Loading...
HomeMy WebLinkAbout20171109PAC to Staff 3rd Suppl WY-17 WIEC Set 9 1.pdfROCKY MOUNTAINPOWER A DIVISION OF PAClFICORP 1407 W North Temple,Suite 330 Salt Lake City,Utah 84116 November 7,2017 Abigail C.Briggerman,#7-5476 Holland &Hart LLP 6380 South Fiddlers Green Circle,Suite 500 Greenwood Village,CO 80111 acbriggerman@hollandhart.com(C) RE:Wyoming Docket 20000-520-EA-17 WIEC 9th Set Data Request (1) Please find enclosed Rocky Mountain Power's Response to WIEC 9th Set Data Request 9.1. If you have any questions,please call me at (307)632-2677. Sincerely, Stacy Splittstoesser, Manager,Regulation Enclosures C.C.:Meridith Bell/WPSC meridith.bell@wyo.gov(C) Lori L.Brand/WPSC lori.brand@wvo.gov (W) John Burbridge/WPSC iohn.brubride@wyo.cov (W) Michelle Bohanan/WPSC Michelle.bohanan@wyo.cov (W) Kara Seveland/WPSC kara.seveland@wyo.gov(W) Morgan Fish/WPSC morgan.fish@wyo.gov (W) Dave Walker/WPSC dave.walker@wyo.gv (W) Perry McCollom/WPSC perry.mccollom@wyo.gov(W) Patti Penn/WIEC PPenn@hollanhart.com(W) Bob Pomeroy/WIEC rpomerov@hollandhart.com (W) Thor Nelson/WIEC tnelson@hollandhart.com (W) Emanuel Cocian/WIEC etcocian@hollanhart.com (W) Adele Lee/WIEC ACLee@hollandhart.com (W) Nik Stoffel/WIEC NSStoffel@hollandhart.com (C)(W) Christopher Leger/OCA christopher.leger@wvo.gov (C) Crystal J.McDonough/NLRAcrvstal@medonoughlawlle.com (C) Lisa Tormoen Hickey/Interwestlisahickey@newlawaroup.com (C) 20000-520-EA-17 /Rocky Mountain Power November 7,2017 WIEC Data Request 9.1 WIEC Data Request 9.1 Please reference RMP Utah Docket No.17-035-39 and the rebuttal testimonies of Cindy Crane,Rick Link,and Jeffrey Larson which discuss the updated economic analysis for the repower project.In particular,Mr.Link discusses the updates beginning on page 3 of his rebuttal.The updates include a correction to transmission assumptions,more current load forecasts,more current forward price curve assumptions,and more current cost-and- performance estimates for the wind facilities.In lightof this updated economic analysis, please answer the followingquestions: (a)Has RMP performed,or is RMP planning to perform,a similar update to its economic analysis to reflect updated forward curves,load forecasts,corrections to transmission assumptions,and/or cost-and-performance of the wind facilities (either or both the new wind proposed in this docket or the modeling of the repower facilities included in some of the analyses in this docket)? (b)If RMP has already performed this analysis,please provide a full and unredacted copy of the results includingall work papers in an electronic format with all formulae and links intact,includingupdated work papers from other witnesses that depend on these results. (c)If RMP has not yet performed or completed the analysis but is either currently performing the analysis or plans to perform the analysis: i.please provide an estimate of when the results will be available. ii.Once the analysis is complete,please provide a full and unredacted copy of the results includingall work papers in an electronic format with all formulae and links intact,includingupdated work papers from other witnesses that depend on these results. (d)If RMP is not planning on updating its analysis to reflect these changes in assumptions,please explain in detail why not. Response to WIEC Data Request 9.1 (a)The Company understands this questionas to be asking both whether the Company has (i)performed new analysis on the new wind facilities akin to that which was performed for the repowering project (e.g.incorporating new cost information,load forecasts,etc.),or (ii)updated the analysis of the new wind facilities to incorporate the updated repowering analysis.Based on this understanding,the Company answers as follows: The Company has not performed either of these updates to its analysis for the new wind and transmission projects addressed in this docket.Consistent with the approach described in the application,the Company will update its economic analysis in its supplemental direct filing to be filed in January 2018. 20000-520-EA-17 /Rocky Mountain Power November 7,2017 WIEC Data Request 9.1 (b)Please refer to the Company's response to subpart (a)above. (c)Please refer to the Company's response to subpart (a)above. (d)Please refer to the Company's response to subpart (a)above. Respondent:Randy Baker Witness:Rick Link