Excise Tax (Superfund)
Sales for Resale
Provision for Rate Refund
TOTAL SCHEDULE - M DEDUCTIONS
Unclassified OTH Prod Plant-Acct 300
SYSTEM NET PLANT DISTRIBUTION
MISC RATE BASE ADDITIONS
Misc Revenue & Expense
Total Operating Expenses
WCA - General 2007+
General/ Intangibles
Turbogenerator Units
Informational & Instructional Adv
Misc. Sales Expense
General Capital Leases
Total Amortization Expense by Factor
Unclassified Other Prod Plant-Acct 300
Net Coin. Peak
Net Energy
Input Range for Expected Owned
System Capacity
SC
Other Plant
System Energy
Contract
I-DGU
I-SG
BOOKDEPR
ESD
NONE
Maintenance of Misc. OTH
System Overhead (Pacific Costs on SO)
System Overhead (Utah Costs on SO)
WYP
DESCRIPTION OF FACTOR
STEAM :
Revenues Summary
Investment Tax Credit Adj.
SPECIAL CONTRACTS - DEMAND
B17.6
FERC METHOD :
Total of Other Production Plant by Factor
Idaho Annual Qualified Facilities Costs
WYU Annual Qualified Facilities Costs
WYP Annual Qualified Facilities Costs
California Annual Qualified Facilities Costs
Miscellaneous Revenues
546CAGW
Total OTH Power Supply
Transmission Plant
Distribution Plant
General Vehicles
Total Sales to Ultimate Customers
IDA
Regulatory Liability
Gain on Sale of Utility Plant - CR
CNU
Total Interstate Revenues
Maint of Misc. Distribution Plant
WY-EAST
WY-WEST
TOTAL RATE BASE DEDUCTIONS
Demand Percentage
STEP 5- SITUS TAX
Cust. Records & Coll. Exp.
Tax Depreciation (Modified Accord)
Other Power Supply Year End
SCHMDT-SO
Asset Retirement Obligations
ARO Regulatory Liability
DITEXPMA FACTOR
Gross Plant-System
GPS
Customer Service & Info
Acct 404
Acct 405
PRODUCTION EXPENSE SUMMARY
DISTRIBUTION EXPENSE
Total Transmission Expense by Factor
Schedule M Deductions - Temporary-SITUS
Utah Act
535 - 545
Amortization of Other Electric Plant
Total Operating Revenues
DESCRIP
Other Deferred Credits
Accumulated Deferred Income Taxes
Installations on Customers' Premises
Street Lights
DP
DISTRIBUTION :
B2.30
B2.31
B2.32
B2.33
B2.34
B2.35
B3.2
B3.4
B3.5
GENERAL PLANT ACCUM DEPR YEAR END
ELECTRIC PLANT IN SERVICE YEAR END
Company Owned Hydro - West
Account
Amount
Schedule M Deductions - Temporary-GPS
Customer Service
Sales
Administrative & General
Total O & M Expenses
Depreciation
Total Hydraulic Power Generation
Fuel
Total Sales Expense by Factor
Interest & Dividends (AFUDC-Equity)
Summary of Other Production Plant by Factor
Taxes Other
ITC
Interest
WYOMING-PPL
WY-UP&L
Situs
Other Production Plant - Accum Depr
108EP
LABOR
TD
MSS
DDSO2
DDS2
DEFSG
B8.18
B8.1
B10.2
B15.1
B16.31
B16.1
B16.29
Jurisdictional Contribution to Firm System Retail Coincidental Peaks - Normalized
Coincidental System Peaks Temperature Adjustment (Not Used)
Jurisdictional Energy - Normalized
Temperature Adjustment (Not Used)
OWC
Other Working Capital
Cash
TOTAL DISTRIBUTION PLANT DEPR
Summary of Distribution Plant Depr by Factor
Results with
Price Change
Return on Rate Base Requested
YEAR END
SCHMAEXP
Sub-Total
Net Operating Income
Transmission Split
External Factors
Internal Factors
182W
Energy Percentage
Nutil
Water Wheel, Turbines, & Generators
Schedule M Deductions
Schedule M Deductions - Permanent
ECD
THIS SECTION OF THE FACTOR INPUT DEALS WITH THE ENERGY FACTORS
-
Prop Ins
Inj & Dam
Unamortized ITC
TAX INFORMATION
TAX RATE ASSUMPTIONS:
TAX RATE
TOTAL PLANT IN SERVICE
Hydro Peak at time of system peak
Tax Rate
Federal Income Tax - Calculated
Adjustments to Calculated Tax:
PMI
Deductions - Permanent
Distribution Retail
Distribution Miscellaneous
Distribution Poles & Wires
Dec 1991 Reserve
Dec 1992 Reserve
Postmerger
PRODUCTION :
Amort of LT Plant - Other Plant
ACCMDIT
Other Power Supply
Transmission
Uncollectible Accounts:
Uncollectible Accounts %
