HomeMy WebLinkAbout20180308Staff 71-80 to PAC.pdfBRANDON KARPEN RE CElVED DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE,IDAHO 83720-0074 SlON (208)334-0357 IDAHO BAR NO.7956 Street Address for Express Mail: 472 W.WASHINGTON BOISE,IDAHO 83702-5918 Attorneys for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF )PACIFICORP DBA ROCKY MOUNTAIN )CASE NO.PAC-E-17-07 POWER FOR A CERTIFICATE OF PUBLIC )CONVENIENCE AND NECESSITY AND )BINDING RATEMAKING TREATMENT FOR )SEVENTH PRODUCTION NEW WIND AND TRANSMISSION FACILITIES)REQUESTOF THE )COMMISSION STAFF )TO ROCKY MOUNTAIN )POWER The Staff of the Idaho Public Utilities Commission,by and throughits attorney of record, Brandon Karpen,Deputy AttorneyGeneral,requests that Rocky Mountain Power provide the followingdocuments and information as soon as possible,but no later than THURSDAY, MARCH 15,2018.1 This Production Request is to be considered continuing,and Rocky Mountain Power is requested to provide,by way of supplementary responses,additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question,supporting workpapers that provide detail or are the source of information used in calculations,and the name,job title and telephonenumber of 'Staff is requesting an expedited response.If responding by this date will be problematic,please call Staff's attorney at (208)334-0357. SEVENTH PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER l MARCH 8,2018 the person preparing the documents.Please identify the name,job title,location and telephone number of the record holder. In addition to the written copies provided as response to the requests,please provide all Excel and electronic files on CD with formulas activated. REQUESTNO.71:Please provide a breakdown for all categories of costs and benefits that are labeled as "Cost of Project"in the Corrected Second Supplemental filing for all price policy scenarios of the levelized wind analysis referenced as tab:PaR -RFP FSL WStudies within file:EV2020 Workpapers Second Supp Results Summary File -VOMadjustedCONF Please use the same categories of costs and benefits in the Project Net Costs included in the Company's Nominal PVRR(d)analysis.For each category of cost,please provide the following: a.specific costs and benefits for each year between 2017 and 2036; b.a detailed description of the cost or benefit; c.the source of the data;and d.how the costs were calculated or derived (includingthe useful life of the asset and the number of years included if it is a capital cost,and the specific range of years of nominal cost that were levelized). REQUESTNO.72:Please provide a breakdown for all categories of costs and benefits that are labeled as "Cost of Project"in the Corrected Second Supplemental filing for both the Medium CO2/Medium Natural Gas and the zero CO2/low natural gas levelized solar sensitivity analysis referenced as tab:PaR -RFP Solar Sensitivity within file:EV2020 Workpapers Second Supp Results Summary File -VOM adjusted CONF.Please use the same categories of costs and benefits in the Project Net Costs included in the Company's Nominal PVRR(d)analysis.For each category of cost,please provide the following: a.specific costs and benefits for each year between 2017 and 2036; b.a detailed description of the cost or benefit; c.the source of the data;and d.how the costs were calculated or derived (includingthe useful life of the asset and the number of years included if it is a capital cost,and the specific range of years of nominal cost that were levelized). SEVENTH PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 2 MARCH 8,2018 REQUESTNO.73:Reference the Corrected Second SupplementalDirect Testimony of Rick Link,"CORRECTED Table 2-SS"and "CORRECTED Table 3-SS":Please provide a narrative explanation for why the two referenced tables produce such different results by identifying the drivers of the differences between NPVRR(d)benefits of $357 million in CORRECTED Table 2-SS and $167 million in CORRECTED Table 3-SS under the medium gas,medium CO2 scenario;and by providing a differential analysis of the different costs and benefit categories for the two tables as reflected in the Company's nominal analysis spreadsheet (filename:EV2020 Workpapers Second Supp Results Summary File -VOM adjusted Conf;Tab: Par -RFP FSLW Studies). REQUESTNO.74:For the Company's solar and new wind Nominal PVRR(d) analysis,please describe in detail how the number of megawatt-hours used to project the System Impacts from 2037 through 2045 for the solar scenarios and from 2037 through2050 for the wind scenarios were derived. REQUESTNO.75:Please