Loading...
HomeMy WebLinkAbout20180307PAC to Staff WY WIEC Set 20 (1-15) (2).pdfROCKY MOUNTAINPOWER A DIVlSION OF PACIFICORP 1407 W North Temple,Suite 330 Salt Lake City,Utah 84116 March 2,2018 Abigail C.Briggerman,#7-5476 Holland &Hart LLP 6380 South Fiddlers Green Circle,Suite 500 Greenwood Village,CO 80111 acbriggerman@hollandhart.com(C) RE:Wyoming Docket 20000-520-EA-17 WIEC 20th Set Data Request (1-15) Please find enclosed Rocky Mountain Power's Responses to WIEC 20th Set Data Requests 20.2, 20.7-20.9,and 20.11.The remaining responses will be provided separately. If you have any questions,please call me at (307)632-2677. Sincerely, Stacy Splittstoesser, Manager,Regulation Enclosures C.C.:Meridith Bell/WPSC meridith.bell@wyo.gov(C) Lori L.Brand/WPSC lori.brand@wyo.gov (W) John Burbridge/WPSC john.brubride@wvo.gov(W) Michelle Bohanan/WPSC Michelle.bohanan@wyo.gov (W) Kara Seveland/WPSC kara.seveland@wyo.gov(W) Morgan Fish/WPSC morgan.fish@wyo.gov (W) Dave Walker/WPSC dave.walker@wvo.ev (W) Perry McCollom/WPSC perrv.mccollom@wyo.gov(W) Patti Penn/WIEC PPenn@hollanhart.com(W) Thor Nelson/WIEC tnelson@hollandhart.com (C)(W) Emanuel Cocian/WIEC etcocian@hollanhart.com (W) Adele Lee/WIEC ACLee@hollandhart.com (W) Nik Stoffel/WIEC NSStoffel@hollandhart.com (C)(W) Christopher Leger/OCA christopher.leger@wyo.gov (C) Crystal J.McDonough/NLRAcrystal@medonoughlawlle.com (C) Callie Capraro/NLRA callie@medonoughlawllc.com Lisa Tormoen Hickey/Interwestlisahickev@newlawgroup.com (C) Brandon L.Jensen/RMSC brandon@buddfaln.com(C) Roxane Perruso/TOTCO Roxane.perruso@tac-denver.com Jane M.France/TOTCO jfrance@spkm.org (C) Constance E.Brooks/Anadarko connie@cebrooks.com(C) Danielle Bettencourt/Anadarko danielle@cebrooks.com (C)(W) Paul Kapp/Anadarko pkapp@spkm.org (C) Lisa Christian/TOTCO Lisa.Christian@tac-denver.com (C) J.Kenneth Barbe/Southlandkbarbe@wsmtlaw.com (C) 20000-520-EA-17 /Rocky Mountain Power March 2,2018 WIEC Data Request 20.2 WIEC Data Request 20.2 Please provide a narrative description of all efforts the Company has undertakento ensure the revised final shortlist projects go online before December 31,2020,whether the projects are BTA or PPA projects. Response to WIEC Data Request 20.2 As part of each project bid evaluation,PacifiCorp reviewed the bid material submitted by the bidder,conducted conference calls with the bidder and independentevaluators (IE)to review bid submittal includingproject schedule,status and schedule of required permitting,status and schedule of required studies,status and schedule of publicly available interconnection studies on Open Access Same-Time Information System (OASIS),status and schedule of wind turbine and balance of plant procurement,and status and schedule of site control includingrights of ways (ROW)and easements.As part of its review process,PacifiCorp required that each bidder provide documentation as available to support status and schedule to achieve a commercial operation date (COD) on or before December 31,2020.Build transfer agreement (BTA)and power purchase agreement (PPA)contracts will be negotiatedbetween March 2018 and June 2018,and will include contractual mechanisms such as schedule requirements,construction guarantees,and liquidated damages to ensure that any risks associated with construction and commercial operational delays will be borne by the project developerrather than PacifiCorp and its customers. Respondent:Bruce Griswold /Ken Clark Witness:Rick Link /Chad Teply 20000-520-EA-17 /Rocky Mountain Power March 2,2018 WIEC Data Request 20.7 