Loading...
HomeMy WebLinkAbout20181031Staff 1-11 to PAC.pdfEDWARD JEWELL DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-03t4 IDAHO BAR NO. 10446 F"ECEIVED ::tXllfl'1I 3l Pt{ 2: 35 ', r'r, i ,j.'-rjtstct't Street Address for Express Mail 472W. WASHINGTON BOISE, IDAHO 83702-5918 Attorneys for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER FOR AUTHORIZATION TO CHANGE DEPRECIATION RATES APPLICABLE TO ELECTRIC PROPERTY. CASE NO. PAC.E.18.O8 FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO ROCKY MOUNTAIN POWER The Staff of the Idaho Public Utilities Commission, by and through its attomey of record, Edward Jewell, Deputy Attorney General, requests that Rocky Mountain Power provide the following documents and information as soon as possible, but no later than WEDNESDAY, NOVEMBER 21,2018. This Production Request is to be considered as continuing, and Rocky Mountain Power is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of FIRST PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER ) ) ) ) ) ) ) ) ) I ocroBER 31,2018 the person preparing the documents. Please identify the name, job title, location and telephone number of the record holder. In addition to the written copies provided as response to the requests, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 1: Regarding the Cholla Unit 4 plant, please provide the following: a. The annual revenue requirement impact for each year on a non-levelized basis, starting in 2019 , of accelerating the depreciable life of Cholla Unit 4 from 2042 to 2025. b. The revenue requirement impact on a levelized basis and provide the range of years to which the levelized result applies. c. The annual revenue requirement calculations for the two end of life cases (2042 and2025). This detail should include the estimated annual revenue requirement by year and the levelized revenue requirement (where the range of years is specified). REQUEST NO. 2: Regarding the Jim Bridger Unit 1 plant, please provide the following: a. The annual revenue requirement impact for each year on a non-levelized basis, starting in20l9, of accelerating the depreciable life of Jim Bridger Unit I from 2037 to2028. b. The revenue requirement impact on a levelized basis and provide the range of years to which the levelized result applies. c. The annual revenue requirement calculations for the two end of life cases (2037 and2028). This detail should include the estimated annual revenue requirement by year and the levelized revenue requirement (where the range of years is specified). FIRST PRODUCTION REQUEST TO ROCKY MOLiNTAIN POWER 2 ocroBER 31,2018 REQUEST NO.3: Regarding the Jim Bridger Unit2 plant, please provide the following: a. The annual revenue requirement impact for each year on a non-levelized basis, starting in2019, of accelerating the depreciable life of Jim Bridger Unit 2 from 2037 to2032. b. The revenue requirement impact on a levelized basis and provide the range of years to which the levelized result applies. c. The annual revenue requirement calculations for the two end of life cases (2037 and2032). This detail should include the estimated annual revenue requirement by year and the levelized revenue requirement (where the range of years is specified). REQUEST NO. 4: Regarding the Craig Unit 1 plant, please provide the following: a. The annual revenue requirement impact for each year on a non-levelized basis, starting in2019, of accelerating the depreciable life of Craig Plant Unit from 2034 to 2025, b. The revenue requirement impact on a levelized basis and provide the range of years to which the levelized result applies. c. The annual revenue requirement calculations for the two end of life cases (2034 and2025). This detail should include the estimated annual revenue requirement by year and the levelized revenue requirement (where the range of years is specified). REQUEST NO. 5: Regarding the Craig Unit2 plant, please provide the following: a. The annual revenue requirement impact for each year on a non-levelized basis, starting in2019, of accelerating the depreciable life of Craig Plant Unit 2 from 2034 to 2026. b. The revenue requirement impact on a levelized basis and provide the range of years to which the levelized result applies. c. The annual revenue requirement calculations for the two end of life cases (2034 and2026). This detail should include the