Loading...
HomeMy WebLinkAbout20170925Utah Wind Turbine Repowering Is on the Horizon - POWER Magazine.html [if IE 7]> <html class="ie ie7" lang="en-US" xmlns:fb="http://ogp.me/ns/fb#" xmlns:addthis="http://www.addthis.com/help/api-spec" prefix="og: http://ogp.me/ns#"> <![endif] [if IE 8]> <html class="ie ie8" lang="en-US" xmlns:fb="http://ogp.me/ns/fb#" xmlns:addthis="http://www.addthis.com/help/api-spec" prefix="og: http://ogp.me/ns#"> <![endif] [if !(IE 7) | !(IE 8) ]><! <![endif] http://www.powermag.com Wind Turbine Repowering Is on the Horizon http://gmpg.org/xfn/11 http://www.powermag.com/xmlrpc.php link rel="stylesheet" href="http://www.powermag.com/wp-content/themes/powermag/css/bootstrap.min.css" / 123 http://www.powermag.com/wp-content/themes/powermag/css/bootstrap-nowidescreen.min.css http://fonts.googleapis.com/css?family=Noto+Sans:400,700,400italic,700italic //maxcdn.bootstrapcdn.com/font-awesome/4.2.0/css/font-awesome.min.css [if lt IE 9]> <script src="http://www.powermag.com/wp-content/themes/powermag/js/html5.js" type="text/javascript"></script> <![endif] http://www.powermag.com/wp-content/themes/powermag/css/clickableskin.css //tags.tiqcdn.com This site is optimized with the Yoast SEO plugin v2.3.5 - https://yoast.com/wordpress/plugins/seo/ http://www.powermag.com/wind-turbine-repowering-horizon/ / Yoast SEO plugin. http://www.powermag.com/feed/ http://www.powermag.com/comments/feed/ http://www.powermag.com/wind-turbine-repowering-horizon/feed/ ).length>3e3 http://cdn.powermag.com/wp-content/plugins/aicms-power-videos/aicms-power-videos.css?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/aicms-article-pagination/css/AICMS_Pagination_CSS.css?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/publishthis/assets/css/content-on.css?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/publishthis/assets/css/widgets.css?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/publishthis/assets/css/content.css?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/lazy-load-xt/css/jquery.lazyloadxt.fadein.min.css?ver=1.0.6 http://cdn.powermag.com/wp-content/plugins/lazy-load-xt/css/jquery.lazyloadxt.spinner.min.css?ver=1.0.6 http://cdn.powermag.com/wp-content/themes/powermag/style.css?ver=4.3.2 [if lt IE 9]> <link rel='stylesheet' id='twentytwelve-ie-css' href='http://cdn.powermag.com/wp-content/themes/powermag/css/ie.css?ver=20121010' type='text/css' media='all' /> <![endif] http://cdn.powermag.com/wp-content/plugins/aicms-popup/aicms-popup.css?ver=4.3.1 http://cdn.powermag.com/wp-includes/js/jquery/jquery.js?ver=1.11.3 http://cdn.powermag.com/wp-includes/js/jquery/jquery-migrate.min.js?ver=1.2.1 http://cdn.powermag.com/wp-content/plugins/aicms-power-videos/aicms-power-videos.js?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/aicms-article-pagination/js/AICMS_Pagination_JS.js?ver=4.3.1 http://cdn.powermag.com/wp-content/themes/powermag/js/detect.js?ver=4.3.1 http://cdn.powermag.com/wp-content/themes/powermag/js/bootstrap.min.js?ver=4.3.1 http://cdn.powermag.com/wp-content/themes/powermag/js/script.js?ver=4.3.1 http://cdn.powermag.com/wp-content/themes/powermag/js/jquery.cookie.js?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/publishthis/assets/js/content.js?ver=1.0.15 http://cdn.powermag.com/wp-content/plugins/publishthis/assets/js/lib/jquery.masonry.min.js?ver=1.0.15 http://api.decisionbriefs.com/js/api/user/prefs.js?ver=4.3.1 http://api.decisionbriefs.com/js/api/user/modal.js?ver=4.3.1 http://apps.decisionbriefs.com/widgets/component/power/topmenu?ver=4.3.1 http://apps.decisionbriefs.com/widgets/component/power/savepost?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/lazy-load-xt/js/jquery.lazyloadxt.min.js?ver=1.0.6 http://cdn.powermag.com/wp-content/plugins/lazy-load-xt/js/jquery.lazyloadxt.srcset.min.js?ver=1.0.6 http://cdn.powermag.com/wp-content/plugins/lazy-load-xt/js/jquery.lazyloadxt.print.min.js?ver=1.0.6 http://www.powermag.com/xmlrpc.php?rsd http://www.powermag.com/wp-includes/wlwmanifest.xml http://www.powermag.com/?p=97010 http://apps.decisionbriefs.com/js/custom/bigquery/tracking.js BEGIN wp-parsely Plugin Version 1.10.2 END wp-parsely Plugin Version 1.10.2 lytics https://c.lytics.io/api/tag/1e95571728bc49411f34ef423cffe6f7/lio.js end lytics Loading script asynchronously END: T-WP top header container header header-top begin for mobile (phones) Menu Topics http://www.powermag.com/category/coal/Coal http://www.powermag.com/category/gas/Gas http://www.powermag.com/category/nuclear/Nuclear http://www.powermag.com/category/renewables/Renewables http://www.powermag.com/category/smart-grid/Smart Grid http://www.powermag.com/category/business/Business http://www.powermag.com/category/environment/Environmental http://www.powermag.com/category/om/O & M Power Brands http://www.powermag.com/current-issue-power/POWER Magazine http://www.powermag.com/current-issue-powernews/POWERnews http://www.powermag.com/current-issue-gas-power-direct/GAS POWER Direct http://www.powermag.com/current-issue-coal-power-direct/COAL POWER Direct http://www.powermag.com/current-issue-managing-power-direct/MANAGING POWER Direct Events & Webinars http://www.electricpowerexpo.com/Electric POWER Expo http://www.ldcgasforums.com/LDC Gas Forum http://www.shaleenvirosafe.com/Shale Enviro Safe http://www.retech2013.com/Retech http://www.asiansbcusers.com/Asia SBC http://www.powermag.com/power-webinars/Webinars Shop & Jobhunt http://store.powermag.com/?limit=24Store http://www.powermag.com/powerconnect/POWER Buyer's Guide http://www.powermag.com/careers-in-powerJobs Join Us http://www.powermag.com/subscribe-to-power-print-e-newsletters-and-job-alerts/Subscribe to the print or digital magazine https://ai.omeda.com/pwr/login.doManage Subscription/Renew http://www.powermag.com/e-letter-signup/Get free eletters http://www.powermag.com/publications/Archive Follow Us http://www.facebook.com/POWERmagazineFacebook http://twitter.com/POWERmagazineTwitter http://www.linkedin.com/groups?gid=4270601&trk=myg_ugrp_ovrLinkedIn https://plus.google.com/117509753119992567288Google Plus end for mobile phones begin for tablets http://www.powermag.com/publications/Archives http://buyersguide.powermag.com/POWER Buyer’s Guide http://partners.powermag.comDecisionBriefs http://www.powermag.com/careers-in-powerJobs http://www.powermag.com/power-whitepapers/White Papers http://www.powermag.com/power-webinars/Webinars http://www.powermag.com/events-calendarEvents http://store.powermag.com/?limit=24Store end for tablets begin for desktops top-menu-block <div class="span12"> <div id="top-menu-block" class="clearfix"> <ul id="menu-topmost-menu-1" class="menu clearfix"><li class="menu-item menu-item-type-custom menu-item-object-custom menu-item-42909"><a href="http://www.powermag.com/publications/">Archives</a></li> <li class="menu-item menu-item-type-custom menu-item-object-custom menu-item-42911"><a href="http://buyersguide.powermag.com/">POWER Buyer’s Guide</a></li> <li class="menu-item menu-item-type-custom menu-item-object-custom menu-item-42913"><a href="http://partners.powermag.com">DecisionBriefs</a></li> <li