provide a levelized PVRR(d)analysis for all price policy scenarios using levelized PTC benefits in the Cost of Project similar to the levelized PVRR(d) analysis submitted in the Company's original Application. REQUESTNO.76:Please provide the levelized and nominal PVRR(d)analysis relative to the base case for all price policy scenarios locking in the Company's final short-list of Solar projects that has a comparable level of effective capacity/generationto the new wind scenario. REQUESTNO.77:Please provide information relative to the nominal solar PVRR(d) analysis provided by the Company: a.What is the useful life of assets assumed in the solar network costs? b.Are the assets in the solar network costs dedicated to the solar project and can they be utilized past the term of the PPA's? SEVENTH PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 3 MARCH 8,2018 c.Please describe in detail how the Solar PPA costs were derived and/or calculated? Are there any differences in inputs or derivations for the 2017 through 2036 timeframe and the 2037 through 2045 timeframe? REQUESTNO.78:Please provide information relative to the nominal new wind PVRR(d)analysis provided by the Company: a.Please describe and provide a breakdown of the components contained within Transmission Capital Recovery category. b.What are the useful lives of the assets contained within Transmission Capital Recovery category? c.How far out are the Transmission Capital Recovery costs and benefits included in the analysis? d.Please provide a description and the method used to derive incremental transmission revenues. e.Please describe and provide a breakdown of the components contained within Capital Recovery -New Wind category. f.How far out in time are the Capital Recovery -New Wind costs and benefits included in the analysis? g.Please describe and provide a breakdown of the components contained within Network -New Wind category. h.What are the useful lives of the assets contained within Network -New Wind category? i.How far out are the Network -New Wind costs and benefits included in the analysis? j.Please describe and provide a breakdown of the components contained within the O&M/Wind Tax -New Wind category. k.Please describe and provide a breakdown of all the components contained within the Terminal Value -New Wind category. 1.Please describe and provide a breakdown of all the components contained within the PPA Cost -New Wind category. SEVENTH PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 4 MARCH 8,2018 REQUESTNO.79:Is the Company proposing to recover the costs associated with the combined projects consistently with the way the revenue requirements are modeled in its levelized analysis?If not,please explain why not? REQUESTNO.80:How are the revenue requirements that flow into Joelle Stewards analysis modeled,using levelized revenue requirements or nominal revenue requirements? Please explain the rationale for this approach in detail? DATED at Boise,Idaho,this day of March 2018. andon arpe Deputy Áttorne G neral Technical Staff:Mike Louis/71-80 i:umisc:prodreqlpacel7.7bkml prod reg 7 SEVENTH PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 5 MARCH 8,2018 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 8th DAY OF MARCH 2018, SERVED THE FOREGOING SEVENTH PRODUCTION REQUESTOF THE COMMISSION STAFF TO ROCKY MOUNTAIN POWER,IN CASE NO. PAC-E-17-07,BY MAILING A COPY THEREOF,POSTAGE PREPAID,TO THE FOLLOWING: TED WESTON YVONNE R HOGLE ROCKY MOUNTAIN POWER ASSISTANT GENERAL COUNSEL 1407 WEST NORTH TEMPLE STE 330 ROCKY MOUNTAIN POWER SALT LAKE CITY UT 84116 1407 WN TEMPLE STE 320 E-MAIL:ted.weston@pacificorp.com SALT LAKE CITY UT 84116 E-MAIL:Yvonne.houle@pacificorp.com DATA REQUEST RESPONSE CENTER RANDALL C BUDGE E-MAIL ONLY:RACINE OLSON NYE &BUDGE datarequest@pacificorp.com PO BOX 1391 POCATELLO ID 83204-1391 E-MAIL:reb racinelaw.net BRUBAKER &ASSOCIATES RONALD L WILLIAMS 16690 SWINGLEY RIDGE RD #140 WILLIAMS BRADBURY PC CHESTERFIELD MO 63017 PO BOX 388 E-MAIL:kiverson consultbai.com BOISE ID 83701 bcollins consultbai.com E-MAIL:ron williamsbradbury.com ELECTRONIC ONLY ELECTRONIC ONLY JIM DUKE KYLE WILLIAMS IDAHOAN FOODS BYU IDAHO E-MAIL:jduke@idahoan.com E-MAIL:williamsk@byui.edu ELECTRONIC ONLY ERIC L OLSEN VAL STEINER ECHO HAWK &OLSEN NU-WEST INDUSTRIES INC PO BOX 6119 E-MAIL:val.steiner itafos.com POCATELLO ID 83205 E-MAIL:elo@echohawk.com ANTHONY YANKEL BRADLEY MULLINS UNIT 2505 333 SW TAYLOR 12700 LANE AVENUE SUITE 400 LAKEWOOD OH 44107 PORTLAND OR 97204 E-MAIL:tony@yankel.net E-MAIL:brmullins@mwanalytics.com SECRETARY CERTIFICATE OF SERVICE