WIEC Data Request 20.7 Regarding the Cedar Springs Wind Project,please explain how the wind facilities, includingany gen-tie lines,are allocated based on the BTA and PPA components.For example,is the BTA component for an ownership interest in the entire project,or for specific wind facilities within the project? Response to WIEC Data Request 20.7 In the evaluation of Cedar Springs Wind Project,the build transfer agreement (BTA) projects were evaluated at its bid price with direct-assigned interconnection capital cost plus the dollars per kilowatt ($/kW)in-service interconnection network upgrade capital cost based on the BTA capacity (halfof the total project capacity).The other half was included in the power purchase agreement (PPA)bid price.The two components were added together to determine the combined BTA/PPA cost for modeling purposes. The BTA and PPA for the Cedar Springs Wind Project are scheduled to be negotiated between March 2018 and June 2018.PacifiCorp anticipates the BTA will be tied to specific equipment,such as individual wind turbine generators (WTG),within the wind project to the greatest extent possible within a practical project design. Respondent:Bruce Griswold /Ken Clark Witness:Rick Link /Chad Teply 20000-520-EA-17 /Rocky Mountain Power March 2,2018 WIEC Data Request 20.8 WIEC Data Request 20.8 Please provide a copy of Appendix J to the February2018 Final Report of Merrimack Energy. Response to WIEC Data Request 20.8 Please refer to the Company's response to WIEC Data Request 17.4.The highly confidential presentation dated February 12,2018 is Appendix J to the February 2018 Final Report of Merrimack Energy Group,Inc.,regarding the 2017 Renewable Request for Proposals (2017R RFP).A non-confidential version is available on the website of the Public Service Commission of Utah: https://psedocs.utah.gov/electric/17docs/1703523/300421RedacFinRep2-27-2018.pdf Respondent:Bruce Griswold Witness:Rick Link 20000-520-EA-17 /Rocky Mountain Power March 2,2018 WIEC Data Request 20.9 , WIEC Data Request 20.9 Please refer to Mr.Vail's Second SupplementalDirect Testimony at pages 1 and 7. (a)Please provide a complete copy of the updated studies that indicate that RMP can interconnect 1,510 MW of incremental wind generationbehind the TOT4A/TOT4B constraint. (b)Please identifywhether RMP will be purchasing any of the output of the 240 MW QualifyingFacility that has an executed interconnection agreement that is mentioned on Page 7 of Mr.Vail's Second SupplementalDirect Testimony. Response to WIEC Data Request 20.9 (a)Please refer to the Company's response to WIEC Data Request 19.2. (b)PacifiCorp has a Public Utility Regulatory Policies Act (PURPA)obligation to contract with and to purchase the output of the 240 megawatt (MW)qualifying facility (QF)once the project has interconnected and is operating. Respondent:Craig Quist /Bruce Griswold Witness:Rick Vail /Rick Link 20000-520-EA-17 /Rocky Mountain Power March 2,2018 WIEC Data Request 20.11 WIEC Data Request 20.11 Please refer to Mr.Vail's Second SupplementalDirect Testimony at pages 3 through 6 and Mr.Vail's Exhibits RAV-2SS through RAV-5SS.For each of the followingwind projects,please identify the commercial operation date that must be achieved in order for the project to be eligible for full receipt of Production Tax Credits (PTCs). (a)TB Flats I and II. (b)Cedar Springs. (c)Ekola Flats. (d)Uinta. Response to WIEC Data Request 20.11 Each project must achieve commercial operation by December 31,2020. Respondent:Bruce Griswold Witness:Rick Link