RE:Wyoming Docket 20000-520-EA-17
WIEC 13th Set Data Request (1-9)
Please find enclosed Rocky Mountain Power's 16'Revised Response to WIEC 13th Set Data
Request 13.2.
If you have any questions,please call me at (307)632-2677.
Sincerely,
Stacy Splittstoesser,
Manager,Regulation
Enclosures
C.C.:Meridith Bell/WPSC meridith.bell@wyo.gov(C)
Lori L.Brand/WPSC lori.brand@wyo.cov(W)
John Burbridge/WPSC john.brubride@wyo.gov(W)
Michelle Bohanan/WPSC Michelle.bohanan@wyo.gov (W)
Kara Seveland/WPSC kara.seveland@wyo.gov(W)
Morgan Fish/WPSC morgan.fish@wyo.gov (W)
Dave Walker/WPSC dave.walker@wvo.av (W)
Perry McCollom/WPSC perrv.mccollom@wvo.gov(W)
Patti Penn/WIEC PPenn@hollanhart.com(W)
Thor Nelson/WIEC tnelson@hollandhart.com (C)(W)
Emanuel Cocian/WIEC etcocian@hollanhart.com (W)
Adele Lee/WIEC ACLee@hollandhart.com (W)
Nik Stoffel/WIEC NSStoffel@hollandhart.com (C)(W)
Christopher Leger/OCA christopher.leger@wyo.gov (C)
Crystal J.McDonough/NLRAcrystal@mcdonoughlawlle.com (C)
Callie Capraro/NLRA callie@medonoughlawlle.com
Lisa Tormoen Hickey/Interwestlisahickey@newlawgroup.com (C)
Brandon L.Jensen/RMSC brandon@buddfaln.com (C)
Roxane Perruso/TOTCO Roxane.perruso@tac-denver.com
Jane M.France/TOTCO jfrance@spkm.org (C)
Constance E.Brooks/Anadarko connie@cebrooks.com(C)
Danielle Bettencourt/Anadarko danielle@cebrooks.com(C)(W)
Paul Kapp/Anadarko okapp@spkm.org (C)
Lisa Christian/TOTCO Lisa.Christian@tac-denver.com (C)
J.Kenneth Barbe/Southland kbarbe@wsmtlaw.com (C)
20000-520-EA-17 /Rocky Mountain Power
February 27,2018
WIEC Data Request 13.2 -16*Revised
WIEC Data Request 13.2
For each RFP response received for the renewable (non-solar)RFP,please provide the
following:
(a)A description of the bid,includingalternative structures (i.e.,PPA,self-build,build
transfer,etc.).
(b)The Levelized Cost of Energy (LCOE)for each alternative.
(e)The economic structure for each alternative.
(d)The expected Net Capacity Factor (P50).
(e)The Net Capacity Factor at the PO5,Pl0,P25,P75,P90 and P95 levels.
(f)A detailed description discuss the reasons (both economic and otherwise)regarding
why (or why not)the project was selected.
16 Revised Response to WIEC Data Request 13.2
Please be advised that the Company mistakenly referenced 2017 Renewable Request for
Proposals (2017R RFP)documentation with its original response to WIEC Data Request
13.2 incorrectlyclassified as confidential.The document is,in fact,considered
commercially sensitive and highly confidential.This 16'Revised response to WIEC Data
Request 13.2 corrects that error and replaces the Company's original response in its
entirety.The Company requests that copies of its original response to WIEC Data
Request 13.2 dated January 30,2018 are destroyed.
For subparts (a)through (d),and (f),the Company responds as follows:
Due to the ongoing nature of the 2017 2017R RFP,documentation associated with the
2017R RFP are considered commercially sensitive and highly confidential.The Company
does not typically permit access to commercially sensitive 2017R RFP documentation
until the RFP has been concluded.Please contact Stacy Splittstoesser at (307)632-2677
or Yvonne Hogle at (801)220-4050 to make arrangements for review.
For subpart (e),PacifiCorp only required the Net Capacity Factor (NCF)at a P50 level in
each bid submittal.
Respondent:Bruce Griswold
Witness:Rick Link