(a) Uncollectible Accounts (FERC Account 904)
(b) General Business Revenues
(a) / (b)
Misc Power Plant Equipment
SP
Total Acct 228.42
Normalized
Net to Gross Bump-up
State Effective Rate
Allocation Version 9 / 2003
QF Biomass
Steam Prod Plant Accumulated Depr
108NP
TOTAL RATE BASE ADDITIONS
Accum Misc Oper Prov-Trojan
Common Embedded Cost
Difference
System Generation (Ut Costs on SG)
Steam Plant
Divisional Generation - Pacific
Nuclear Plant
Accum Hydro Relicensing Obligation
Total Depreciation Expense By Factor
404GP
Accessory Electric Plant
SCHMDT-SNP
Accumulated Investment Tax Credit 1990
Total Pk
System Capacity (kw)
TOTAL GENERAL PLANT
Steam Power Generation Year End
Schedule "M" Additions
General Vehicles Capital Leases
GP
Firm Off-system Data
Firm Off-system Data
TC NORMALIZED
Pre-Tax Cost of Capital
ITC84
Adjustments: MSP Allocation - Year End Rate Base
WESTERN WYOMING
Idaho State Income Tax
IDSIT
Total Qualified Facilities Costs
CIAC
PRODUCTION PLANT
CUSTOMER ACCOUNTS EXPENSE SUMMARY
Seasonal System Capacity Cholla
Seasonal System Generation Cholla
Seasonal System Capacity Purchases
EASTERN WYOMING
SCHMAT-SITUS
Transition Costs
Total Distribution Depreciation by Factor
108GP
General Plant Accumulated Depr
108MP
Total Generation - Embedded Cost Calculation****
****Source: GRID run included in case for normalized NPC
MC Factor
Wyoming - West
75% Energy
50% Energy
25% Energy
Hydro Relicensing Accumulated Reserve
Reactor Plant Equipment
Hydraulic Power Generation Year End
Misc. Customer Accounts Expense
Unrec Plant & Reg Study Costs
Total OTH Power Generation
OTH Expenses
Plant Held For Future Use
Street Lighting & Signal Systems
OTHER PRODUCTION PLANT (EXCLUDES EXPERIMENTAL)
SG-U
SO-P
Production / Transmission
Proportion
NET TRANSMISSION EXPENSE
Other Interest Expense
AFUDC - Borrowed
Transmission Depreciation
SSGCH Factor
East Hydro Relicensing Amortization
Total PC (Post Merger)
Nuclear Plant - Trojan
186MCAGW
541CAGW
552CAGW
553CAGW
Misc Deferred Debits-Trojan
OTH Production Depreciation
Amortization of OTH Electric Plant
Taxes OTH Than Income
Other Accounts Receivable
Accounts Payable
Idaho State Income Tax Allocation
Property
Steam Electric Plant in Service
East Hydro Relicensing
JBG
Revenue Lag Days
Other Revenues - SG Factor
Miscellaneous Intangible Plant
Amortization of Plant Acquisition Costs
Total All Other Operating Expenses
SYSTEM NET PLANT PRODUCTION STEAM
310 - 316
340 - 346
253.16 - 253.19
Total Deferred Taxes
Depreciation Reserve
Divisional Overhead - Utah
Total Other Electric Revenues
Amort of LT Plant - Mining Plant
B9
B10
B15
B16
GENERAL PLANT ACCUM DEPR
SCHMAT
Idaho - UPL Factor
State Specific
100 Basis Points in Equity:
Pre-merger (101)
Accumulated Investment Tax Credit 1985
Description of Account Summary:
Misc. Hydro Expenses
Rents (Hydro Generation)
Maintenance of Dams & Waterways
Maintenance of Misc. Hydro Plant
B2.27
B2.29
Less: Interstate Sales for Resale
Montana Power
Total Rate Base
Material & Supplies
Working Capital
Hydraulic Expenses
SCHMAT-SE
California
12 Months Ended September 2002
C_Billing
C_Metering
SNPT
System Net Production Plant
DEBT%
PREFERRED %
COMMON %
Laboratory Equipment
Power Operated Equipment
Communication Equipment
DNPPOU
Working Funds
DNPTP
Wholesale Sales Firm
Other Revenues - DGP Factor
Other Revenues - DGU Factor
Schedule M Additions - Temporary
Summary
West. Contrl CP Factor
Customer 14
389SO
Steam Production Plant Beg/End Avg
Hydro Adjustment Entry
Accum Amtr - Capital Lease
System Generation Cholla Transaction
Summary of Distribution Expense by Factor
DITBALMA
STEP 3-CONTRACTS
STEP 4-BPA
STEAM PRODUCTION PLANT
Resource Supplier Tax
Schedule "M" Deduction
Total Hydro Adjustment
Total Adj.