class="menu-item menu-item-type-custom menu-item-object-custom menu-item-42915"><a href="http://www.powermag.com/careers-in-power">Jobs</a></li> <li class="menu-item menu-item-type-custom menu-item-object-custom menu-item-42917"><a href="http://www.powermag.com/power-whitepapers/">White Papers</a></li> <li class="menu-item menu-item-type-custom menu-item-object-custom menu-item-42919"><a href="http://www.powermag.com/power-webinars/">Webinars</a></li> <li class="menu-item menu-item-type-custom menu-item-object-custom menu-item-42921"><a href="http://www.powermag.com/events-calendar">Events</a></li> <li class="menu-item menu-item-type-custom menu-item-object-custom menu-item-42923"><a href="http://store.powermag.com/?limit=24">Store</a></li> </ul> </div> </div> end top-menu-block search-block <div class="span3"> <div id="search-block"> <form action="http://www.powermag.com/" class="form-inline"> <div class="form-container"> <input type="text" id="search-site" placeholder="Search POWER" value="" name="s" /> <button type="submit" class="search-icon">Search</button> </div> </form> </div> </div> end search-block end for desktops end header-top end .span12 end row end top header container begin #header-bottom begin header-bottom-container header-bottom-first-row begin for mobile phones http://www.powermag.comPower end for mobile phones begin for tablets/desktop logo http://www.powermag.comPower Business & Technology for the Global Generation Industry Since 1882 end logo email signup <div id="email-signup-short-block"> begin tablet form <div class="visible-tablet"> <form id="power_form_header_tablet" class='form-inline' action="http://www.elabs3.com/functions/mailing_list.html" method="post" name="UPTml225310" onSubmit="return (!(UPTvalidateform(document.UPTml225310)));"> <script type='text/javascript'> jQuery(document).ready( function () { jQuery("div.visible-tablet").on("click", "button#esignup", function() { jQuery("input#redirection-1").val("http://www.powermag.com/e-letter-signup/"); jQuery("input#redirection-1").val(jQuery("input#redirection-1").val() + "?enews-email=" + jQuery("input#enews-email-header-tablet").val()); }); }); </script> <input type="hidden" name="submitaction" value="3"> <input type="hidden" name="mlid" value="225310"> <input type="hidden" name="siteid" value="669276"> <input type="hidden" name="tagtype" value="q2"> <input type="hidden" name="demographics" value="-1"> <input type="hidden" name="redirection" id="redirection-1" value="http://www.powermag.com/e-letter-signup/"> <input type="hidden" name="append" value="on"> <input type="hidden" name="update" value="on"> <input type="hidden" name="activity" value="submit"> <input type="search" name="email" id="enews-email-header-tablet" value="" placeholder="Get the POWERnews FREE!" /> <button type="submit" class="bton" id="esignup">Sign-up</button> </form> </div> end tablet form begin desktop form <div class="visible-desktop"> <form id="power_form_header_desktop" class='form-inline' action="http://www.elabs3.com/functions/mailing_list.html" method="post" name="UPTml225310" onSubmit="return (!(UPTvalidateform(document.UPTml225310)));"> <script type='text/javascript'> jQuery(document).ready( function () { jQuery("div.visible-desktop").on("click", "button#esignup", function() { jQuery("input#redirection-2").val("http://www.powermag.com/e-letter-signup/"); jQuery("input#redirection-2").val(jQuery("input#redirection-2").val() + "?enews-email=" + jQuery("input#enews-email-header-desktop").val()); }); }); </script> <input type="hidden" name="submitaction" value="3"> <input type="hidden" name="mlid" value="225310"> <input type="hidden" name="siteid" value="669276"> <input type="hidden" name="tagtype" value="q2"> <input type="hidden" name="demographics" value="-1"> <input type="hidden" name="redirection" id="redirection-2" value="http://www.powermag.com/e-letter-signup/"> <input type="hidden" name="append" value="on"> <input type="hidden" name="update" value="on"> <input type="hidden" name="activity" value="submit"> <label for="enews-email-header-desktop">Get POWERnews <strong>FREE!</strong></label> <input type="search" name="email" id="enews-email-header-desktop" value="" placeholder="Get the POWERnews FREE!" /> <button type="submit" class="bton" id="esignup">Sign-up</button> </form> </div> end desktop form </div> end email signup member support <div id="member-support-block"> <ul class="inline"> <li class="first"><a href="http://www.powermag.com/e-letter-signup/?enews-email=">Free! Subscribe to POWER eletters</a></li> <li><a href="http://www.powermag.com/subscribe-to-power-print-e-newsletters-and-job-alerts/">Subscribe</a></li> <li><a href="https://ai.omeda.com/pwr/login.do" target="_blank">Renew</a></li> <li><a href="http://www.powermag.com/mediakit/">Advertise</a></li> </ul> </div> end member support more block More http://store.powermag.com/POWER Store http://buyersguide.powermag.com/Buyers' Guide http://partners.powermag.com/Decision Briefs http://www.powermag.com/power-whitepapers/White Papers http://www.powermag.com/power-webinars/Webinars http://www.powermag.com/events-calendar/Events http://www.powermag.com/subscribe-to-power-print-e-newsletters-and-job-alerts/Subscribe to Magazine http://www.powermag.com/e-letter-signup/Subscribe to Enewsletters https://ai.omeda.com/pwr/login.doRenew http://www.powermag.com/power-awards/POWER Awards <li><a href='http://www.powermag.com/mediakit/'>Advertise / Media Kit</a></li> http://www.powermag.com/wp-content/uploads/2016/09/pwr17_mk_edit-calendar.pdfEditorial Calendar http://cdn.powermag.com/wp-content/uploads/2014/05/1_ContributorGuidelines_2014.pdf?_ga=1.248967175.1450376133.1440038585Contribute http://www.electricpowerexpo.com/Exhibit http://www.powermag.com/about-us/About Us http://www.powermag.com/contact-us/Contact Us http://www.powermag.com/privacy-policy-terms-conditions/Privacy Policy http://www.powermag.com/feed/RSS end more block member support http://www.powermag.com/publications/Archives http://www.powermag.com/careers-in-power/Jobs http://www.powermag.com/subscribe-to-power-print-e-newsletters-and-job-alerts/Subscribe http://www.powermag.com/mediakit/Advertise end member support Search end .span9 end for tablets/desktop end header-bottom-first-row header-bottom-second-row (tablets/desktops only) visible tablet electric power logo Official Publication of: http://www.electricpowerexpo.com/Electric Power end electric power logo search-block Search end search-block begin-social-follow http://www.facebook.com/POWERmagazineFacebook http://twitter.com/POWERmagazineTwitter http://www.linkedin.com/groups?gid=4270601&trk=myg_ugrp_ovrLinkedIn https://plus.google.com/117509753119992567288Google Plus end social-follow end visible tablet end header-bottom-second-row header-bottom-third-row for mobile phones Official Publication of: http://www.electricpowerexpo.com/Electric Power end for mobile phones for tablets begin hot topics <div class="span8 offset4"> <div id="hot-topics-block"> <h3>Hot Topics:</h3> <ul class="inline"> <li class="first"><a href="">Water</a></li> <li><a