HomeMy WebLinkAbout20180410PAC to Staff UT DPU Set 23 (1-4).pdf1407 W.NorthTemple
ROCKY MOUNTAIN Salt Lake City,UT 84116
POWER
A DIVISION OF PACIFICORP
March 29,2018
Erika Tedder
Division of Public Utilities
160 E 300 S,4th Floor
Salt Lake City,UT 84114
etedder@utah gov (C)
RE:UT Docket No.17-035-40
DPU 23rd Set Data Request (1-4)
Please find enclosed Rocky Mountain Power's Response to DPU 23rd Set Data Request 23.1.
If you have any questions,please call me at (801)220-2823.
Sincerely,
Jana Saba
Manager,Regulation
Enclosures
C.c.:Dan Kohler/DPU dkoehler@daymarkea.com(C)
Aliea Afnan/DPUaafnan@daymarkea.com (W)
jbower@davmarkea.com (W)
Dan Peaco/DPU dpeaco@daymarkea.com (C)(W)
Kevin Higgins/UAEkhiggins@eneravstrat.com(C)
Neal Townsend/UAE ntownsend@energystrat.com(C)(W)
Gary A.Dodge/UAE edodge@hidlaw.com (C)
Phillip Russell/UAE prussell@hidlaw.com (C)
Philip Hayet/OCS phayet@ikenn.com (C)
Béla Vastag/OCS bvastag@utah.gov(C)
Sophie Hays/UCE sophie@utahcleanenergy.org(C)
Kate Bowman/UCE kate@utaheleanenergy.org(C)(W)
Emma Rieves/UCE (C)(W)
Lisa Tormoen Hickey/Interwestlisahickey@newlawaroup.com (C)
Mitch Longson/Interwest mlongson@mc2b.com (C)
Nancy Kelly/WRAnkelly@westernresources.org(C)
Jennifer Gardner/WRA jennifer.gardner@westernresources.org(C)
Penny Anderson/WRA penny.anderson@westernresources.org (W)
Peter J.Mattheis/Nucor pim@smxblaw.com (C)
Eric J.Lacey/Nucor eil@smxblaw.com (C)(W)
William J.Evans/UIEC bevans@parsonsbehle.com
Vicki M.Baldwin/UIECvbaldwin@parsonsbehle.com(W)
Chad C.Baker/UIEC ebaker@parsonsbehle.com (W)
17-035-40 /Rocky Mountain Power
March 29,2018
DPU Data Request 23.1
DPU Data Request 23.1
With respect to DPU Data Request 2.1,the Company provided some IAD summary reports,
but did not provide the full IAD or other documents listed below.For each project identified
in DPU 2.1,provide the followingdocuments that have been completed to date.Please
include those documents pertaining to the 230/345 kilovolt (kV)supporting transmission
projects (for all short list wind farms).If the Company does not provide any documents for
items (a)through (g)below,please provide an explanation of why it was not provided.
Explain when it will be provided.With respect to this request,please provide items (a)
through (g)for each project as they are created or otherwise become available.
(a)Investment Appraisal Documents (IAD);
(b)Expenditure requests or requisitions;
(c)Appropriation requests;
(d)Project change notices;
(e)Engineering service agreements and engineering studies not already provided;
(f)Cost benefit analysis not already provided;and
(g)Any other relevant studies,analyses,reports and spreadsheets (with formulae intact).
Response to DPU Data Request 23.1
(a)Please refer to the Company's response to DPU Data Request 2.lfor all available
investment appraisal documents (IAD)for the projects were provided in the
referenced data request.Once agreements are signed with the "short list wind farms"
full fundinginvestment appraisal documents will be completed.
(b)The Appropriation Requests (APR)for each project were included in Confidential
Attachment DPU 2.1.Once agreements are signed with the "short list wind farms"
full fundingAPRs will be completed.
(c)Please refer to the Company's response to subpart (b)above.
(d)As of March 2018 no project change notices (PCN)have been completed.PCNs will
be completed prior to the award of construction bid currentlyforecasted for 2019 for
the Energy Gateway West D.2 project,and once agreements are signed with the
"short list wind farms"in separate documents.
(e)Please refer to the interconnection studies filed as part of Mr.Vail's testimony and,a
copy of the preliminarydraft of the updated Aeolus West Transmission Path Transfer
Capability Assessment report (completed on February 12,2018)included in
Attachment DPU 21.1.
17-035-40 /Rocky Mountain Power
March 29,2018
DPU Data Request 23.1
(f)The cost benefit analysis used for the routing of the Aeolus-to-Bridger/Anticline
project APR is provided in section 9 of the IAD for that project (file "Aeolus-
Bridger AnticlineSegD2IADO41417final").
(g)No other relevant studies,analyses,reports and spreadsheets were completed as part
of the IADs or APRs.Due to the ongoing nature of the overall competitive bid
process,the requested information is considered commercially sensitive and highly
confidential.Please contact Jana Saba at (801)220-2823 or Yvonne Hogle at (801)
220-4050 to make arrangements for review.