Loading...
HomeMy WebLinkAbout20180208PAC to Staff UT OCS Set 9 (1-6) (2).pdf1407 W.North Temple ROCKY MOUNTAIN Salt Lake City,UT 84116 POWER A DIVISION OF PACIFICORP Janaury 31,2018 Béla Vastag Office of Consumer Services 160 East 300 South Salt Lake City,Utah 84111 b_vastag@utah.gov (C) RE:UT Docket No.17-035-40 OCS 9th Set Data Request (1-6) Please find enclosed Rocky Mountain Power's Responses to OCS 9th Set Data Requests 9.1 and 9.3. If you have any questions,please call me at (801)220-2823. Sincerely, i Jana Saba Manager,Regulation Enclosures C.c.Erika Tedder/DPU dpudatarequest@utah.govetedder@utah.gov(C) Dan Kohler/DPU dkoehler@davmarkea.com(C) Dan Peaco/DPU dpeaco@daymarkea.com (C)(W) Aliea Afnan/DPUaafnan@davmarkea.com (W) ibower@daymarkea.com (W) Philip Hayet/OCS phavet@jkenn.com (C) Gary A.Dodge/UAE adodge@hidlaw.com (C) Phillip Russell/UAE prussell@hidlaw.com (C) Kevin Higgins/UAE khiggins@energystrat.com (C) Neal Townsend/UAE ntownsend@energystrat.com(C)(W) Sophie Hays/UCE sophie@utahcleanenergy.org(C) Kate Bowman/UCE kate@utahcleanenergy.ore(C)(W) Emma Rieves/UCE emma@utahcleanenergy.org(C)(W) Lisa Tormoen Hickey/Interwestlisahickey@newlawaroup.com (C) Mitch Longson/Interwest mlongson@mc2b.com (C) Nancy Kelly/WRAnkelly@westernresources.org(C) Jennifer Gardner/WRA jennifer.gardner@westernresources.org(C) Penny Anderson/WRA pennv.anderson@westernresources.org (W) Peter J.Mattheis/Nucor pjm@smxblaw.com (C) Eric J.Lacey/Nucor ejl@smxblaw.com (C)(W) William J.Evans/UIEC bevans@parsonsbehle.com Vicki M.Baldwin/UIEC vbaldwin@parsonsbehle.com(W) Chad C.Baker/UIEC ebaker@parsonsbehle.com (W) 17-035-40 /Rocky Mountain Power January 31,2018 OCS Data Request 9.1 OCS Data Request 9.1 Refer to Mr.Link's spreadsheet,Table 2-SD,Table 3-SD,Figure 5 FSL Results Summary File.xlsx,tab =Bid Costs. (a)For each wind bid resource (between rows 2 -75),provide all calculations electronically,with all formulas intact used to derive the cost in each row for the Capital Recovery,FOM capitalized,FOM non-capitalized,PTCs,Network Upgrade (88%),PPA Cost,and Gateway D2 Cost. (b)For each solar bid resource (between rows 79 -108),provide all calculations electronically,with all formulas intact used to derive the cost in each row for the Network Upgrade (88%),and the PPA Cost. (c)For the Transmission Project (between rows 111 -114)provide all calculations electronically,with all formulas intact used to derive the cost in each row for the Transmission Project Capital Recovery,and the Incremental Transmission Revenues. Response to OCS Data Request 9.1 (a)Due to the ongoing nature of the 2017R Request for Proposals (2017R RFP),bids, evaluations,data,reports and analyses documentation associated with the 2017R RFP are considered commercially sensitive and highly confidential.The Company does not typically permit access to commercially sensitive 2017R RFP documentation until the RFP has been concluded.Please contact Jana Saba at (801)220-2823 or Yvonne Hogle at (801)220-4050 to make arrangements for review. (b)Due to the ongoing nature of the 2017S RFP,bids,evaluations,data,reports and analyses documentation associated with the 2017S RFP are considered commercially sensitive and highly confidential.The Company does not typically permit access to commercially sensitive 2017S RFP documentation until the RFP has been concluded. Please contact Jana Saba at (801)220-2823 or Yvonne Hogle at (801)220-4050 to make arrangements for review. (c)Please refer to the Company's response to DPU Data Request 16.5,specifically Confidential Attachment DPU 16.5. 17-035-40 /Rocky Mountain Power January 31,2018 OCS Data Request 9.3 OCS Data Request 9.3 Refer to Mr.Link's spreadsheet,Gateway IRP Data 21%US Tax (VL).xlsx: (a)Several columns in the worktab have the same headings,but it is not clear what the difference in the calculations are.For example,columns F and O are the same,and columns G and P are the same.Please explain the difference in the calculation of those columns. (b)This spreadsheet references the file:Energy Gateway GM 2017 03 13 21%US Tax.xlsm.Please supply that file electronically,with all formulas intact.If this file has been supplied,please note where it may be found. Response to OCS Data Request 9.3 (a)Columns C through I represent the nominal annual revenue requirements for the Aeolus-to-Bridger/Anticlinetransmission project. Column F is the gross revenue requirement from file "Energy Gateway GM 2017 03 13 21%US Tax.xlsm"Generic tab row 1711. The Company expects to recover 12 percent revenue requirement in column F from wholesale transmission customers under the Company's Open Access Transmission Tariff (OATT)formula rate. Column I is the difference between columns F and G,and represents the amount the Company expects to recover from retail customers. The second set of columns,N through Q,are the real levelized revenue requirements for the Aeolus to Bridger/Anticlinetransmission project. Column O is the real levelized revenue requirement for the transmission project. The real levelized revenue requirement is a stream of annual payments increasing with inflation having the same present value as the nominal revenue requirements in column F. Column P is 12 percent of the real levelized revenue requirement in column O. Column Q is the difference between columns O and P. (b)Please refer to the Company's response to DPU Data Request 16.5,specifically Confidential Attachment DPU 16.5.