WCA - CAEE 2007+
WCA - CAGE 2007+
WCA - CAGW 2007+
Non Utility
390CAGE
390CAGW
390CN
TOTAL NET MINING PLANT
Labor/O&M
Total OTH Production Plant
Summary of OTH Production Plant by Factor
G-SITUS
Total General Depreciation by Factor
ERROR CHECK
CP ALLOCATION FACTOR
WIDCO Capital Lease
Remove Remaining Capital Leases
Morgan
Existing QF Contracts
MC
Storage Battery Equipment
CALCULATION OF INTERNAL FACTORS
Total Operating Deductions
COMMON
OTHER INFORMATION
540CAGE
540CAGW
542CAGE
542CAGW
543CAGE
543CAGW
544CAGE
544CAGW
545CAGE
545CAGW
546CAGE
548CAGE
548CAGW
549CAGE
549CAGW
550CAGE
550CAGW
552CAGE
553CAGE
554CAGE
554CAGW
556SG
557CAGE
557CAGW
557JBG
557SG
560CAGW
560SG
561CAGW
561SG
562CAGE
562CAGW
562JBG
East Hydro Depreciation Expense
S
Accum Investment Tax Credit 1989
ITC89
DITEXPRL FACTOR
ACCMDITRL FACTOR
DISTRIBUTION PLANT ACCUM DEPR
Division Net Plant Hydro - Utah
DNPPHU
Misc. Rate Base Deductions
Total Rate Base Deductions
GENERAL MINING PLANT - PACIFIC
UTAH
IDAHO
WYO
Division
403MP
Mining Depreciation
Accumulated Investment Tax Credit
Page 2.36, West only
WUTC Assessment
Accumulated Investment Tax Credit 1984
Revenue Requirement
Idaho Total
Payroll
(O&M + Taxes) / 365
PERIOD:
FILE:
PREPARED BY:
Retail Function
D
Distribution Only
MISC RATE BASE ADDITIONS YEAR END
394CAGE
STATE:
Regulator
ST#
STATE
RPT
STATE FACTOR
Divisional Energy - Utah
THIS SECTION OF THE FACTOR INPUT DEALS WITH THE DEMAND OF SEASONAL PURCHASE CONTRACTS
Input
City
MDU
PGE
Lead/Lag Study as of 03/03
Rate Base:
Electric Plant in Service
Operating Revenues
General Business Revenues
Gross Plant
Customers
MISC
LABOR/O&M
Prod
Dist
QF D.R. Johnson
QF Sunnyside
Ref. Page 2.2
Ref. Page 1.1
Total Distribution Plant
Total Account 370
East. Contrl CP Factor
ARO Depreciation
Loss on Sale of Utility Plant
Gain from Emission Allowances
Prov for Pensions and Benefits
Provisions
Duplicate Charges (incl 922)
Coal Mine
MP
399L
Miscellaneous OTH
Function
FIT
I
OTHDGP
OTHDGU
State Income Taxes
TOTAL STATE TAXES
Customer Installation Expenses
Misc. Distribution Expenses
Total Materials & Supplies
182M
Customer Assistance
Maintenance of Station Equipment
Total Utah Division
Total Steam Power Generation
Maintenance of Electric Plant
Maintenance of Misc. Steam Plant
FERC Method:
Summary of Steam Production Plant by Factor
EMBEDDED
WEIGHTED
STRUCTURE
COST
TC
Total Depreciation Expense :
394CAGW
394JBG
394SO
Total Accum Deferred Income Taxes
Negative Schedule M amounts increase taxable income and therefore increase tax expense.