href="">Instrumentation & Control</a></li> <li><a href="">Wind</a></li><li><a href="">More</a></li> </ul> </div> </div> end hot topics end for tablets for desktops begin electric power logo Official Publication of: http://www.electricpowerexpo.com/Electric Power end electric power logo begin hot topics <div class="span8"> <div id="hot-topics-block"> <h3>Hot Topics:</h3> <ul class="inline"> <li class="first"><a href="http://www.powermag.com/category/water/">Water</a></li> <li><a href="http://www.powermag.com/category/instrumentation-controls/">Instrumentation & Control</a></li> <li><a href="http://www.powermag.com/category/wind/">Wind</a></li> <li><a href="">More</a></li> </ul> </div> </div> end hot topics begin-social-follow Follow Us: http://www.facebook.com/POWERmagazineFacebook http://twitter.com/POWERmagazineTwitter http://www.linkedin.com/groups?gid=4270601&trk=myg_ugrp_ovrLinkedIn https://plus.google.com/117509753119992567288Google Plus end social-follow end for desktops end header-bottom-third-row begin header-bottom-fourth-row (tablets/desktops only) begin header-bottom-menu http://www.powermag.comHome http://www.powermag.com/category/coal/CoalRecent Articles http://www.powermag.com/no-detectable-toxins-water-near-memphis-plant-says-tva/No Detectable Toxins in Water Near Memphis Plant, Says TVA http://www.powermag.com/doe-wont-increase-regulation-on-gas-to-boost-coal-perry-says/DOE Won’t Increase Regulation on Gas to Boost Coal, Perry Says http://partners.powermag.com/sulzer/content/sulzer-service-solutionsSulzer Service Solutions SPONSORED http://www.powermag.com/dominion-ordered-to-revise-plan-for-coal-ash-at-chesapeake/Dominion Ordered to Revise Plan for Coal Ash at Chesapeake http://www.powermag.com/dynegy-divests-assets-as-part-of-engie-deal/Dynegy Divests Assets as Part of Engie Deal http://www.powermag.com/nrgs-new-plan-sell-assets-change-focus-raise-cash/NRG’s New Plan: Sell Assets, Change Focus, Raise Cash http://www.powermag.com/category/gas/GasRecent Articles http://www.powermag.com/doe-wont-increase-regulation-on-gas-to-boost-coal-perry-says/DOE Won’t Increase Regulation on Gas to Boost Coal, Perry Says http://www.powermag.com/dynegy-divests-assets-as-part-of-engie-deal/Dynegy Divests Assets as Part of Engie Deal http://partners.powermag.com/abb/content/red-and-green-to-grey-why-switch-my-hmiRed and green to grey -- Why switch my HMI? SPONSORED http://www.powermag.com/nrgs-new-plan-sell-assets-change-focus-raise-cash/NRG’s New Plan: Sell Assets, Change Focus, Raise Cash http://www.powermag.com/court-rejects-ferc-decision-pjm-pricing-rule/Court Rejects FERC Decision on PJM Pricing Rule http://www.powermag.com/fpl-seeks-state-exemption-build-new-florida-plant/FP&L Seeks State Exemption to Build New Florida Plant http://www.powermag.com/category/nuclear/NuclearRecent Articles http://www.powermag.com/doe-wont-increase-regulation-on-gas-to-boost-coal-perry-says/DOE Won’t Increase Regulation on Gas to Boost Coal, Perry Says http://www.powermag.com/appeal-filed-after-judge-dismisses-challenge-to-illinois-zec-program/Appeal Filed After Judge Dismisses Challenge to Illinois’ ZEC Program http://partners.powermag.com/mpw/content/mpws-automated-bundle-blasterMPW's Automated Bundle Blaster SPONSORED http://www.powermag.com/france-signals-intention-to-slash-nuclear-generation-by-2025/France Signals Intention to Slash Nuclear Generation by 2025 http://www.powermag.com/court-rejects-ferc-decision-pjm-pricing-rule/Court Rejects FERC Decision on PJM Pricing Rule http://www.powermag.com/russian-hackers-targeting-u-s-nuclear-plants-reports/Russian Hackers Targeting U.S. Nuclear Plants: Reports http://www.powermag.com/category/renewables/RenewablesRecent Articles http://www.powermag.com/appeal-filed-after-judge-dismisses-challenge-to-illinois-zec-program/Appeal Filed After Judge Dismisses Challenge to Illinois’ ZEC Program http://www.powermag.com/nrgs-new-plan-sell-assets-change-focus-raise-cash/NRG’s New Plan: Sell Assets, Change Focus, Raise Cash http://partners.powermag.com/osisoft/content/case-study-monitoring-health-and-performance-of-grid-scale-battery-installationsCase Study: Monitoring Health and Performance of Grid-Scale Battery Installations SPONSORED http://www.powermag.com/u-s-could-surpass-europe-in-offshore-wind-capacity-industry-advocate-posits/U.S. Could Surpass Europe in Offshore Wind Capacity, Industry Advocate Posits http://www.powermag.com/court-rejects-ferc-decision-pjm-pricing-rule/Court Rejects FERC Decision on PJM Pricing Rule http://www.powermag.com/xcel-move-forward-wind-power-expansion/Xcel Moves Forward With Wind Power Expansion http://www.powermag.com/category/connected-plant/Connected PlantRecent Articles http://www.powermag.com/pid-loop-tuning-pocket-guide-released/PID Loop Tuning Pocket Guide Released http://www.powermag.com/malware-in-modern-ics-understanding-impact-while-avoiding-hype/Malware in Modern ICS: Understanding Impact While Avoiding Hype http://www.powermag.com/the-future-is-now-connected-power-plants-are-here/The Future Is Now: Connected Power Plants Are Here http://www.powermag.com/facilitating-predictive-maintenance-of-electrical-assets-with-pervasive-sensing-strategies/Facilitating Predictive Maintenance of Electrical Assets with Pervasive Sensing Strategies http://www.powermag.com/cybersecurity-keeping-current-on-a-moving-target/Cybersecurity: Keeping Current on a Moving Target http://www.powermag.com/category/international/InternationalRecent Articles http://www.powermag.com/russian-hackers-targeting-u-s-nuclear-plants-reports/Russian Hackers Targeting U.S. Nuclear Plants: Reports http://www.powermag.com/the-big-picture-so2-success/The Big Picture: SO2 Success http://partners.powermag.com/sulzer/content/sulzer-service-solutionsSulzer Service Solutions SPONSORED http://www.powermag.com/foggy-resolution-for-russia-ukraine-gas-spat-from-arbitration-court/Foggy Resolution for Russia-Ukraine Gas Spat from Arbitration Court http://www.powermag.com/researchers-power-plant-carbon-capturing-calcium-carbonate-looping-technology-almost-market-ready/Researchers: Power Plant Carbon-Capturing Calcium Carbonate Looping Technology Almost Market-Ready http://www.powermag.com/researchers-develop-hybrid-salinity-gradient-power-technology/Researchers Develop Hybrid Salinity Gradient Power Technology http://www.powermag.com/category/business/BusinessRecent Articles http://www.powermag.com/dynegy-divests-assets-as-part-of-engie-deal/Dynegy Divests Assets as Part of Engie Deal http://www.powermag.com/nrgs-new-plan-sell-assets-change-focus-raise-cash/NRG’s New Plan: Sell Assets, Change Focus, Raise Cash http://partners.powermag.com/general-electric/content/the-cloud-advantageThe Cloud Advantage SPONSORED http://www.powermag.com/court-rejects-ferc-decision-pjm-pricing-rule/Court Rejects FERC Decision on PJM Pricing Rule http://www.powermag.com/xcel-move-forward-wind-power-expansion/Xcel Moves Forward With Wind Power Expansion http://www.powermag.com/new-jersey-plans-microgrid-projects-across-state/New Jersey Backs Studies for Microgrid Projects