HomeMy WebLinkAbout20030428_448.pdfDECISION MEMORANDUM TO:COMMISSIONER KJELLANDER CO MMISSI 0 NER SMITH COMMISSIONER HANSEN COMMISSION SECRETARY COMMISSION STAFF LEGAL WORKING FILE FROM:KEITH HESSING DATE:APRIL 22, 2003 RE:IDAHO POWER COMPANY TARIFF ADVICE NO. 03- REVISION TO SCHEDULE 42, TRAFFIC CONTROL SIGNAL LIGHTING SERVICE. COMPANY FILING On April 7, 2003 , Idaho Power Company filed Tariff Advice No. 03-01 requesting a revision to rates on Schedule 42 - Traffic Control Signal Lighting Service. Current monthly rates are established for traffic signal lights of specified wattages that operate in three different hour- per-day ranges; 12 hours per day or less, 13 to 18 hours per day, or 19 to 24 hours per day. Existing Schedule 42 is Attachment A to this Decision Memorandum. The reason for the requested change is that technology is allowing the use of energy saving low wattage LED units to replace existing signal lighting. The LED units come in many wattages that differ from existing signal lights. Including this proliferation of wattages would complicate and enlarge existing Schedule 42. Rates in the existing schedule are based on a ~/kWh charge, wattage and the maximum number of hours in the block. The Company s proposal is to specify the energy rate, 5.042 ~/kWh, in Schedule 42. The monthly bill for each signal installation would then be based on the energy rate, the lamp or LED wattage and the number of hours of operation in the month. Proposed Schedule 42 is Attachment B to this Decision Memorandum. This solution simplifies Schedule 42 and produces bills no higher than those produced under the existing schedule if the signal installations are properly included in Schedule 42 now. The Company DECISION MEMORANDUM - 1 -APRIL 22, 2003 considers the change to be revenue neutral. The Company requests an effective date of May 16 2003 to coincide with the expected PCA rate changes. STAFF RECOMMENDATION Commission Staffhas reviewed the Company s Application and verified that the energy rate proposed by the Company, 5.042 ~/kWh, is the rate currently used to calculate Schedule 42 rates. Staff received only one inquiry concerning the proposed revisions. The customer questions were answered to his satisfaction. Staff recommends that the Commission approve revised Schedule 42 as filed by the Company. Keith Hessing ipctaO3Ol.dm DECISION MEMORANDUM - 2 -APRIL 22, 2003 IDAHO POWER COMPANY THIRTEENTH REVISED SHEET NO. 42-IDAHO PUBLIC UTILITIES COMMISSION CANCELS Approved Effective TWELFTH REVISED SHEET NO. 42-May 15, 2002 May 16, 2002 Per O.N. 29026 Jean D. Jewell Secretary I.P.c. NO. 26, TARIFF NO. 101 APPLICABILITY SCHEDULE 42 TRAFFIC CONTROL SIGNAL LIGHTING SERVICE Service under this schedule is applicable to Electric Service required for the operation of traffic control signal lights within the State of Idaho. Traffic control . signal lamps are mounted on posts or standards by means of brackets, mast arms, or cable. The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable, lamps, control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable terminals for, connection to the Company s underground or overhead distribution system, are installed, owned, maintained and operated by the Customer. Service is limited to the supply of energy only for the operation of traffic control signal lights. MONTHLY CHARGES The monthly charge per signal fixture depends upon the number and size of lamps burning simultaneously in each signal: also, the average number of hours per day the signal is operated: and will be computed on the basis of the following monthly rate per lamp for the burning hours per 24-hour day as specified herein; PROVIDED, HOWEVER, at the Company s option, the wattage of the signal may be determined by test. 5 Watt 8 Watt 20 Watt 60 Watt 100 Watt 150 Watt Average Daily Base Power Cost Effective Burninq Hours Rate Adiustment*Rate 1 2 or less $0.05 $0.$0. 13 to 18 $0.$0.$0. 1 9 to 24 $0.$0.08 $0. 12 or less $0.$0.$0. 13 to 18 $0.$0.$0. 19 to 24 $0.$0.$0. 12 or less $0.$0.$0. 13 to 18 $0.$0.$0. 1 9 to 24 $0.43 $0.27 $0.70 12 or less $0.$0.43 $1. 13 to 18 $0.$0.$1. 19 to 24 $1.$0.$2. 12 or less $1.$0.70 $1.78 13 to 18 $1.$1.$2. 1 9 to 24 $2.$1.$3. Attachment 1 2 or less $1.$1.$2.DeciSJ.on Memorandum 13 to 18 $2.43 $1.$4.Hessing 1 9 to 24 $3.$2.$5.4/22/03 Page IDAHO Issued per IPUC Order No. 29026 Effective - May 1 6, 2002 Issued by IDAHO POWER COMPANY John R. Gale, Vice President. Regulatory Affairs 1221 West Idaho Street, Boise, Idaho IDAHO POWER COMPANY EIGHTH REVISED SHEET NO. 42-IDAHO PUBLIC UTILITIES COMMISSION CANCELS Approved . Effective SEVENTH REVISED SHEET NO. 42-May 15, 2002 May 16, 2002 Per O.N. 29026 Jean D. Jewell Secretary SCHEDULE 42 TRAFFIC CONTROL SIGNAL LIGHTING SERVICE I.P.c. NO. 26, TARIFF NO. 101 MONTHLY CHARGES (Continued) Average Daily Base Power Cost Effective Burninq Hours Rate Adiustment*Rate 200 Watt 12 or less $2.$1.$3. 13 to 18 $3.$2.$5. 1 9 to 24 $4.$2.79 $7. 250 Watt 12 or less $2.$1.74 $4.43 13 to 18 $4.$2.$6. 1 9 to 24 $5.$3.49 $8. This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2003. PAYMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. Attachment A Decision Memorandum K. Hessing4/22/03 Page 2 of 2 IDAHO Issued per IPUC Order No. 29026 Effective - May 16, 2002 Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise, Idaho IDAHO POWER COMPANY FOURTEENTH REVISED SHEET NO. 42- CANCELS THIRTEENTH REVISED SHEET NO. 42-I.P.c. NO. 26, TARIFF NO. 101 SCHEDULE 42 TRAFFIC CONTROL SIGNAL LIGHTING SERVICE APPLICABILITY Service under this schedule is applicable to Electric Service required for the operation of traffic control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or standards by means of brackets, mast arms, or cable. The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable, lamps, control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable terminals for, connection to the Company s underground or overhead distribution system, are installed, owned, maintained and operated by the Customer. Service is limited to the supply of energy only for the operation of traffic control signal lights. MONTHLY CHARGES The average monthly kWh of energy usage shall be estimated by the Company based on the number and size of lamps burning simultaneously in each signal and the average number of hours per day the signal is operated; PROVIDED, HOWEVER, at the Company s option, the wattage of the signal may be determined by test. Base Rate 105~ Power Cost Adiustment 937~ Effective Rate 042~ This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15,2003. PA YMENT The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes past due 15 days from the date on which rendered. Attachment B Decision Memorandum K. Hessing4/22/03 IDAHO Issued - April 7, 2003 Effective - May 16, 2003 Advice No. 03- Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise, Idaho