Hydro Data Input
390SO
391CAEE
391CAGE
391CAGW
391CN
391JBG
391SO
392CAEE
392CAGE
392CAGW
INTANGIBLE PLANT - PACIFIC
Maintenance of Underground Lines
CALIFORNIA
403SP
EMBEDDED CAPITAL COST
Poles and Fixtures
Account 586 597
Pre-Merger DE
Post-Merger DE
Pre-Merger DG
Post-Merger DG
TOTAL DISTRIBUTION
Hydro - P
Situs General Business Revenues
Allocated Revenues
Total Operating Revenue
O&M Expense
Idaho-UP&L
Return on Equity
Daily Cost of Service
Customer Receipts & Collections
Transmission / Distribution
Federal Income Taxes
Direct Labor Expense
Deferred Income Tax - Balance
Variance
SSCCT Factor
Summary of General Depreciation by Factor
Other Deductions:
SYSTEM NET PLANT TRANSMISSION
MWh from GRID
Misc Revenue
Steam O&M
Nuclear O&M
Misc General Expenses
Page 2.39, East only
Page 2.34
Lead/Lag Study as of 12/91
Other Revenues - Situs
Retail
TOTAL TRANSMISSION PLANT
Schedule "M" Deductions
THIS SECTION OF THE FACTOR INPUT DEALS WITH THE DEMAND OF THE COMBUSTION TURBINES
DIVISION NET PLANT DISTRIBUTION PACIFIC
Amortization
Misc Revenue & Expense
Total Operating Expenses:
Summary of Nuclear Production Plant by Factor
Total Nuclear Plant by Factor
Other Generation Depreciation Expense
Distribution Depreciation
100% Energy
System Generation Factor
Operating Revenue
Other Sales to Public Authority
HYDRO PRODUCTION PLANT
Page 2.17
Page 2.38, East only
Page 2.31
Page 2.32
Page 2.7, East only
Page 2.8
GRID less QF and Mid-C
Page 2.4
SYSTEM NET PRODUCTION PLANT
TRANSMISSION :
General Depreciation
403GV0
Received
Transmission of Electricity by Others
Misc. Transmission Expense
902CN
Organization
Gain from Disposition of NOX Credits
Mid C Contracts
Qualified Facilities
General Plant - DGU Factor
Maintenance of Misc Nuclear
CUSTOMER SERVICE EXPENSE
TAX RATE ASSUMPTIONS
Pen & Ben
Ins Prov
513JBG
514CAGE
514CAGW
514JBG
535CAGE
535CAGW
536CAGW
537CAGE
537CAGW
539CAGE
539CAGW
510JBG
511CAGE
511CAGW
511JBG
512CAGE
512CAGW
512JBG
513CAGE
513CAGW
C_METER
Customer Metering
TOTAL NET GENERAL PLANT
GENERAL MINING PLANT
SNPM
Mining Plant
Expense Lag Days
Net Lag Days
Less Capital Lease Reserve
Unclassified Steam Plant - Account 300
Total Steam Production Plant
Adjustments: Selected Section
Total Acct 182.22
Acct 403.2
Hydro
Acct 403.3
Check
Figure
TAX GROSS UP FACTOR
Maint of Misc. Transmission Plant
Other Electric
Non-Utility
NUTIL
System Net Steam Plant-Total Co
SNPPS
INTANGIBLE :
MT Border
Loads
Street Lighting
403GP
Operating Expenses:
Customer Accounting
Structures and Improvements
Income Before Tax
James River Adj (Tab 5)
Intangible Plant - DGU Factor
Boiler Plant Equipment
Summary of Intangible Plant by Factor
Total Intangible Plant by Factor
563CAGE
563CAGW
566CAGE
566CAGW
566SG
567CAGE
567CAGW
567SG
568CAGW
569CAGE
569CAGW
569SG
570CAGE
570CAGW
570JBG
570SG
571CAGE
571CAGW
571SG
283SNP
283SO
283CAGE
283CAGW
283GPS
283OTHER
CAGE
Post-merger (101)
Total Hydraulic Plant
Summary of Hydraulic Plant by Factor
Trans
Positive Schedule M amounts reduce taxable income and therefore reduce tax expense.
Additions - Flow Through
Grant Reasonable Portion
Grant Reasonable
Total Cost of MidC Contracts
Pre-Merger - PPL
Prod / Hydro
Malin
Pre-Merger - UPL
Post-Merger (Vintages beginning 2006 and forward except for WCA which is 2007 and forward)
Total PPL
Total UPL
Prod / Other Prod
Cholla Unit 4
Gadsby Unit 4, 5 & 6
Hydro-PPL
Hydro-UPL
WCA - JBG 2007+
Total Post Merger
Total Post Merger
Production _CAGW
Production _CAGE
Production_JBG
Acquisition Adjustment, CAGE
Transmission_SG
Transmission_CAGW
Transmission_CAGE
Transmission_JBG
TAXDEPR Factor
403OPCAGW
403SPCAGE
403SPCAGW
403SPJBG
403TPCAGE
403TPCAGW
403TPJBG
403TPSG
Hydro - U
Amortization Expense
Taxes Other Than Income
Hydro Plant
Nuclear Fuel Expense
B6.1
B7.2
B7.6
B7.8
B6.2
System Net Other Production Plant
Maintenance of General Plant
DNPPSU
B2.1
B2.2
Nutility
393CAGE
393CAGW
Clearing and Grading
Accum Investment Tax Credit 1985
ITC85
Accum Investment Tax Credit 1986
ITC86
SNPPH-P
SNPPH-U
System Net Hydro Plant-Pacific
System Net Hydro Plant-Utah
DIT Expense
Tax Depreciation
282CAEE
ELECTRIC REVENUES BEG/END AVG
Total Pacific Division
Utah Division
WASHINGTON
408GPS
MSP Existing QF Contracts****
MSP Mid-C Contracts****
Federal /State Combined
FEDERAL/STATE COMBINED RATE
SCHMDT
Deductions - Temporary
Generators
Negative Schedule M amounts decrease taxable income and therefore increase tax expense.
