Loading...
HomeMy WebLinkAbout20170929Staff 36-37 to PAC.pdfBRANDON KARPEN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE,IDAHO 83720-0074 (208)334-0357 IDAHO BAR NO.7956 Street Address for Express Mail: 472 W.WASHINGTON BOISE,IDAHO 83702-5918 Attorneys for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF )PACIFICORP DBA ROCKY MOUNTAIN )CASE NO.PAC-E-17-06 POWER FOR BINDING RATEMAKING )TREATMENT FOR WIND REPOWERING ) )THIRD PRODUCTION )REQUESTOF THE )COMMISSION STAFF )TO ROCKY MOUNTAIN )POWER The Staff of the Idaho Public Utilities Commission requests that Rocky Mountain Power provide the followingdocuments and information as soon as possible,but no later than FRIDAY,OCTOBER 6,2017.1 This Production Request is to be considered continuing,and Rocky Mountain Power is requested to provide,by way of supplementary responses,additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question,supporting workpapers that provide detail or are the source of information used in calculations,and the name,job title and telephone number of 'Staffis requesting an expedited response.If responding by this date will be problematic,please call Staff's attorney at (208)334-0357. THIRD PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER l SEPTEMBER 29,2017 the person preparing the documents.Please identify the name,job title,location and telephone number of the record holder. In addition to the written copies provided as response to the requests,please provide all Excel and electronic files on CD with formulas activated. REQUESTNO.36:In reference to the new 300MW wind resource identified as I_WAE_WD_T in the SO model summary report named SO Portfolio SENS-RPN-EEN- MM_1705241827 and identified as I_WAE_WD_T2in the PaR summary report named PaR Stochastic Summary PSens-RPN-EEN-MM_1705281550: a.Please provide a detailed description of this new wind resource includingbut not limited to where it is located,which substation it would be connected with,the time frame it is available for the SO model to select as a resource,and the amount of capacity available for the SO model to select. b.Please explain the negative values for fixed cost in the modeling reports. c.Please provide details on the cost estimates found in the SO Portfolio SENS-RPN- EEN-MM_l705241827file in the PVRRByStation tab on lines 1974-1981.This should include but not limited to the performance and cost attributes from the supply-side resource options,and any other input cost assumptions used to create the values for each line item that shows a value. d.If this new wind resource is located in the Aeolis Wyoming area,please explain how this resource would impact the transmission congestion in the area? REQUESTNO.37:In reference to the new 2.6MW wind resource identified as I_GO_WD_Tlin the SO model summary report named SO Portfolio SENS-RPN-EEN- MM_1705241827 and identified as I WAE_WD_T2 in the PaR summary report named PaR Stochastic Summary PSens-RPN-EEN-MM_l705281550: a.Please provide a description of this new wind resource includingbut not limited to where it is located,which substation it would be connected with,the time frame it is available for the SO model to select as a resource,and the amount of capacity available for the SO model to select. b.Please explain the negative values for fixed cost in the modeling reports. THIRD PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 2 SEPTEMBER 29,2017 e.Please provide details on the cost estimates found in the SO Portfolio SENS-RPN- EEN-MM_l705241827file in the PVRRByStation tab on lines 1222-1229.This should include but not limited to the performance and total resource cost attributes from the supply-side resource options,and any other inputcost assumptions used to create the values for each line item that shows a value. DATED at Boise,Idaho,this day of September 2017. I Bran n K'arppn Deputy.Attorney Gener Technical Staff:Michael Eldred/36-37 i:umisc:prodreqlpacel7.6bkme prod req 3 THIRD PRODUCTION REQUEST TO ROCKY MOUNTAIN POWER 3 SEPTEMBER 29,2017 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 29h DAY OF SEPTEMBER 2017, SERVED THE FOREGOING THIRD PRODUCTION REQUESTOF THE COMMISSION STAFF TO ROCKY MOUNTAIN POWER,IN CASE NO. PAC-E-17-06,BY MAILING A COPY THEREOF,POSTAGE PREPAID,TO THE FOLLOWING: TED WESTON YVONNE R HOGLE ROCKY MOUNTAIN POWER ASSITANT GENERAL COUNSEL 1407 WEST NORTH TEMPLE STE 330 ROCKY MOUNTAIN POWER SALT LAKE CITY UT 84116 1407 WN TEMPLE STE 320 E-MAIL:ted.weston@pacificorp.com SALT LAKE CITY UT 84116 E-MAIL:Yvonne.hogle@pacificorp.com DATA REQUEST RESPONSE CENTER RANDALL C BUDGE E-MAIL ONLY:RACINE OLSON NYE &BUDGE datarequest@pacificorp.com PO BOX 1391 POCATELLO ID 83204-1391 E-MAIL:reb racinelaw.net BRUBAKER &ASSOCIATES RONALD L WILLIAMS 16690 SWINGLEY RIDGE RD #140 WILLIAMS BRADBURY PC CHESTERFIELD MO 63017 PO BOX 388 E-MAIL:kiverson@consultbai.com BOISE ID 83701 mbrubaker@consultbai.com E-MAIL:ron@williamsbradburv.com ELECTRONIC ONLY ELECTRONIC ONLY JOHN DUKE KYLE WILLIAMS IDAHOAN FOODS BYU IDAHO E-MAIL:iduke@idahoan.com E-MAIL:williamsk@byui.edu ELECTRONIC ONLY ERIC L OLSEN VAL STEINER ECHO HAWK &OLSEN NU-WEST INDUSTRIES INC PO BOX 6119 E-MAIL:val.steiner@agrium.com POCATELLO ID 83205 E-MAIL:elo echohawk.com ANTHONY YANKEL BRADLEY MULLINS UNIT 2505 333 SW TAYLOR 12700 LANE AVENUE SUITE 400 LAKEWOOD OH 44107 PORTLAND OR 97204 E-MAIL:tonv@yankel.net E-MAIL:brmullins@mwanalytics.com SECRETAÍtÝ CERTIFICATE OF SERVICE