http://www.powermag.com/category/om/O&MRecent Articles http://www.powermag.com/borescope-inspection-saves-time-and-money-for-gas-turbine-plant/Borescope Inspection Saves Time and Money for Gas Turbine Plant http://www.powermag.com/youre-never-fully-dressed-without-flame-resistant-clothing/You're Never Fully Dressed without Flame-Resistant Clothing http://partners.powermag.com/osisoft/content/case-study-exelon-ensures-nuclear-power-plant-safety-using-online-monitoringCase Study: Exelon Ensures Nuclear Power Plant Safety Using Online Monitoring SPONSORED http://www.powermag.com/pid-loop-tuning-pocket-guide-released/PID Loop Tuning Pocket Guide Released http://www.powermag.com/evolving-workforce-and-safety-practices-for-wind-farms/Evolving Workforce and Safety Practices for Wind Farms http://www.powermag.com/how-to-develop-a-values-based-compliance-culture/How to Develop a Values-Based Compliance Culture end header-bottom-menu end header-bottom-fourth-row begin marketing-site-block <div class="row hidden-phone" style="text-align:center; padding: 5px 20px 5px 20px; font-size: 14px; font-weight: normal; color: rgb(230, 10, 10); border: 2px dashed rgb(84, 79, 79); position: relative; background-color: rgb(240, 240, 240);"><text style="font-weight: bold">POWER magazine is offering a limited number of free magazine subscriptions. <a href="https://ai.omeda.com/pwr/form1.do?p=PRWLI16" target="_blank">Subscribe today.</a> <br /> Hurry, time is running out. <b>This offer expires soon.</b></text></div> end marketing-site-block end header-bottom-container end #header-bottom begin #main content area begin main content inner container top-ad-block promo block (for everything. ads from DFP should be responsive.) OKAY DESKTOP Find all of your industry-related resources in one spot. Visit the http://store.powermag.com/?limit=24POWER store now. DART site - powermag.com/superleaderboardros end top-ad-block begin #main content area begin main content inner container content area http://www.powermag.comHome / http://www.powermag.com/category/business/Business/ Wind Turbine Repowering Is on the Horizon single entry header Wind Turbine Repowering Is on the Horizon 11/01/2016 | Lee Buchsbaum and Sonal Patel Save to myPOWER /wp-content/plugins/aicore-content/js/favorite.js custom addthis AddThis Custom End AddThis Custom end custom addthis end header content The world’s first wind farms are reaching the end of their expected lifetimes. As they become outdated, or just inefficient, many developers are considering repowering. Here’s a look at where repowering activity is happening the most and why. Since the world’s first wind turbine used to convert wind energy into electricity was built by Professor James Blyth of Anderson’s College (now University of Strathclyde) in 1887, wind turbine technology has seen a gust of advancement (see “ http://www.powermag.com/changing-winds-the-evolving-wind-turbine/Changing Winds: The Evolving Wind Turbine” in POWER’s April 2011 issue for more). Turbines have evolved from tiny 50-kW generators to mammoth 8-MW machines in just 30 years. And now, turbines with nameplate capacities of 10 MW to 20 MW are in the design stage. Over the past couple of decades, thousands of wind turbines have been installed around the world. According to the Global Wind Energy Council (GWEC), at the end of 2015, 432,883 MW of wind capacity had been commissioned globally—mostly over the last decade (Figure 1). But as wind technology rapidly improves, a substantial portion of the world’s fleet is becoming obsolete. By 2015, nearly 17% of capacity (73,957 MW) was at least 10 years old, and 9% (39,431 MW) was at least 13 years old. Some pioneering commercial wind turbines in northern Europe and California are even older. http://www.powermag.com/wp-content/uploads/2016/11/pwr_110116_windrepowering_fig1.jpg repowering data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7 repowering http://cdn.powermag.com/wp-content/uploads/2016/11/pwr_110116_windrepowering_fig1.jpg 1. Rapid growth. Most of the global cumulative wind power nameplate capacity has been recently installed, but a sizeable percentage—nearly 17%, or 73,957 MW—was at least 10 years old in 2015. Source: Global Wind Energy Council If, per industry estimates, wind turbines are designed with lifespans of between 20 and 25 years, roughly a fifth of the world’s installed wind turbines may be halfway through their lives. One consequence of this technology’s aging is reduced performance. According to some experts, wind turbine load (or capacity) factors decline markedly with age. A 2014 study from the UK’s Engineering and Physical Sciences Research Council of load factors recorded for 282 onshore wind farms in the UK between 2002 and 2012 found that wind turbines lose 1.6% (±0.2%) of their output per year, with average load factors declining from 28.5% when new to 21% at age 19. The council noted that the trend is consistent for different generations of turbine design and individual wind farms. Wind turbine operators faced with the prospect of an aging fleet typically have three options: dismantling the turbine, embarking on a lifetime extension, or repowering. According to Acciona Energia’s Mercedes Irujo Espinosa de los Monteros, a wind turbine generation life-extension expert, each option has its drawbacks. Life extensions—which entail reconditioning of major components, mainly by enhancing their constituent parts or by replacing these elements with the latest technology—could extend wind turbine availability and revenues, but the “new business approach needs to be proved,” he said. “Operators are aware that reliable figures are essential to a well-structured end-of-life plan. Initial experiences show that the weakness of [lifetime extension] lies in the apparent difficulty of estimating the remaining life of turbines and its related [operations and maintenance] plan.” Reliability can be improved with measures such as retrofitting modern control systems. There’s also the option of partial repowering, but this approach has serious limits. Installing a 3-MW nacelle on top of a 250-kW tower is generally not recommended. The increase in blade size will often cause rapid wear in gearboxes and other rotating machinery and bearings as the early infrastructure’s parameters are exceeded. Repowering—which often requires the complete dismantling and replacement of turbine equipment (including the tower and foundation) at an existing project site or just installing a new drivetrain and rotor and replacing peripheral components—has been established practice for some time. And, as Hans Kerkvliet, a consultant at Bosch & Van Rijn, noted at an April European Wind Energy Association technology workshop, “Repowering a wind farm may be a financially viable option, as some of the decommissioning and installation expenses can be shared, and the wind resource is well known, which lowers the risk of the project.” Another important consideration is that “wind turbine technology has substantially developed over the last decades, and repowering a site can considerably increase