Unclassified Trans Plant - Acct 300
447NPC
Sales for Resale - NPC
501NPC
503NPC
Steam From Other Sources-Non-NPC
Steam From Other Sources-NPC
547NPC
Fuel-Non-NPC
Fuel-NPC
Purchased Power - NON NPC
555NPC
Purchased Power-NPC
565NPC
Transmission of Electricity by Others - NON NPC
Transmission of Electricity by Others-NPC
Revenue:
Expenses:
WA Allocated
Total NPC
Net Power Costs
Sales for Resale-Non NPC
Sales for Resale-NPC
Total Sales for Resale
Total Fuel Related
Total Purchased Power
Total Transmission of Electricity by Others
547NPCCAEW
501CAGW
550SG
AVERAGE OF MONTHLY AVERAGE FACTORS
447NPCCAGW
555NPCCAEW
555NPCWA
555NPCCAGW
565NPCCAGW
501NPCCAEW
Total Schedule M Differences (PowerTax)
WCA_CAGW 2007+ -Marengo
WCA CAGW 2007+ -Goodnoe
Oregon Extra Book Depreciation
OREGON EXTRA BOOK DEPR
GROSS PLANT-SYSTEM FACTOR
Pre-merger (101)
Revised Study (228)
Post-merger (101)
Customer Factors 1
Total Electric Billings
Pacific Division Billings
Utah Division Billings
1) The CN factor is calculated based off number of billings not customers
Customer Factors 1
151SE
252CAGW
281SG
282CAGW
282SE
25318CAGE
560CAGE
561CAGE
562SG
568CAGE
571JBG
Mining/Fuel Tax Credit
Production Tax Credit
State Tax Credits
Credits
SCHMATSO
SCHMATJBE
SCHMATSG
SCHMATSNPD
SCHMATCAEE
SCHMATCAGE
SCHMATCAGW
SCHMDPSO
SCHMDTJBE
SCHMDTSO
SCHMDTCAGW
41010SG
41010JBE
41010SO
41010SE
41010OTHER
41010CAGE
41010CAGW
41010CAEE
41110SO
41110OTHER
41110JBE
41110SG
41110SNPD
41110SNP
41110CAGE
41110CAEE
41110BADDEBT
41110CAGW
GPSO
IPSO
OPCAGE
SPCAGE
SPSG
TPCAGE
TPCAGW
TPSG
165CAEW
Accum Misc Oper Provisions - Other
Fed. Credit
557JBE
SCHMATSE
41010CAEW
41010SNPD
Page 1.1
OPSG
41110GPS
573CAGE
921CN
935CN
421CAGW
12 Coincident Peaks
8 Coincident Peaks
75% Demand
25% Energy
Page 1.2
Page 1.3
355JBG
190SNPD
40910CAGW
PUC Fees Based on General Business Revenues
105CA
105CAEE
105CAGE
105CAGW
105OR
105SE
105UT
105WYP
106SG
114CAGE
115CAGE
124CA
124ID
124MT
124OR
124OTHER
124SO
124UT
124WA
124WYP
124WYU
154CA
154CAEW
154ID
154OR
154SNPPS
154UT
154WA
154WYP
154WYU
163SO
165ID
165OR
165OTHER
165UT
165WA
165WYP
165WYU
190CA
190ID
190MT
190OR
190SNP
190UT
190WA
190WYP
252CA
252ID
252OR
252UT
252WA
252WYP
252WYU
254CA
254
254ID
254OR
254OTHER
254SE
254SO
254UT
254WA
254WYP
254WYU
255ITC84
255ITC86
255ITC88
255ITC89
255ITC90
255SG
281CAGW
282FERC
282ID
282OR
282UT
282WYP
283CA
283ID
283JBE
283OR
283SE
283SG
283TROJD
283UT
283WA
283WYP
283WYU
302ID
302UT
303CA
303ID
303JBG
303OR
303UT
303WA
303WYP
310JBG
340CAGW
340OR
342CAGW
350JBG
350SG
352SG
353SG
354JBG
354SG
355SG
357CAGE
358CAGE
359CAGE
359SG
360CA
360ID
360OR
360UT
360WA
360WYP
360WYU
361CA
361ID
361OR
361UT
361WA
361WYP
361WYU
362CA
362ID
362OR
362UT
362WA
362WYP
362WYU
364CA
364ID
364OR
364UT
364WA
364WYP
364WYU
365CA
365ID
