Loading...
HomeMy WebLinkAbout20170912Utah_DPU Set 10 (1-5).docxPATRICIA E. SCHMID (#4908) JUSTIN JETTER (#13257) Assistant Attorney GeneralsCounsel for the DIVISION OF PUBLIC UTILITIESSEAN REYES (#7969)Attorney General of Utah 160 E 300 S, 5th Floor P.O. Box 140857 Salt Lake City, UT 84114-0857 Telephone (801) 366-0380 BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH In the Matter of Rocky Mountain Power’s Application for Approval of Resource Decision to Repower Wind Facilities _________________________________ ) ) ) ) ) ) )_________________-__ DOCKET NO. 17-035-39 Division of Public Utilities 10thSet of Data Requests to ROCKY MOUNTAIN POWER September 7, 2017 _________________________________ Please send an electronic copy and a paper copy of your Data Response to: Erika Tedder – Paralegal Division of Public Utilities 160 E 300 S, 4th Floor Salt Lake City, UT 84114 PLEASE E-MAIL YOUR DATA RESPONSE TO ERIKA TEDDER dpudatarequest@utah.gov dkoehler@daymarkea.com dpeaco@daymarkea.com aafnan@daymarkea.com jbower@daymarkea.com Response should include where applicable native WORD and EXCEL documents with intact formulae. Your Data Response is not consideredreceived until an electronic copy is furnished and received. Link Direct Testimony. In reference to Table 2 and Table 3 of the Link Direct Testimony, please provide versions of these benefits tables on a project-by-project basis for each Repowering Project. Provide all supporting workpapers used to calculate the net benefits of each project under the various scenarios. Link Direct Testimony. In reference to Exhibit RTL-1, please provide all analysis and documentation supporting the forecast of incremental energy production on a project-by-project basis. Following questions refer to confidential workpapers: Link Direct Testimony Workpapers. Regarding the project revenue requirements included in the “Repower Results Direct Testimony.xlsm” workpaper: Please provide a detailed accounting of revenue requirements on a project by project basis. Please provide a reconciliation of the annual revenue requirements for the repowering projects (see, e.g. row 89 of the “Price-Policy Annual – PaR” sheet) with the 20 year levelized values (see, e.g. row 62 of the “Price-Policy Annual – PaR” sheet. This reconciliation should demonstrate how these representations of project costs tie to the same set of project-by-project cost inputs. Please also provide a reconciliation of these values to the project-specific capital cost values included in Exhibit RTL-1. Link Direct Testimony Workpapers. Regarding the Forward Price Curve Values provided in the Wind Project workpapers (e.g. “IRP Repower LGIA Limit v13 WIC LJ.xlsm”): Please provide the source of the FPC values provided in this workpaper (Rows 127:131 of the ‘Existing’, ‘ExistRepwr’, and ‘Repower’ sheets). Please explain all FPC discrepancies between the worksheets. For example, the Wyoming FPC values in the ‘Repower’ sheet are significantly lower than the values in the ‘Existing’ sheet. Link Direct Testimony Workpapers. Regarding the Generation (MWHs) values provided in the Wind Project workpapers (e.g. “IRP Repower LGIA Limit v13 WIC LJ.xlsm”): Please provide the source of the generation values provided in this workpaper (Rows 9:21 of the ‘Existing’, ‘ExistRepwr’, and ‘Repower’ sheets). Please reconcile these values with the generation values provided in Exhibit RTL-1 and explain all discrepancies. Please explain why some projects show a decrease in annual generation after repowering (see, e.g. Glenrock III). DPU Requestor:Tuttle (801) 530-6223 Erika Tedder - (801) 530-6653 cc:Service List