production.” However, as both Monteros and Kerkvliet noted, the decision to repower a site is often complicated by red tape, technical constraints, and several other economic, environmental, and social factors (see the sidebar, “Why Repower?”). Some of these factors have made repowering a non-feasible option in some countries. In other countries, however, it has flourished. Why Repower? Manufacturers’ warranty periods typically last between eight and 20 years, and the desire to avoid potentially expensive repairs is often a motivation for replacing older turbines. As they age, reliability drops and any scarcity of spare parts also drives up operating and maintenance costs. As well as generating both more power and greater financial returns, modern turbines fail much less often than their predecessors. Additionally, “sometimes turbine technology doesn’t perform as expected, or the wind conditions on the site are not what was assumed. Or perhaps developers want to better exploit that wind resource,” said Guenter Steininger, head of Repowering and Projects for German wind turbine manufacturer Nordex SE in an interview with POWER. One challenge is that as the first developers constructed their initial wind parks, they naturally built in the most favorable places—that is, the windiest. Now, “in Germany and Denmark, virtually all the good wind resource sites have already been taken. There are very few new areas left to exploit,” said Steininger. So in order to maximize financial return and make the best use the wind, those early turbines should “be taken down and replaced with newer, much higher performing machines,” he said. In order to repower a turbine, you generally have to replace the whole machine, including the tower. You might even need to rebuild the grid connection if you have more machines or more power. Even though you are using an existing site with a functioning permit, a developer might need to apply for a new permit because of operational changes. However, because new wind turbines generally are taller, have more exposure to faster winds, have longer blades, and cover a larger “swept” area, by replacing older turbines with newer units, one can often generate the same or more energy with fewer turbines. In areas where the viewshed has been affected and aesthetics are an issue, this change can go a long way toward appeasing local residents. In comparison to greenfield sites, projects that could be repowered already have long-term wind resource data available, which facilitates the tailoring of turbine size to the local wind conditions and further optimizes power output. Repowering, as opposed to decommissioning, preserves local jobs and continues to provide municipalities with tax revenues from the farms. Modern turbines have much better grid compliance, something that communities previously affected by voltage spikes and frequency shifts will appreciate. Additionally, many original equipment manufacturers like Nordex offer long-term maintenance and service contracts that, at least for the future, will ensure longer service lives for new turbines. EU Efforts Waft Ahead Repowering first emerged in the California and Danish wind power markets during the early 1990s. It was followed by a new wave of repowering in the Dutch and German markets in the 1990s and 2000s. Since the beginning of the millennium, wind energy growth has exploded throughout the European Union (EU). Installed capacity has increased tenfold from 12.9 GW in 2000 to 146 GW in 2015. Today, the EU accounts for roughly 40% of the global market for wind turbines. As both turbine installations and development have continued, wind energy has emerged as a competitive alternative to conventional generation. In terms of levelized cost of energy, onshore wind is currently the cheapest power generation technology in Europe, covering over 11% of EU electricity demand. However, as these wind assets age and newer, higher-capacity turbines come on the market, replacing the oldest turbines is becoming increasingly cost effective, especially because many of the pioneering turbines are nearing the end of their expected service. (See the sidebar “Offshore Wind Turbine Repowering” for the different circumstances in that market.) Offshore Wind Turbine Repowering Despite the flurry of onshore activity—and, in the Netherlands at least, “near-shore” repowering—no offshore wind turbines have been repowered, and only a handful of offshore developers are considering repowering (Figure 2). http://www.powermag.com/wp-content/uploads/2016/11/pwr_110116_windrepowering_fig2.jpg PWR_110116_WindRepowering_Fig2 data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7 PWR_110116_WindRepowering_Fig2 http://cdn.powermag.com/wp-content/uploads/2016/11/pwr_110116_windrepowering_fig2.jpg 2. On the horizon. When the five-turbine 2.75-MW Bockstigen wind farm was commissioned offshore Sweden’s Gotland Kommun region in March 1998, it was only the world’s third offshore wind farm, and the first to use drilled monopile foundations. Danish firm Momentum Gruppen bought the facility in early 2015, intending to repower it with a dozen Vestas V117-3.3 MW turbines and boost its output to 39.6 MW. Although it hasn’t yet decided to follow through, the company says it has collected a significant amount of practical knowledge about how to repower offshore wind turbines. Courtesy: Momentum So, is it time to start thinking seriously about repowering offshore turbines? “It’s probably too soon yet,” WindEurope CEO Giles Dickson told POWER. “But producers are really starting to consider this. It’s not so much that the first generation turbines are aging, but more the fact that advances in turbine size technology are so significant. Operators are thinking, ‘why keep generating with a tiny 500-kW turbine when I can repower with an 8-MW turbine that’s 16 times more powerful—and will generate not only more power, but a tremendous amount more revenue?’ ” Indeed, nearly every year the upward curve for offshore generation continues. “The average size of newly installed offshore wind turbines went up by at least 300 to 400 kW recently. The average size for new wind turbines was 4.8 MW. Now it’s 5.3 MW,” said Dickson. “European policy is on a one-way track towards the de-carbonization of electricity supply with the assumption that affordable renewable energy will increase year-on-year,” said WindEurope CEO Giles Dickson in an exclusive interview with POWER. But, according to WindEurope, of the 135 GW of onshore capacity that exists today, 76 GW will reach the end of its operational life between 2020 and 2030. In 2020 “roughly 3 GW will reach this point. In 2022, it’s 6 GW. By end of decade, roughly 10 GW a year will come to the end of their operation life.” To avoid “all that energy falling out of the system,” Dickson said, developers should begin to find ways to repower now. Though turbines are being repowered all over the continent, including in central and southern Europe, Germany and Spain are by far the two largest markets for older installed capacity. In total, Spain has 