365OR
365UT
365WA
365WYP
365WYU
366CA
366ID
366OR
366UT
366WA
366WYP
366WYU
367CA
367ID
367OR
367UT
367WA
367WYP
367WYU
368CA
368ID
368OR
368UT
368WA
368WYP
368WYU
369CA
369ID
369OR
369UT
369WA
369WYP
369WYU
370CA
370ID
370OR
370UT
370WA
370WYP
370WYU
371CA
371ID
371OR
371UT
371WA
371WYP
371WYU
373CA
373ID
373OR
373UT
373WA
373WYP
373WYU
389CA
389CAGE
389CN
389ID
389OR
389UT
389WA
389WYP
389WYU
390CA
390CAEE
390ID
390JBG
390OR
390UT
390WA
390WYP
390WYU
391CA
391ID
391OR
391UT
391WA
391WYP
391WYU
392CA
392ID
392JBG
392OR
392UT
392WA
392WYP
392WYU
393CA
393ID
393JBG
393OR
393SO
393UT
393WA
393WYP
393WYU
394CA
394CAEE
394ID
394OR
394UT
394WA
394WYP
394WYU
395CA
395ID
395OR
395UT
395WA
395WYP
395WYU
396CA
396CAEE
396ID
396OR
396UT
396WA
396WYP
396WYU
397CA
397ID
397OR
397SG
397UT
397WA
397WYP
397WYU
398CA
398CAEE
398CN
398ID
398OR
398UT
398WA
398WYP
398WYU
2281SO
18222OR
18222TROJD
18222TROJP
18222WA
22841CAEE
22841CAGW
22842TROJD
25316CAEE
25317CAEE
25318SNPPS
25325CAEE
25399CA
25399CAEE
25399CAEW
25399CAGE
25399CAGW
25399ID
25399OR
25399OTHER
25399SG
25399SO
25399UT
25399WA
25399WYP
25399WYU
108360CA
108360ID
108360OR
108360UT
108360WA
108360WYP
108360WYU
108361CA
108361ID
108361OR
108361UT
108361WA
108361WYP
108361WYU
108362CA
108362ID
108362OR
108362UT
108362WA
108362WYP
108362WYU
108364CA
108364ID
108364OR
108364UT
108364WA
108364WYP
108364WYU
108365CA
108365ID
108365OR
108365UT
108365WA
108365WYP
108365WYU
108366CA
108366ID
108366OR
108366UT
108366WA
108366WYP
108366WYU
108367CA
108367ID
108367OR
108367UT
108367WA
108367WYP
108367WYU
108368CA
108368ID
108368OR
108368UT
108368WA
108368WYP
108368WYU
108369CA
108369ID
108369OR
108369UT
108369WA
108369WYP
108369WYU
108370CA
108370ID
108370OR
108370UT
108370WA
108370WYP
108370WYU
108371CA
108371ID
108371OR
108371UT
108371WA
108371WYP
108371WYU
108373CA
108373ID
108373OR
108373UT
108373WA
108373WYP
108373WYU
111390OR
111390SG
111390SO
111390WYP
254105TROJP
1011390CAGE
1011390CAGW
1011390OR
1011390SO
1011390UT
1011390WYP
108DPCA
108DPID
108DPOR
108DPUT
108DPWA
108DPWYP
108DPWYU
108GPCA
108GPID
108GPOR
108GPUT
108GPWA
108GPWYP
108GPWYU
108HPOTHER
108SPCAEE
108SPID
108SPUT
108SPWYP
111GPCA
111GPID
111GPOR
111GPUT
111GPWA
111GPWYP
111GPWYU
111IPID
111IPOR
111IPUT
111IPWYP
182MCA
182MID
182MJBG
182MOR
182MOTHER
182MUT
182MWA
182MWYP
182MWYU
182WCA
182WID
182WOTHER
182WUT
182WWYP
182WWYU
186MCAEW
186MID
186MOR
186MOTHER
186MWA
186WOTHER
DPCA
DPID
DPOR
DPSG
DPSNPD
DPUT
DPWA
DPWYU
GPCAGE
GPCAGW
OPCAGW
SPCAGW
TPCAEE
406CAGE
407ID
407OR
407OTHER
407WA
408CA
408CAEE
408CAGE
408OR
408SE
408SO
408UT
408WA
408WYP
419SNP
421OR
421OTHER
421UT
421WA
421WYP
427SNP
428SNP
429SNP
431SNP
432SNP
440CA
440ID
440OR
440OTHER
440UT
440WA
440WYP
440WYU
442CA
442ID
442OR
442OTHER
442UT
442WA