estimated annual revenue requirement FIRST PRODUCTION REQUEST TO ROCKY MOLINTAIN POWER 1J ocToBER 31,2018 by year and the levelized revenue requirement (where the range of years is specified). REQUEST NO. 6: Regarding the Colstrip Unit 3 plant, please provide the following: a. The annual revenue requirement impact for each year on a non-levelized basis, starting in2019, of accelerating the depreciable life of Colstrip Unit 3 from2046 to 2027. b. The revenue requirement impact on a levelized basis and provide the range of years to which the levelized result applies. c. The annual revenue requirement calculations for the two end of life cases (2046 and2027). This detail should include the estimated annual revenue requirement by year and the levelized revenue requirement (where the range of years is specified). REQUEST NO. 7: Regarding the Colstrip Unit 4 plant, please provide the following: a. The annual revenue requirement impact for each year on a non-levelized basis, starting in2019, of accelerating the depreciable life of Colstrip Unit 4 from2046 to2027. b. The revenue requirement impact on a levelized basis and provide the range of years to which the levelized result applies. c. The annual revenue requirement calculations for the two end of life cases (2046 and2027). This detail should include the estimated annual revenue requirement by year and the levelized revenue requirement (where the range of years is specified). REQUEST NO. 8: Please provide a detailed list of all capital improvements added for each steam production plant from 2013 to 2018. Please also provide a list of any additional improvements planned to be added from now until2020 for each plant. FIRST PRODUCTION REQUEST TO ROCKY MOLTNTAIN POWER 4 ocroBER 31,2018 REQUEST NO. 9: Please provide all journal entries made to the 2013 depreciation regulatory asset between January 1,2016 and October 1,2018. Please provide additional entries each month as they occur. REQUEST NO. 10: For each Colstrip Unit, please provide the total "original cost" values of the Colstrip Generating Station identified on page VI-4, column 5 of the Gannett Fleming Depreciation Study dated December 17 ,2017 and a breakdown of this value for each operating partner. REQUEST NO. 1l: For each Colstrip Unit, please provide details of any "Asset Retirement Obligation"(ARo) associated with the closure of the plant. Details should include: a. a description of the ARO; b. the legal obligation or reason why the ARO was initiated; c. calculations supporting the ARO amount; and d. the FERC account associated with the ARO. DATED at Boise, Idaho, this 3(tY day of October 2018. Deputy General i:umisc:prodreq/pace I 8.8ejbebl prod req I FIRST PRODUCTION REQUEST TO ROCKY MOLTNTAIN POWER Ed 5 ocToBER 31,2018 Technical Staff: Bentley Erdwurm (1-7) Brad Iverson-Long (8-9) Rick Keller (10-11) CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 31't DAY OF OCTOBER 2018, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO ROCKY MOUNTAIN POWER, IN CASE NO. PAC-E-I8-08, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: YVONNE R HOGLE TED WESTON ROCKY MOUNTAIN POWER 1407 WEST NORTH TEMPLE STE 330 SALT LAKE CITY UT 84I I6 E-MAIL : Ivonne.ho gle@pacif-rcorp. com ted. weston@pacifi corp. com DATA REQUEST RESPONSE CENTER E-MAIL ONLY: datarequest@paci fi corp. com RANDALL C BUDGE THOMAS J BUDGE RACINE OLSON PLLP PO BOX 1391 POCATELLO ID 83204 E-MAIL: rcb@racinelaw.net tjb@,racinelaw.net ERIC L OLSEN ECHO HAWK & OLSEN PO BOX 6119 POCATELLO ID 83205 E-MAIL: elo@.echohawk.com RONALD L WILLIAMS WILLIAMS BRADBURY PC PO BOX 388 BOISE ID 83701 E-MAIL : ron@williamsbradbury.com ELECTRONIC ONLY KYLE WILLIAMS BYU IDAHO E-MAIL: williamsk@byui.edu D MATTHEW MOSCON LAUREN SHURMAN STOEL RIVES LLP 201 S MAIN ST STE 11OO SALT LAKE CITY UT 84I11 E-MAIL: matt.moscon@,stoel.com lauren. shurman@stoel. com BRUBAKER & ASSOCIATES 16690 SWINGLEY RIDGE RD #t40 CHESTERFIELD MO 63017 E-MAIL: mbrubaker@consultbai.com kiverson@consultbai.com ANTHONY YANKEL LrNIT 2505 I2]OO LAKE AVENUE LAKEWOOD OH 44107 E-MAIL: tony@yankel.net ELECTRONIC ONLY JIM DUKE IDAHOAN FOODS E-MAIL: iduke@idahoan.com ELECTRONIC ONLY VAL STEINER NU-WEST INDUSTRIES INC E-MAIL : val. steiner(@itafos.eem CERTIFICATE OF SERVICE BENJAMIN J OTTO ID CONSERVATION LEAGUE 710 N 6TH STREET BOISE TD 83702 E-MAIL: botto@idahoconservation.org CERTIFICATE OF SERVICE