23 GW of capacity and Germany has almost 40 GW. Though Denmark was the first pioneering wind developer, its market is much smaller: only 5 GW of onshore and offshore capacity combined. While the UK is rapidly developing its wind capacity and currently has roughly 8 GW offshore and 10 GW onshore, its wind farms are generally much younger; thus, it will be some time before they need to be repowered. Repowering in the Netherlands Despite its small wind market, developers see the Netherlands as a large growth opportunity because many of the onshore turbines there are older and of smaller capacities. During 2016, RWE Energy, along with several partners and original equipment manufacturers, began installing 86 modern turbines at the Noordoostpolder wind farm on the banks of Lake IJsselmeer (Figure 3). The newly repowered area will have 48 Siemens 3-MW offshore turbines and 38 huge Enercon 7.5-MW E-126 turbines. At this site, RWE will remove its 50 WindMaster 300-kW turbines once installation of the first 12 Enercon E-126 models is complete. The WindMasters’ hub height of 30 meters (m) and rotor diameter of 25 m are dwarfed by Enercon’s 135-m hub height and 127-m rotor. http://www.powermag.com/wp-content/uploads/2016/11/pwr_110116_windrepowering_fig3.jpg PWR_110116_WindRepowering_Fig3 data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7 PWR_110116_WindRepowering_Fig3 http://cdn.powermag.com/wp-content/uploads/2016/11/pwr_110116_windrepowering_fig3.jpg 3. Revamp. A project to repower a wind farm along the dikes of the IJsselmeer on the western side of the Noordoostpolder, a municipality in the Netherlands, will entail putting up 86 onshore and near-shore wind turbines. Courtesy: RWE According to reports from RWE and WindPower Monthly, the foundations, which were completed in April, had to be specially designed for installation on the manmade dike. Only 0.5 m is below ground level, so to secure the base, 60 concrete piles were driven into the dike below it. Each foundation is 26.5 m in diameter and is made up of 180 metric tons (mt) of steel and 1,200 cubic meters of concrete. The 156-mt Enercon nacelle was placed on top of the concrete tower using a lattice-boom crane. Then the 220-mt generator and the hub with central rotor section, weighing 350 mt, were placed on top, said RWE construction manager Rick van Mensvoort. The rotor, with a diameter of 127 m, has a swept area of 12,500 square meters—the equivalent of more than 1.5 soccer fields. An Eye on Germany Today, Germany remains by far the largest wind energy market in the world. The nation installed more than 1,892 MW of new onshore wind capacity in the first half of 2016 alone, 73% more than a year ago. However, when repowering projects are added to that, the figure increases to 2,053 MW, according to a report by Deutsche Windguard. Germany’s wind industry association, BWE, predicts that the annual German repowering market will grow to 1 GW over the next few years and be worth around €1.5 billion ($1.68 billion) in turbine sales. But now, with a slate of renewable energy laws coming into effect next year, many developers are rushing to get projects in the pipeline under the old regime so as to take advantage of the existing feed-in tariffs. This includes repowering projects. While the new laws do not differentiate between new builds and repowers, repowering projects can often yield a fantastic increase in capacity. And with so many older, low-power turbines exploiting the best wind resources, they can yield a substantial increase in feed-in tariffs as well. As an example, in late June, Nordex announced that it would supply nine of its modern N117/3000 machines to the 27-MW repowering of the 20.8-MW Altenbruch I wind farm in Lower Saxony. At the time, the company said it would replace the existing 16 legacy N60/1300 wind turbines at the site with the new ones by the end of the year. Nordex noted that the repowering business model offers considerable potential for the future and accounted for 18% of all new installations in the country in 2015. Meanwhile, one of the largest repowering projects in Germany is under way in Schneebergerhof in the Rhineland-Palatinate region. Here, Juwi has replaced five Enercon E66 1.5-MW turbines with five 7.5-MW E126 machines, the largest operational wind turbines in the world today. These generate more than six times the power of the old turbines—around 20 GWh annually instead of 3 GWh. An Emerging Market in the U.S. Though California was also at the forefront of the world’s first efforts to repower wind turbines in the early 1990s, the North American wind repowering industry is minuscule compared to Europe’s. That is mostly a consequence of the fleet’s age. According to John Hensley, manager of Industry Data and Analysis at the American Wind Energy Association (AWEA), only about 3,371 MW (5%) of a total 74,813 MW of wind capacity is older than 15 years, and 620 MW is approaching 20 years (Figure 4). AWEA records only 17 repowered projects; all are in California except for two, which are in Hawaii. http://www.powermag.com/wp-content/uploads/2016/11/pwr_110116_windrepowering_fig4.jpg PWR_110116_WindRepowering_Fig4 data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7 PWR_110116_WindRepowering_Fig4 http://cdn.powermag.com/wp-content/uploads/2016/11/pwr_110116_windrepowering_fig4.jpg 4. The age of the U.S. wind fleet. Cumulative capacity represents operating capacity that is at least as old as the age indicated in the graph. For example, there is 3,371 MW of operating wind capacity 15 years or older. Similarly, 59,461 MW is four years or older. Source: AWEA Companies that have chosen to repower include Leeward Renewable Energy, NextEra Energy Resources, Terra-Gen Power, EDF Renewable Energy, BP Wind Energy, Apollo Energy Corp., GE Energy Financial Services, San Gorgonio Farms, and Marubeni. Decisions to repower continue to be anchored on various factors, Hensley said. In an earnings call earlier this year, for example, NextEra outlined plans to repower a pair of Texas wind facilities, a total 327 MW, for roughly $250 million to take advantage of federal production tax credits for repowered wind farms per a guidance issued by the Internal Revenue Service (IRS) this May. The IRS guidance essentially “opens a short window of opportunity for turbine manufacturers to make a vigorous push to upgrade turbines at older U.S. wind farms,” explained Keith Martin, a partner at law firm Chadbourne & Parke. Developers must have projects under construction by December 2016 to qualify for full tax credits. But there are caveats: “In general, the owner must spend at least four times [as much] on the repowering [compared to] the value of the equipment that the owner retains from the original project in order for the repowered turbines to qualify for new tax credits,” he said. “This test is applied on a turbine-by-turbine basis, meaning that each turbine, pad and tower is considered a separate facility. Thus, if $300,000 in equipment value is retained from the original turbine, pad and tower, then at least $1.2 