Loading...
HomeMy WebLinkAbout20181212PAC to IIPA Attach 1a AWEC Set 2.doc TEL (503) 241-7242 ● FAX (503) 241-8160 ● jog@dvclaw.com Suite 450 1750 SW Harbor Way Portland, OR 97201 November 20, 2018 Via Huddle Data Request Response Center PacifiCorp 825 NE Multnomah Street, Suite 2000 Portland, OR 97232 Re: In the Matter of PACIFICORP, dba PACIFIC POWER, Application for Authority to Implement Revised Depreciation Rates Docket No. UM 1968 Data Request Response Center: Enclosed please find the Alliance of Western Energy Consumers’ (“AWEC”) Second Set of Data Requests to PacifiCorp in the above-referenced docket. PacifiCorp has fourteen days to respond to these Data Requests. Please post your responses to the Huddle workspace by no later than December 4, 2018. Please note that AWEC’s data requests are continuous in nature and require you to update any previous data responses as soon as new responsive information or documents become available. Thank you for your attention to this matter. If you have any questions, please do not hesitate to call. Sincerely, /s/ Jesse O. Gorsuch Jesse O. Gorsuch Enclosure BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1968 In the Matter of PACIFICORP, dba PACIFIC POWER Application for Authority to Implement Revised Depreciation Rates. ) ) ) ) ) ) ) ALLIANCE OF WESTERN ENERGY CONSUMERS’ SECOND SET OF DATA REQUESTS TO PACIFICORP Dated: November 20, 2018 Please post your responses to Huddle by December 4, 2018. DATA REQUESTS Please provide PacifiCorp’s 2017 results of operations in Excel format with all links and formulas intact.  Reference PAC/202, Spanos/43-44:  For each production plant identified in the life span tables on the referenced pages, please identify the total embedded cost of the resource in 2015, 2016, 2017.  Please detail the embedded cost by FERC account. Please provide total-Company actual net power costs detailed on a monthly basis for calendar years 2008 through 2017. Please include the database entries and all fuel supply cost calculations for the period in their native format, including any mapping necessary to assign the database and fuel accounts to line items in the power cost report, as well as all links between the database and fuel data to the actual net power cost report. Please provide total-Company actual net power costs in the manner described in AWEC Data Request No. 0024, but for calendar years 2018 and 2019 through the most recent month available. Please update this report and the underlying data on a monthly basis through the pendency of this proceeding. Please provide a copy of PacifiCorp’s most recent 10-year business plan, including all supporting workpapers with all links and formulas intact.  Please provide access to the GRID model used to develop PacifiCorp’s most recent 10-year business plan, including all input and output workpapers that are used to develop the forecast. PAGE 1 – AWEC’S SECOND SET OF DATA REQUESTS TO PACIFICORP