442WYP
442WYU
444CA
444ID
444OR
444OTHER
444UT
444WA
444WYP
444WYU
445OTHER
445UT
447FERC
447OR
447SG
450CA
450ID
450OR
450UT
450WA
450WYP
450WYU
451CA
451ID
451OR
451SO
451UT
451WA
451WYP
451WYU
454CA
454CAGE
454CAGW
454ID
454JBG
454OR
454SG
454SO
454UT
454WA
454WYP
454WYU
456CAGE
456ID
456JBG
456OR
456OTHER
456SO
456UT
456WA
456WRE
456WYP
549OR
550OR
555OTHER
555
557ID
557OR
557UT
557WA
580CA
580ID
580OR
580UT
580WA
580WYP
582CA
582ID
582OR
582UT
582WA
582WYP
583CA
583ID
583OR
583UT
583WA
583WYP
583WYU
584OR
584UT
586CA
586ID
586OR
586UT
586WA
586WYP
586WYU
587CA
587ID
587OR
587UT
587WA
587WYP
587WYU
588CA
588ID
588OR
588UT
588WA
588WYP
588WYU
589CA
589ID
589OR
589UT
589WA
589WYP
589WYU
590CA
590ID
590OR
590UT
590WA
590WYP
591CA
591ID
591OR
591UT
591WA
591WYP
591WYU
592CA
592ID
592OR
592UT
592WA
592WYP
592WYU
593CA
593ID
593OR
593UT
593WA
593WYP
593WYU
594CA
594ID
594OR
594UT
594WA
594WYP
594WYU
595CA
595ID
595UT
595WA
595WYU
596CA
596ID
596OR
596UT
596WA
596WYP
596WYU
597CA
597ID
597OR
597UT
597WA
597WYP
597WYU
598CA
598ID
598OR
598UT
598WA
598WYP
901OR
902CA
902ID
902OR
902UT
902WA
902WYP
902WYU
903CA
903ID
903OR
903UT
903WA
903WYP
903WYU
904CA
904ID
904OR
904UT
904WA
904WYP
904WYU
908CA
908ID
908OR
908UT
908WA
908WYP
909CA
909ID
909OR
909UT
909WA
909WYP
909WYU
920CA
920OR
920UT
920WA
921CA
921ID
921OR
921UT
921WA
921WYP
921WYU
923CA
923ID
923OR
923UT
923WA
923WYP
923WYU
924ID
924OR
924UT
924WYP
925OR
928CA
928ID
928OR
928UT
928WA
928WYP
930CA
930ID
930OR
930UT
930WA
930WYP
930WYU
931CA
931ID
931OR
931UT
931WA
931WYP
935CA
935ID
935OR
935UT
935WA
935WYP
935WYU
40910IBT
40911IBT
41140DGU
403360CA
403360ID
403360OR
403360UT
403360WA
403360WYP
403360WYU
403361CA
403361ID
403361OR
403361UT
403361WA
403361WYP
403361WYU
403362CA
403362ID
403362OR
403362UT
403362WA
403362WYP
403362WYU
403364CA
403364ID
403364OR
403364UT
403364WA
403364WYP
403364WYU
403365CA
403365ID
403365OR
403365UT
403365WA
403365WYP
403365WYU
403366CA
403366ID
403366OR
403366UT
403366WA
403366WYP
403366WYU
403367CA
403367ID
403367OR
403367UT
403367WA
403367WYP
403367WYU
403368CA
403368ID
403368OR
403368UT
403368WA
403368WYP
403368WYU
403369CA
403369ID
403369OR
403369UT
403369WA
403369WYP
403369WYU
403370CA
403370ID
403370OR
403370UT
403370WA
403370WYP
403370WYU
403371CA
403371ID
403371OR
403371UT
403371WA
403371WYP
403371WYU
403373CA
403373ID
403373OR
403373UT
403373WA
403373WYP
403373WYU
403GPCA
403GPID
403GPOR
403GPUT
403GPWA
403GPWYP
403GPWYU
404GPCA
404GPID
404GPOR
404GPSO
404GPUT
404GPWA
404GPWYP
404HPCAGW
404IPCAEE
404IPCAGE
404IPCAGW
404IPCN
404IPID
404IPJBG
404IPOR
404IPOTHER
404IPSG
404IPSO
404IPUT
404IPWYP
40910SO
SCHMAPBADDEBT
SCHMAPSCHMDEXP
SCHMAPSO
SCHMATBADDEBT
SCHMATCA
SCHMATCIAC
SCHMATGPS
SCHMATID
SCHMATOR
SCHMATOTHER
SCHMATSCHMDEXP