million must be spent on the upgrade to claim another 10 years of production tax credits on the electricity output or an investment tax credit on the new spending.” Key Takeaways from Completed Repowering Projects Although the current repowering market outside Europe is small, it will undoubtedly grow as turbines reach the end of their lives. That’s why it’s increasingly important for developers to adopt a repowering design strategy. In the past, most operating designs were created “to match the output with the space. Developers were far more focused on short-term results and not looking 20 years ahead,” said WindEurope’s Dickson. “Today the industry is much more focused on repowering for the future,” he said. One of the clear lessons learned regards permitting: “It’s vital to ensure that the permitting regime for brownfield repowering projects is no more challenging for developers than the permitting for greenfield sites. There have been some examples in Europe where paradoxically the permitting is easier sometimes for green than repowering. That’s ominous. The industry needs to work closely with regulators to remove those obstacles. There has to be a level playing field for both investments,” he added. Though previous governments in Germany and Denmark experimented with repowering bonuses, “they were not terribly well designed and had the perverse effect of encouraging developers to perhaps repower too prematurely. There were some windfall profits that resulted as part of those systems,” said Dickson. Now that they have been rescinded, Germany and Denmark are reluctant to introduce retooled incentives. In the U.S., as individual states put together their compliance schemes for the Clean Power Plan (assuming it comes into effect), it’s also important to factor in repowering projects. “A clear lesson from the European experience is the importance of ensuring that your regulatory measures and incentives are in place to help you unlock the potential of repowering. It’s important that you not only factor in what volume of your existing assets will be ready, but that you have measures in place to allow for the repowering of those sites where it makes economic sense,” Dickson said. ■ —Lee Buchsbaum (www.lmbphotography.com), a former editor and contributor to Coal Age, Mining, and EnergyBiz, has covered coal and other industrial subjects for nearly 20 years and is a seasoned industrial photographer. Sonal Patel is a POWER associate editor. .entry-content end content footer .entry-meta end footer #post #content #primary end content area sidebar //player.ooyala.com/core/bcd83d65348d4fe7982ec22f723efaea The following div will contain the instantiated player, and is identified by id Player parameter modify some basic player behaviors and looks DART site - powermag.com/pwrvideoslot DART site - powermag.com/1sqaurerightrailros email-signup-block images/btn-bk.jpg Get POWER e-letters FREE! Sign up to receive weekly and monthly e-letters written by POWER editors. http://www.powermag.com/e-letter-signup/Subscribe now end email-signup-block Job Feed http://jobs.powermag.com/jobseeker/job/36275522/manager-conservation-renewables/orlando-utilities-commission/?site_id=2669 Manager, Conservation & Renewables - Orlando Utilities Commission - Orlando, FL http://jobs.powermag.com/jobseeker/job/36274845/electric-power-supply-market-operations-manager/zeeland-board-of-public-works/?site_id=2669 Electric Power Supply & Market Operations Manager - Zeeland, Board of Public Works - Zeeland, MI http://jobs.powermag.com/jobseeker/job/36270937/senior-associate-or-associate-asset-management/bvg-associates/?site_id=2669 Senior Associate or Associate Asset Management - BVG associates - Glasgow, Scotland http://jobs.powermag.com/jobseeker/search/results/More Jobs Search http://jobs.powermag.com/c/profile/index.cfm?site_id=2669&referrer=2669Post a Job http://jobs.powermag.com/r/jobs/post/post.cfm?site_id=2669Post a Resume DART site - powermag.com/2sqaurerightrailros Most Read Most Commented Most Shared Most Read http://www.powermag.com/four-things-that-are-killing-coal/Four Things That Are Killing Coal http://www.powermag.com/improved-maintenance-strategy-and-excellent-planning-turns-coal-plant-into-a-top-performer/Improved Maintenance Strategy and Excellent Planning Turns Coal Plant into a Top Performer http://www.powermag.com/trump-administration-swats-at-texas-in-yucca-mountain-nuclear-repository-legal-fight/Trump Administration Swats at Texas in Yucca Mountain Nuclear Repository Legal Fight http://www.powermag.com/nrgs-new-plan-sell-assets-change-focus-raise-cash/NRG’s New Plan: Sell Assets, Change Focus, Raise Cash http://www.powermag.com/senate-subcommittee-rejects-trumps-unrealistic-doe-budget-request/Senate Subcommittee Rejects Trump’s ‘Unrealistic’ DOE Budget Request Most Commented http://www.powermag.com/frances-nuclear-storm-many-power-plants-down-due-to-quality-concerns/France’s Nuclear Storm: Many Power Plants Down Due to Quality Concerns » http://www.powermag.com/coal-the-next-chapter/Coal: The Next Chapter » http://www.powermag.com/trump-administration-swats-at-texas-in-yucca-mountain-nuclear-repository-legal-fight/Trump Administration Swats at Texas in Yucca Mountain Nuclear Repository Legal Fight » http://www.powermag.com/u-s-could-surpass-europe-in-offshore-wind-capacity-industry-advocate-posits/U.S. Could Surpass Europe in Offshore Wind Capacity, Industry Advocate Posits » http://www.powermag.com/western-power-summit-2nd-annual/Western Power Summit – 4th Annual » Most Shared http://www.powermag.com/condenser-retubing/Condenser Retubing » http://www.powermag.com/boiler-chemical-cleaning-doing-it-correctly/Boiler Chemical Cleaning: Doing It Correctly » http://www.powermag.com/boiler-tuning-basics-part-ii/Boiler-Tuning Basics, Part II » http://www.powermag.com/typical-causes-of-slagging-and-fouling-problems-in-boilers/Typical Causes of Slagging and Fouling Problems in Boilers » http://www.powermag.com/battery-storage-goes-mainstream-2/Battery Storage Goes Mainstream » DART site - powermag.com/3sqaurerightrailros https://twitter.com/POWERmagazineTweets by @POWERmagazine DART site - powermag.com/4sqaurerightrailros Videos & Infographics https://www.youtube.com/embed/9Ljum3Ih23o The first nuclear reactor vessel at the Plant Vogtle expansion near Augusta, Ga., has been placed inside Unit 3, marking another major milestone for the much-watched project. This time-lapse video shows construction contractors Westinghouse and Fluor Corp. lifting the 306-ton reactor vessel into its permanent location inside the AP1000 unit’s nuclear island on November 23. The vessel, fabricated by Doosan Heavy Industries in South Korea was shipped to the construction site from the Port of Savannah on a specialized rail car, said Georgia Power on November 30. http://www.powermag.com/reactor-vessel-placed-inside-vogtle-unit-3/Read more /power-video-archive/ Visit our video archive http://www.eia.gov/todayinenergy/widgets/tied2.js Industry News http://www.business-standard.com/article/companies/jsw-energy-eyes-solar-rooftop-energy-storage-117072600041_1.htmlJSW Energy eyes solar rooftop, energy storage http://www.bbc.co.uk/news/av/world-asia-40723015/china-opens-panda-shaped-solar-power-plantChina opens panda-shaped solar power plant http://laist.com/2017/07/25/porter_ranch_protests.phpProtesters Rally Against The Planned Reopening Of Aliso Canyon Natural Gas Facility http://www.digitaljournal.com/business/funds-for-battery-storage-smart-grid-energy-tech-tops-1b-in-h1/article/498419Funds for battery storage, smart grid, energy tech tops $1B in H1 http://www.taipeitimes.com/News/editorials/archives/2017/07/26/2003675305[ LETTER ] Industry Press http://www.powermag.com/press-releases/nrel-announces-partnership-with-panasonic-and-xcel-energy/NREL Announces Partnership with Panasonic and Xcel Energy http://www.powermag.com/press-releases/game-changing-aquaxact-1688-moisture-sensor-cuts-calibration-costs/Game-Changing AquaXact 1688 Moisture Sensor Cuts Calibration Costs http://www.powermag.com/press-releases/siemens-gamesa-receives-20-turbine-order-from-indonesia-for-equis-energys-tolo-1-onshore-wind-power-plant/Siemens Gamesa receives 20-turbine order from Indonesia for Equis Energy’s ‘Tolo 1’ onshore wind power plant http://www.powermag.com/press-releases/man-diesel-turbo-finishes-power-plant-project-in-nicaragua/MAN Diesel & Turbo finishes power plant project in Nicaragua http://www.powermag.com/press-releases/lightbridge-receives-notice-of-allowance-on-key-patent-for-its-metallic-nuclear-fuel-in-south-korea/Lightbridge Receives Notice of Allowance on Key Patent for its Metallic Nuclear Fuel in South Korea http://www.powermag.com/press-releases/More Industry Press http://www.powermag.com/press-releases/nrel-announces-partnership-with-panasonic-and-xcel-energy/ http://www.powermag.com/press-releases/nrel-announces-partnership-with-panasonic-and-xcel-energy/NREL Announces Partnership with Panasonic and Xcel Energy Project Optimizes Denver’s Peña Station NEXT Net-Zero Energy Development The U.S. Department of Energy's (DOE)… http://www.powermag.com/press-releases/game-changing-aquaxact-1688-moisture-sensor-cuts-calibration-costs/ http://www.powermag.com/press-releases/game-changing-aquaxact-1688-moisture-sensor-cuts-calibration-costs/Game-Changing AquaXact 1688 Moisture Sensor Cuts Calibration Costs Servomex, the world leader in gas analysis, has launched the AquaXact 1688: a rugged, fast… http://www.powermag.com/press-releases/siemens-gamesa-receives-20-turbine-order-from-indonesia-for-equis-energys-tolo-1-onshore-wind-power-plant/ http://www.powermag.com/press-releases/siemens-gamesa-receives-20-turbine-order-from-indonesia-for-equis-energys-tolo-1-onshore-wind-power-plant/Siemens Gamesa receives 20-turbine order from Indonesia for Equis Energy’s ‘Tolo 1’ onshore wind power plant With the ‘Tolo 1’ onshore wind project, Siemens Gamesa has secured its first order in… http://www.powermag.com/press-releases/man-diesel-turbo-finishes-power-plant-project-in-nicaragua/ http://www.powermag.com/press-releases/man-diesel-turbo-finishes-power-plant-project-in-nicaragua/MAN Diesel & Turbo finishes power plant project in Nicaragua MAN Diesel & Turbo successfully commissioned eight type 18V48/60 engines in the new "Planta MAN… http://www.powermag.com/press-releases/lightbridge-receives-notice-of-allowance-on-key-patent-for-its-metallic-nuclear-fuel-in-south-korea/ http://www.powermag.com/press-releases/lightbridge-receives-notice-of-allowance-on-key-patent-for-its-metallic-nuclear-fuel-in-south-korea/Lightbridge Receives Notice of Allowance on Key Patent for its Metallic Nuclear Fuel in South Korea Lightbridge Corporation (NASDAQ:LTBR), a U.S. nuclear energy company, today announced that it has received a… end accordion-inner end accordion-body end accordion end block Upcoming Events www.radwastesummit.com2017 RadWaste Summit, 09/05 - 09/07 https://www.eucg.org/events/future.cfmEUCG 2017 Fall Conference & Workshop, 09/17 - 09/20 http://www.ctotf.org/Conference/2017/Fall/Fall2017Conference.htmlThe CTOTF 42nd Anniversary Fall 2017 Conference & Trade Show, 09/17 - 09/21 http://www.power-week.com/index.html Power Week Conference 2017, 11/13 - 11/17 http://www.electricpowerexpo.comELECTRIC POWER, PRESENTED BY POWER MAGAZINE – 20th ANNUAL, 03/19 - 03/19 https://www.world-nuclear-exhibition.comWorld Nuclear Exhibition, 06/26 - 06/28 /sidebar end sidebar end .row end main content inner container end #main end main content inner container end #main begin #footer bottom footer container Follow Us: http://www.facebook.com/POWERmagazineFacebook http://twitter.com/POWERmagazineTwitter http://www.linkedin.com/groups?gid=4270601&trk=myg_ugrp_ovrLinkedIn https://plus.google.com/117509753119992567288Google Plus http://www.powermag.com/about-usAbout http://www.powermag.com/contact-usContact http://www.powermag.com/feed/RSS http://www.powermag.com/subscribe-to-power-print-e-newsletters-and-job-alerts/Subscribe http://www.powermag.com/mediakit/Advertise http://cdn.powermag.com/wp-content/uploads/2014/05/1_ContributorGuidelines_2014.pdf?_ga=1.248967175.1450376133.1440038585Contribute More   http://www.powermag.com/privacy-policy-terms-conditions/Privacy Policy http://www.powermag.com/sitemap/Site Map http://store.powermag.com/POWER Store http://www.powermag.com/powerconnect/Buyers' Guide http://www.powermag.com/careers-in-powerJobs <li><a href="http://www.powermag.com/privacy-policy-terms-conditions/">Privacy Policy</a></li> <li><a href="/sitemap/">Site Map</a></li> © 2017 Access Intelligence, LLC – All Rights Reserved. end bottom footer container end footer START Parse.ly Include: Standard END Parse.ly Include: Standard AddThis Settings Begin //s7.addthis.com/js/300/addthis_widget.js#pubid=wp-f073570785847495eb59f667a0ba25c1 http://cdn.powermag.com/wp-content/plugins/addthis/css/output.css?ver=4.3.1 http://platform.twitter.com/widgets.js?ver=1.0.15 http://cdn.powermag.com/wp-content/plugins/page-links-to/js/new-tab.min.js?ver=2.9.8 http://www.powermag.com/wp-content/plugins/aicms-popup/aicms-popup.js?ver=4.3.1 http://apps.decisionbriefs.com/widgets/component/power/related_content?topics%5Bcategory%5D=Business%7CInternational%7CO%26M%7CRenewables%7CWind&topics%5Bpost_tag%5D=repowering%7Cwind%7Cwind+t http://cdn.powermag.com/wp-content/plugins/disqus-comment-system/media/js/disqus.js?ver=4.3.1 http://apps.decisionbriefs.com/widgets/component/power/modals?ver=4.3.1 http://cdn.powermag.com/wp-content/plugins/disqus-comment-system/media/js/count.js?ver=4.3.1 wp_footer AddThis Smart Layers BEGIN //s7.addthis.com/js/300/addthis_widget.js#pubid=xa-5203da1671418d12 AddThis Smart Layers END <script>var core_market='power'; document.write('<scri'+'pt src="http://apps2cdn.decisionbriefs.com/site/load2/main3.js"></scr'+'ipt>');</script> <script type="text/javascript" defer="defer" src="http://www7.accessintel.com/tag/v7pcylsy0eu.js"></script> http://www.powermag.com/wp-content/themes/powermag/js/remove_empty_article_divs.js START EMBED CODE https://api.b2c.com/api/init-2886ngru5uzeozmbr3v.js https://api.b2c.com/api/noscript-2886ngru5uzeozmbr3v.gif END EMBED CODE