SCHMATSNP
SCHMATUT
SCHMATWA
SCHMATWYP
SCHMATWYU
SCHMDPCA
SCHMDPSCHMDEXP
SCHMDPSG
SCHMDPSNP
SCHMDTCA
SCHMDTDGP
SCHMDTGPS
SCHMDTID
SCHMDTOR
SCHMDTOTHER
SCHMDTSE
SCHMDTSG
SCHMDTSNP
SCHMDTSNPD
SCHMDTTAXDEPR
SCHMDTTROJD
SCHMDTUT
SCHMDTWA
SCHMDTWYP
SCHMDTWYU
40910CAEE
40910JBE
40911CAGE
SCHMAPCAEE
SCHMAPJBE
SCHMDPCAEE
SCHMDPCAGW
SCHMDPJBE
SCHMDTCAEE
SCHMDTCAGE
41010CA
41010GPS
41010ID
41010OR
41010SNP
41010TAXDEPR
41010UT
41010WA
41010WYP
41110CA
41110CIAC
41110FERC
41110ID
41110OR
41110SCHMDEXP
41110UT
41110WA
41110WYP
41110WYU
41010WYU
143SO
143
230OTHER
230
232
232OTHER
232SO
232CAEE
928CAEE
186MJBE
359JBG
Accum. - WA Accel. Depr Reserves
- Postmerger
Check to
Account Detail
Total Accum Provision for Asset Acq. Adj.
Total Materials and Supplies - FERC 154
Total Materials & Supplies (Net)
B20
406UT
453CAGE
501CA
501CAEW
501OR
501WYP
595OR
901UT
905UT
920WYP
924CA
114UT
115UT
395CAEE
2283JBE
25335CAEE
108GPSG
GPSG
TPSO
254CAEE
254CAGE
40910CAGE
282CA
282CIAC
282SNP
282SNPD
282WA
555WA
282JBG
427S
Ref. 4.8.1. Line 2
Ref. 4.8.1. Line 6
Notes:
Total Company results only include West Control Area net power costs.
The overall rate of return above has been rounded to two decimals.
All components of the capital structure in the table above are consistent with Order 12 in UE-152253 issued 9-1-2016.
AVERAGE OF MONTHLY AVERAGES
ENERGY PERCENTAGE:
AVG OF MTHLY AVG RAW INPUT FROM JARS - "AVERAGEINPUT"
Adjustments: West Control Area Allocation - Avg Rate Base
Adjustments: MSP Allocation - Avg Rate Base
YEAR END FACTORS
CHECK
CK TO UNADJ BAL.
AVERAGE-OF-MONTHLY-AVERAGES
MSP
282JBE
506SG
557WYU
567JBG
584WYP
598WYU
926CA
926OR
926SO
926UT
926WYP
2281ID
2281OR
2281OTHER
2281UT
2281WYP
2282OR
TPCA
551CAGE
Federal Income Tax @ 21.00%
WA JAM December 2017 Result
447UT
901WA
905OR
404IPCA
190FERC
190WYU
254FERC
111IPCA
Lead/Lag Study as of 12/15
283S
41110S
440S
442S
444S
904S
909S
930S
ACCOUNTS
SCHMATS
108360S
108361S
108362S
108364S
108365S
108366S
108367S
108368S
108369S
108370S
108371S
108373S
108DPS
108GPS
108MPJBE
108SPS
111GPCN
111GPS
111IPS
154S
165S
182MS
182MSE
190CN
190S
235S
252S
25398S
282CN
282NUTIL
282S
303S
312S
360S
361S
362S
364S
365S
366S
367S
368S
369S
370S
371S
373S
389S
390S
391S
392S
393S
394S
395S
396S
397S
398S
399JBE
403360S
403361S
403362S
403364S
403365S
403366S
403367S
403368S
403369S
403370S
403371S
403373S
403GPJBE
403GPS
404IPS
408S
41010CN
41010JBG
41010S
4118S
4311S
447NPCCAEW
548SG
549S
555NPCS
557CAEE
557S
557SO
560JBG
565NPCCAEW
580S
588S
593S
903S
908S
920S
923CAGE
923CAGW
923S
923SG
925S
928S
935S
CWCS
OWC143SO
OWC232CAEE
OWC232CAGE
OWC232S
OWC232SO
OWC2533CAEE
OWC2533CAGE
OWC254105CAEE
OWC254105CAGE
SCHMATCN
SCHMATJBG
SCHMDTJBG
SCHMDTS
DPS
407S
421CAGE
421S
930CN
909CAGE
909CAGW
930CAGW
588SG
2533
2533CAGE